Description:US 90 FRONTAGE RDS: LA 14 LOOP & DARNALL
Type Construction:PAVMENT PATCHING, IN-PLACE CEMENT TREATED SUBGRADE, IN-PLACE CEMENT STABLIZED BASE COURSE, LIME TREATMENT, MILLING ASPHALT CONCRETE, CONCRETE DRIVES, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$4,276,319.30
Rank License BidderConstruction Bid
151821Elliott Construction, LLC$3,580,855.66
233663Glenn Lege Construction LLC$3,895,477.80
334356Prairie Contractors LLC$4,368,784.41
446747Triumph Construction, LLC$5,517,692.49


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Elliott Construction, LLC
- 2 -
Glenn Lege Construction LLC
- 3 -
Prairie Contractors LLC
- 4 -
Triumph Construction, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-00010Removal of Brick Mailbox2     EACH200.00400.00590.851,181.702,000.004,000.001,130.002,260.00
0002202-02-02000Removal of Asphalt Drives 108     SQYD40.004,320.0022.322,410.5675.008,100.0018.001,944.00
0003202-02-06100Removal of Concrete Walks and Drives 2,119     SQYD30.0063,570.0030.3664,332.8437.5079,462.5042.0088,998.00
0004202-02-32180Removal of Pipe Headwalls 2     EACH1,175.002,350.004,103.138,206.261,250.002,500.001,130.002,260.00
0005203-07-00100Borrow (Vehicular Measurement) 395     CUYD40.0015,800.0034.5213,635.4050.0019,750.0055.0021,725.00
0006204-05-00100Temporary Sediment Check Dams (Hay) 40     EACH155.006,200.00174.236,969.20155.006,200.0036.001,440.00
0007303-01-00200In-Place Cement Stabilized Base Course (8-1/2" Thick) 42,785     SQYD13.00556,205.0012.22522,832.7014.00598,990.0012.00513,420.00
0008303-02-00100Removal of Existing Patches 250     SQYD30.007,500.0019.704,925.0095.0023,750.0018.004,500.00
0009304-01-00100Lime 136.16  TON375.0051,060.00298.1640,597.47700.0095,312.001,764.00240,186.24
0010304-03-00300Lime Treatment (Type C) (10" Thick) 6,538     SQYD7.0045,766.006.0539,554.907.5049,035.004.0026,152.00
0011304-03-00400Lime Treatment (Type C) (12" Thick) 4,158     SQYD7.0029,106.009.4939,459.427.5031,185.006.0024,948.00
0012309-01-10000In-Place Cement Treated Subgrade (10" Thick) 26,154     SQYD9.00235,386.009.92259,447.6815.00392,310.0013.00340,002.00
0013309-01-12000In-Place Cement Treated Subgrade (12" Thick) 16,631     SQYD10.00166,310.0011.77195,746.8715.00249,465.0013.00216,203.00
0014401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 831     CUYD60.0049,860.0071.2759,225.3766.0054,846.00116.0096,396.00
0015402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 40     CUYD75.003,000.00173.326,932.80100.004,000.00103.004,120.00
0016502-01-00100Asphalt Concrete 12,254.9   TON128.001,568,627.20135.041,654,901.70131.001,605,391.90225.002,757,352.50
0017502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 245.9   TON195.0047,950.50229.5556,446.35350.0086,065.00249.0061,229.10
0018509-01-00100Milling Asphalt Pavement 28,962     SQYD3.85111,503.702.4470,667.286.50188,253.006.00173,772.00
0019509-02-00100Contractor Retained Reclaimed Asphalt Pavement -1,900     CUYD0.01-19.000.01-19.000.01-19.000.02-38.00
0020510-01-00104Pavement Patching (10" Minimum Thickness) 146     SQYD125.0018,250.00185.0827,021.68313.0045,698.00138.0020,148.00
0021510-02-00100Pavement Widening 10" Thick53     SQYD250.0013,250.00228.7312,122.69313.0016,589.00141.007,473.00
0022602-02-00200Cleaning and Resealing Existing Longitudinal Pavement Joints 75     LNFT8.00600.0017.421,306.5015.001,125.004.00300.00
