Proposal:H.015849.6
Parish:St. Landry
Routes:US 190
Description:US 190: R-CUT AT LA 741
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, SUBGRADE TREATMENT, CLASS II BASE COURSE, PAVEMENT WIDENING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$4,751,826.87
| Rank | License | Bidder | Construction Bid |
| 1 | 52306 | SIEMA CONSTRUCTION, LLC | $5,502,128.58 |
| 2 | 06276 | Barriere Construction Co., LLC | $5,996,705.27 |
| 3 | 46747 | Triumph Construction, LLC | $8,001,877.12 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SIEMA CONSTRUCTION, LLC | - 2 - Barriere Construction Co., LLC | - 3 - Triumph Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.384 | LUMP | 8,100.00 | 8,100.00 | 119,678.00 | 119,678.00 | 50,400.00 | 50,400.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,250.00 | 5,250.00 | 28,495.00 | 28,495.00 | 41,440.00 | 41,440.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 5,501.7 | SQYD | 10.00 | 55,017.00 | 32.50 | 178,805.25 | 32.00 | 176,054.40 | | 0004 | 202-02-38240 | Removal of Signs and Supports | 14 | EACH | 120.00 | 1,680.00 | 40.00 | 560.00 | 41.00 | 574.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 160,000.00 | 160,000.00 | 320,658.00 | 320,658.00 | 133,570.00 | 133,570.00 | | 0006 | 204-02-00100 | Temporary Hay Bales | 164 | EACH | 35.00 | 5,740.00 | 28.00 | 4,592.00 | 36.00 | 5,904.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 11,580 | LNFT | 2.00 | 23,160.00 | 2.25 | 26,055.00 | 4.00 | 46,320.00 | | 0008 | 302-02-10020 | Class II Base Course (10" Thick) (Crushed Stone) | 12,047.5 | SQYD | 42.00 | 505,995.00 | 40.00 | 481,900.00 | 26.00 | 313,235.00 | | 0009 | 302-03-00100 | Base Drain Outlet | 27 | EACH | 900.00 | 24,300.00 | 1,481.75 | 40,007.25 | 2,402.00 | 64,854.00 | | 0010 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | 12,048 | SQYD | 18.00 | 216,864.00 | 17.50 | 210,840.00 | 60.00 | 722,880.00 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 12 | CUYD | 230.00 | 2,760.00 | 300.00 | 3,600.00 | 90.00 | 1,080.00 | | 0012 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 500 | SQYD | 45.00 | 22,500.00 | 15.00 | 7,500.00 | 105.00 | 52,500.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 10,551 | TON | 179.00 | 1,888,629.00 | 167.75 | 1,769,930.25 | 289.00 | 3,049,239.00 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 74.8 | TON | 395.00 | 29,546.00 | 363.00 | 27,152.40 | 341.00 | 25,506.80 | | 0015 | 509-01-00100 | Milling Asphalt Pavement | 45,432 | SQYD | 3.25 | 147,654.00 | 3.00 | 136,296.00 | 18.00 | 817,776.00 | | 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,893 | CUYD | 0.01 | -18.93 | 0.01 | -18.93 | 0.10 | -189.30 | | 0017 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 40 | SQYD | 210.00 | 8,400.00 | 369.25 | 14,770.00 | 318.00 | 12,720.00 | | 0018 | 510-02-00100 | Pavement Widening 10 Minimum Thickness | 49.3 | SQYD | 150.00 | 7,395.00 | 199.00 | 9,810.70 | 181.00 | 8,923.30 | | 0019 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 115,164 | INLF | 0.65 | 74,856.60 | 0.01 | 1,151.64 | 2.00 | 230,328.00 | | 0020 | 701-01-01021 | Cross Drain Pipe (30" RCP) | 22 | LNFT | 225.00 | 4,950.00 | 456.00 | 10,032.00 | 77.00 | 1,694.00 | | 0021 | 701-01-01120 | Cross Drain Pipe (60" RCP) | 43 | LNFT | 1,000.00 | 43,000.00 | 718.00 | 30,874.00 | 234.00 | 10,062.00 | | 0022 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 508 | LNFT | 105.00 | 53,340.00 | 165.00 | 83,820.00 | 26.00 | 13,208.00 | | 0023 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 