Proposal:H.016202.6
Parish:Iberia
Routes:LA 14, LA 320
Description:LA14&320:DELCAMBRE & OLIVIER MB SUB CBLS
Type Construction:DRAINAGE STRUCTURES, MOVABLE BRIDGE REPAIRS, SUBMARINE CABLE REPLACEMENT, AND RELATED WORK.
Estimated Construction Cost:$2,555,279.45
| Rank | License | Bidder | Construction Bid |
| 1 | 00009 | Coastal Contractors, LLC | $1,374,882.00 |
| 2 | 26435 | C.E.C., Inc. | $2,558,820.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Coastal Contractors, LLC | - 2 - C.E.C., Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions (Delcambre) | 1 | LUMP | 50,000.00 | 50,000.00 | 15,000.00 | 15,000.00 | | 0002 | 701-03-01160 | Storm Drain Pipe (72" RCP) (Delcambre) | 16 | LNFT | 1,900.00 | 30,400.00 | 3,825.00 | 61,200.00 | | 0003 | 701-05-01181 | Side Drain Pipe (60" RCP/CPPPDW/CPPPTW/CMP) (Delcambre) | 44 | LNFT | 2,600.00 | 114,400.00 | 1,700.00 | 74,800.00 | | 0004 | 701-15-00100 | Concrete Collar (Delcambre) | 1 | EACH | 15,000.00 | 15,000.00 | 15,720.00 | 15,720.00 | | 0005 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) (Delcambre) | 56 | LNFT | 800.00 | 44,800.00 | 6,700.00 | 375,200.00 | | 0006 | 702-02-00909 | Manholes (MH-14X9) (Delcambre) | 2 | EACH | 43,000.00 | 86,000.00 | 130,000.00 | 260,000.00 | | 0007 | 711-01-04020 | Riprap (55 lb, 24" Thick) (Delcambre) | 24 | SQYD | 320.00 | 7,680.00 | 1,940.00 | 46,560.00 | | 0008 | 711-04-00100 | Geotextile Fabric (Delcambre) | 24 | SQYD | 40.00 | 960.00 | 140.00 | 3,360.00 | | 0009 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 21,000.00 | 21,000.00 | | 0010 | 726-01-00100 | Bedding Material (Delcambre) | 12.4 | CUYD | 455.00 | 5,642.00 | 1,450.00 | 17,980.00 | | 0011 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 200,000.00 | 200,000.00 | | 0012 | 740-01-00100 | Construction Layout (Delcambre) | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | | 0013 | TS-821-02100 | Vertical Lift Bridge Machinery (Span Brakes) (Delcambre) | 1 | LUMP | 150,000.00 | 150,000.00 | 196,000.00 | 196,000.00 | | 0014 | TS-822-09100 | Electrical System (Conduit and Conductor Runs) (Olivier) | 1 | LUMP | 35,000.00 | 35,000.00 | 40,000.00 | 40,000.00 | | 0015 | TS-822-09100 | Electrical System (Run 2) (Delcambre) | 1 | LUMP | 15,000.00 | 15,000.00 | 27,000.00 | 27,000.00 | | 0016 | TS-822-09100 | Electrical System (Submarine Cable Repl) (Delcambre) | 1 | LUMP | 440,000.00 | 440,000.00 | 685,000.00 | 685,000.00 | | 0017 | TS-822-09100 | Electrical System (Submarine Cable Repl) (Olivier) | 1 | LUMP | 275,000.00 | 275,000.00 | 510,000.00 | 510,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,374,882.00 | | 2,558,820.00 |
|