0023602-02-00300Cleaning and Resealing Existing Transverse Pavements Joints 194     LNFT8.001,552.0017.423,379.4815.002,910.004.00776.00
0024701-10-01060Reinforced Concrete Pipe (Extension) (24") 36     LNFT335.0012,060.00225.358,112.60450.0016,200.0069.002,484.00
0025701-14-00100Cleaning Existing Pipes (18" x 42' RCP)42     LNFT25.001,050.008.87372.5460.002,520.00150.006,300.00
0026701-15-00100Concrete Collar 2     EACH2,000.004,000.001,313.002,626.003,000.006,000.001,470.002,940.00
0027706-02-00200Concrete Drive (6" Thick) 1,016.9   SQYD110.00111,859.0085.9787,422.89165.00167,788.5081.0082,368.90
0028706-02-00300Concrete Drive (8" Thick) 934.1   SQYD120.00112,092.00101.8095,091.38185.00172,808.5094.0087,805.40
0029712-02-00100Sacked Concrete Revetment 4     SQYD500.002,000.00692.612,770.44850.003,400.00863.003,452.00
0030712-04-00100Flexible Revetment 6     SQYD500.003,000.00462.182,773.08850.005,100.00957.005,742.00
0031713-01-00100Temporary Signs and Barricades 1     LUMP35,000.0035,000.0080,925.4480,925.44100,000.00100,000.0017,310.0017,310.00
0032713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 5.929 MILE750.004,446.75696.904,131.923,500.0020,751.50763.004,523.83
0033713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 2.977 MILE660.001,964.82696.902,074.671.002.98834.002,482.82
0034713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 20.233 MILE880.0017,805.041,161.5023,500.631.0020.231,175.0023,773.78
0035722-02-00100Project Site Laboratory (Equipped) 1     EACH10,000.0010,000.0019,038.5019,038.5030,000.0030,000.0011,540.0011,540.00
0036724-01-00100Rumble Strips (Centerline) 1.403 MILE1,100.001,543.301,161.501,629.581,200.001,683.602,595.003,640.79
0037724-02-00100Rumble Strips (Shoulder/Edge) 3.836 MILE1,100.004,219.601,161.504,455.511,200.004,603.201,682.006,452.15
0038726-01-00100Bedding Material 3.9   CUYD150.00585.00181.19706.64850.003,315.00108.00421.20
0039727-01-00100Mobilization 1     LUMP200,000.00200,000.00307,898.50307,898.50175,000.00175,000.00565,820.00565,820.00
0040729-16-00200Object Marker Assembly (Type 2) 36     EACH88.003,168.0092.923,345.1285.003,060.0093.003,348.00
0041731-02-00100Reflectorized Raised Pavement Markers 463     EACH6.002,778.006.973,227.116.002,778.008.003,704.00
0042732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 95     LNFT17.001,615.0011.621,103.9018.001,710.0016.001,520.00
0043732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 8.137 MILE4,620.0037,592.946,388.2551,981.195,000.0040,685.006,396.0052,044.25
0044732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 1.383 MILE1,320.001,825.563,019.904,176.521,500.002,074.503,298.004,561.13
0045732-05-00100Removal of Existing Markings 0.009 MILE22,000.00198.005,807.5052.2725,000.00225.0052,223.00470.01
0046735-01-00100Mailboxes 17     EACH22.00374.0023.23394.9110.00170.0024.00408.00
0047735-02-00100Mailbox Supports (Single) 17     EACH275.004,675.00290.384,936.46450.007,650.00289.004,913.00
0048739-01-00100Hydro-Seeding 0.79  ACRE4,375.003,456.254,065.253,211.558,000.006,320.003,241.002,560.39
0049740-01-00100Construction Layout 1     LUMP5,000.005,000.0088,233.6088,233.6030,000.0030,000.0011,540.0011,540.00
             
  CONTRACTOR TOTAL   3,580,855.66 3,895,477.80 4,368,784.41 5,517,692.49