Proposal:H.016148.6
Parish:Jefferson
Routes:I-10
Description:I-10: NEAR SPILLWAY BRIDGE OVERLAY
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$733,894.40
| Rank | License | Bidder | Construction Bid |
| 1 | 76669 | Alonso LLC | $595,155.56 |
| 2 | 06276 | Barriere Construction Co., LLC | $1,169,024.38 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $1,379,379.86 |
| 4 | 73475 | Madden Gulf Coast, LLC | $1,543,643.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Alonso LLC | - 2 - Barriere Construction Co., LLC | - 3 - Boh Bros. Construction Co., LLC. | - 4 - Madden Gulf Coast, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 750 | LNFT | 10.00 | 7,500.00 | 8.00 | 6,000.00 | 15.00 | 11,250.00 | 8.00 | 6,000.00 | | 0002 | 203-01-00100 | General Excavation | 23 | CUYD | 100.00 | 2,300.00 | 212.00 | 4,876.00 | 350.00 | 8,050.00 | 350.00 | 8,050.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 80 | CUYD | 80.00 | 6,400.00 | 175.00 | 14,000.00 | 150.00 | 12,000.00 | 330.00 | 26,400.00 | | 0004 | 501-03-00100 | Thin Asphalt Concrete (OGFC) | 328.8 | TON | 220.00 | 72,336.00 | 500.00 | 164,400.00 | 600.00 | 197,280.00 | 570.00 | 187,416.00 | | 0005 | 502-01-00100 | Asphalt Concrete | 1,022.5 | TON | 220.00 | 224,950.00 | 314.00 | 321,065.00 | 280.00 | 286,300.00 | 435.00 | 444,787.50 | | 0006 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 209.4 | TON | 220.00 | 46,068.00 | 300.00 | 62,820.00 | 475.00 | 99,465.00 | 245.00 | 51,303.00 | | 0007 | 509-01-00100 | Milling Asphalt Pavement | 10,580 | SQYD | 3.50 | 37,030.00 | 14.70 | 155,526.00 | 9.25 | 97,865.00 | 24.00 | 253,920.00 | | 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -494 | CUYD | 0.01 | -4.94 | 0.01 | -4.94 | 0.01 | -4.94 | 0.01 | -4.94 | | 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 58 | SQYD | 200.00 | 11,600.00 | 300.00 | 17,400.00 | 525.00 | 30,450.00 | 355.00 | 20,590.00 | | 0010 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 662.5 | LNFT | 37.00 | 24,512.50 | 37.00 | 24,512.50 | 50.00 | 33,125.00 | 36.00 | 23,850.00 | | 0011 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 90.00 | 4,500.00 | 72.50 | 3,625.00 | 95.00 | 4,750.00 | 72.50 | 3,625.00 | | 0012 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 125.00 | 12,500.00 | 125.00 | 12,500.00 | 150.00 | 15,000.00 | 125.00 | 12,500.00 | | 0013 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 4,000.00 | 12,000.00 | 3,300.00 | 9,900.00 | 4,500.00 | 13,500.00 | 3,300.00 | 9,900.00 | | 0014 | 707-01-00100 | Concrete Curb | 54 | LNFT | 65.00 | 3,510.00 | 190.00 | 10,260.00 | 130.00 | 7,020.00 | 50.00 | 2,700.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 100,000.00 | 100,000.00 | 300,000.00 | 300,000.00 | 310,000.00 | 310,000.00 | | 0016 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.48 | MILE | 800.00 | 2,784.00 | 750.00 | 2,610.00 | 875.00 | 3,045.00 | 750.00 | 2,610.00 | | 0017 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.718 | MILE | 1,000.00 | 2,718.00 | 1,200.00 | 3,261.60 | 1,250.00 | 3,397.50 | 1,200.00 | 3,261.60 | | 0018 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 3,000.00 | 6,000.00 | 1,500.00 | 3,000.00 | 4,250.00 | 8,500.00 | 2,500.00 | 5,000.00 | | 0019 | 716-01-00100 | Mulch (Vegetative) | 0.5 | TON | 4,000.00 | 2,000.00 | 4,267.00 | 2,133.50 | 5,250.00 | 2,625.00 | 4,266.97 | 2,133.49 | | 0020 | 717-01-00100 | Seeding | 6.18 | LB | 20.00 | 123.60 | 12.00 | 74.16 | 15.00 | 92.70 | 11.70 | 72.31 | | 0021 | 718-01-00100 | Fertilizer | 206 | LB | 2.00 | 412.00 | 1.00 | 206.00 | 1.00 | 206.00 | 0.99 | 203.94 | | 0022 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.454 | MILE | 1,600.00 | 726.40 | 227.00 | 103.06 | 650.00 | 295.10 | 1,000.00 | 454.00 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 | 100,000.00 | 100,000.00 | 125,000.00 | 125,000.00 | 105,000.00 | 105,000.00 | | 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 200.00 | 800.00 | 85.00 | 340.00 | 125.00 | 500.00 | 85.00 | 340.00 | | 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 106 | EACH | 12.00 | 1,272.00 | 10.00 | 1,060.00 | 15.00 | 1,590.00 | 10.00 | 1,060.00 | | 0026 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 526 | LNFT | 4.50 | 2,367.00 | 4.00 | 2,104.00 | 5.50 | 2,893.00 | 4.00 | 2,104.00 | | 0027 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.453 | MILE | 9,000.00 | 4,077.00 | 7,500.00 | 3,397.50 | 8,500.00 | 3,850.50 | 7,500.00 | 3,397.50 | | 0028 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.58 | MILE | 2,800.00 | 1,624.00 | 1,500.00 | 870.00 | 2,250.00 | 1,305.00 | 1,500.00 | 870.00 | | 0029 | 732-04-05040 | Plastic Pavement Legends and Symbols (EXIT ONLY) | 1 | EACH | 600.00 | 600.00 | 500.00 | 500.00 | 650.00 | 650.00 | 500.00 | 500.00 | | 0030 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,000.00 | 3,000.00 | 100,000.00 | 100,000.00 | 32,500.00 | 32,500.00 | 12,000.00 | 12,000.00 | | 0031 | 815-03-00300 | Joint Seal (Poured) | 126 | LNFT | 25.00 | 3,150.00 | 50.00 | 6,300.00 | 30.00 | 3,780.00 | 50.00 | 6,300.00 | | 0032 | 202-02-02020 | Removal of Asphalt Pavement | 1,715 | SQYD | 20.00 | 34,300.00 | 19.00 | 32,585.00 | 40.00 | 68,600.00 | 20.00 | 34,300.00 | | 0033 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 4,000.00 | 4,000.00 | 3,600.00 | 3,600.00 | 4,500.00 | 4,500.00 | 3,000.00 | 3,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 595,155.56 | | 1,169,024.38 | | 1,379,379.86 | | 1,543,643.40 |
|