500 | LNFT | 105.00 | 52,500.00 | 188.00 | 94,000.00 | 42.00 | 21,000.00 | | 0024 | 701-06-00020 | Side Drain Pipe Arch (18" Equiv. RCPA) | 400 | LNFT | 110.00 | 44,000.00 | 205.00 | 82,000.00 | 47.00 | 18,800.00 | | 0025 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 4 | LNFT | 420.00 | 1,680.00 | 570.00 | 2,280.00 | 38.00 | 152.00 | | 0026 | 701-14-00100 | Cleaning Existing Pipes 18" and 60" Pipe; 3' x 4' Box Culvert | 177 | LNFT | 27.65 | 4,894.05 | 91.00 | 16,107.00 | 22.00 | 3,894.00 | | 0027 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,165.00 | 1,165.00 | 4,331.00 | 4,331.00 | 1,960.00 | 1,960.00 | | 0028 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 1,073 | LNFT | 7.75 | 8,315.75 | 1.00 | 1,073.00 | 28.00 | 30,044.00 | | 0029 | 702-02-00100 | Manholes (MH-06) | 1 | EACH | 7,300.00 | 7,300.00 | 9,688.00 | 9,688.00 | 3,130.00 | 3,130.00 | | 0030 | 702-03-00100 | Catch Basins (CB-01) | 11 | EACH | 6,500.00 | 71,500.00 | 6,838.00 | 75,218.00 | 2,710.00 | 29,810.00 | | 0031 | 702-03-00500 | Catch Basins (CB-06) | 11 | EACH | 10,000.00 | 110,000.00 | 10,030.00 | 110,330.00 | 2,887.00 | 31,757.00 | | 0032 | 702-03-00600 | Catch Basins (CB-07) | 6 | EACH | 11,850.00 | 71,100.00 | 14,247.00 | 85,482.00 | 4,120.00 | 24,720.00 | | 0033 | 702-03-00700 | Catch Basins (CB-08) | 2 | EACH | 22,000.00 | 44,000.00 | 19,148.00 | 38,296.00 | 9,825.00 | 19,650.00 | | 0034 | 702-07-00100 | Cross Drain Safety End (Type 1) | 2 | EACH | 6,650.00 | 13,300.00 | 9,118.00 | 18,236.00 | 2,245.00 | 4,490.00 | | 0035 | 702-07-00200 | Cross Drain Safety End (Type 2) | 4 | EACH | 24,500.00 | 98,000.00 | 7,978.00 | 31,912.00 | 9,238.00 | 36,952.00 | | 0036 | 702-08-00100 | Side Drain Safety End (Type 1) | 2 | EACH | 3,850.00 | 7,700.00 | 9,118.00 | 18,236.00 | 5,425.00 | 10,850.00 | | 0037 | 703-01-00100 | Shoulder Underdrain Systems | 3,300 | LNFT | 20.00 | 66,000.00 | 21.00 | 69,300.00 | 15.00 | 49,500.00 | | 0038 | 706-03-00825 | Incidental Concrete Paving (13" Thick) | 123.2 | SQYD | 140.00 | 17,248.00 | 200.00 | 24,640.00 | 151.00 | 18,603.20 | | 0039 | 706-03-00850 | Incidental Concrete Paving (14" Thick) | 757.4 | SQYD | 150.00 | 113,610.00 | 199.00 | 150,722.60 | 158.00 | 119,669.20 | | 0040 | 707-03-00100 | Combination Concrete Curb and Gutter | 3,251.8 | LNFT | 32.00 | 104,057.60 | 55.00 | 178,849.00 | 44.00 | 143,079.20 | | 0041 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 133 | SQYD | 115.00 | 15,295.00 | 216.00 | 28,728.00 | 170.00 | 22,610.00 | | 0042 | 711-04-00100 | Geotextile Fabric | 133 | SQYD | 10.00 | 1,330.00 | 4.00 | 532.00 | 15.00 | 1,995.00 | | 0043 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 440,000.00 | 440,000.00 | 34,610.00 | 34,610.00 | | 0044 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,432 | LNFT | 0.25 | 358.00 | 1.00 | 1,432.00 | 1.00 | 1,432.00 | | 0045 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.386 | MILE | 441.50 | 1,936.42 | 405.00 | 1,776.33 | 910.00 | 3,991.26 | | 0046 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.702 | MILE | 800.00 | 3,761.60 | 683.00 | 3,211.47 | 904.00 | 4,250.61 | | 0047 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 21.455 | MILE | 1,140.00 | 24,458.70 | 911.00 | 19,545.51 | 137.00 | 2,939.34 | | 0048 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 1,425 | EACH | 6.85 | 9,761.25 | 5.00 | 7,125.00 | 8.00 | 11,400.00 | | 0049 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 312 | EACH | 242.00 | 75,504.00 | 1.00 | 312.00 | 89.00 | 27,768.00 | | 0050 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 502 | EACH | 171.00 | 85,842.00 | 1.00 | 502.00 | 81.00 | 40,662.00 | | 0051 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 4,905.00 | 19,620.00 | 6,000.00 | 24,000.00 | 26,535.00 | 106,140.00 | | 0052 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 20,000.00 | 20,000.00 | 23,000.00 | 23,000.00 | 11,540.00 | 11,540.00 | | 0053 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 4.386 | MILE | 345.00 | 1,513.17 | 1,967.00 | 8,627.26 | 2,075.00 | 9,100.95 | | 0054 | 725-01-00100 | Temporary Detour Roads | 602.7 | SQYD | 102.00 | 61,475.40 | 88.00 | 53,037.60 | 401.00 | 241,682.70 | | 0055 | 726-01-00100 | Bedding Material | 171.9 | CUYD | 170.00 | 29,223.00 | 1.00 | 171.90 | 89.00 | 15,299.10 | | 0056 | 727-01-00100 | Mobilization | 1 | LUMP | 500,000.00 | 500,000.00 | 580,000.00 | 580,000.00 | 851,550.00 | 851,550.00 | | 0057 | 728-01-01100 | Jacked or Bored Pipe (30") | 106 | LNFT | 1,800.00 | 190,800.00 | 1,047.00 | 110,982.00 | 866.00 | 91,796.00 | | 0058 | 729-01-00100 | Sign (Type A) | 210 | SQFT | 34.50 | 7,245.00 | 35.00 | 7,350.00 | 35.00 | 7,350.00 | | 0059 | 729-16-00200 | Object Marker Assembly (Type 2) | 10 | EACH | 85.50 | 855.00 | 85.00 | 850.00 | 87.00 | 870.00 | | 0060 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 103.00 | 412.00 | 103.00 | 412.00 | 105.00 | 420.00 | | 0061 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 8 | EACH | 211.00 | 1,688.00 | 211.00 | 1,688.00 | 214.00 | 1,712.00 | | 0062 | 729-22-00200 | Perforated Square Tubing Post with 2-1/4" Omni-Directional Anchor | 16 | EACH | 255.00 | 4,080.00 | 256.00 | 4,096.00 | 260.00 | 4,160.00 | | 0063 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,132 | EACH | 6.85 | 7,754.20 | 6.00 | 6,792.00 | 8.00 | 9,056.00 | | 0064 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 3,014 | LNFT | 2.85 | 8,589.90 | 4.00 | 12,056.00 | 4.00 | 12,056.00 | | 0065 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 386 | LNFT | 12.55 | 4,844.30 | 16.00 | 6,176.00 | 14.00 | 5,404.00 | | 0066 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 712 | LNFT | 1.72 | 1,224.64 | 1.50 | 1,068.00 | 3.00 | 2,136.00 | | 0067 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 1,272 | LNFT | 2.85 | 3,625.20 | 2.25 | 2,862.00 | 4.00 | 5,088.00 | | 0068 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.284 | MILE | 6,010.00 | 31,756.84 | 5,699.00 | 30,113.52 | 6,776.00 | 35,804.38 | | 0069 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.194 | MILE | 2,960.00 | 6,494.24 | 3,989.00 | 8,751.87 | 3,205.00 | 7,031.77 | | 0070 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 342.00 | 1,368.00 | 313.00 | 1,252.00 | 458.00 | 1,832.00 | | 0071 | 732-04-01121 | Plastic Pavement Legends and Symbols (U-Turn) | 4 | EACH | 570.00 | 2,280.00 | 313.00 | 1,252.00 | 690.00 | 2,760.00 | | 0072 | 739-01-00100 | Hydro-Seeding | 3.17 | ACRE | 2,645.00 | 8,384.65 | 2,645.00 | 8,384.65 | 2,713.00 | 8,600.21 | | 0073 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 23,000.00 | 23,000.00 | 11,540.00 | 11,540.00 | | 0074 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 4 | EACH | 12,000.00 | 48,000.00 | 10,828.00 | 43,312.00 | 10,960.00 | 43,840.00 | | 0075 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | 6 | EACH | 2,860.00 | 17,160.00 | 2,849.50 | 17,097.00 | 2,885.00 | 17,310.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,502,128.58 | | 5,996,705.27 | | 8,001,877.12 |
|