Bid Tabulations for the Letting of 5/13/2026 LA DOTD Headquarters

Proposal:H.015846.6
Parish:Orleans
Routes:US 11
Description:US 11: FLOODGATE TO LAKE PONTCHARTRAIN
Type Construction:CLEARING AND GRUBBING, GRADING, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,364,607.57
Rank License BidderConstruction Bid
102179Boh Bros. Construction Co., LLC.$1,952,142.45
206276Barriere Construction Co., LLC$2,174,767.00
373475Madden Gulf Coast, LLC$2,239,832.82
462139Huey P. Stockstill, LLC$2,463,009.62
546747Triumph Construction, LLC$5,428,379.22


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Boh Bros. Construction Co., LLC.
- 2 -
Barriere Construction Co., LLC
- 3 -
Madden Gulf Coast, LLC
- 4 -
Huey P. Stockstill, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00200Clearing and Grubbing (Selective) 0.148 LUMP20,000.0020,000.0017,250.0017,250.0015,000.0015,000.0010,000.0010,000.00
0002202-02-06140Removal of Curbs (Concrete) 146.8   LNFT25.003,670.0035.005,138.0020.002,936.00170.0024,956.00
0003202-02-14500Removal of Guard Rail 1,157     LNFT30.0034,710.0025.5029,503.507.008,099.0027.0031,239.00
0004202-02-38240Removal of Signs and Supports 5     EACH50.00250.00100.00500.0025.00125.0027.00135.00
0005203-01-00100General Excavation 52     CUYD100.005,200.0046.002,392.00265.0013,780.00125.006,500.00
0006203-03-00100Embankment 113     CUYD125.0014,125.00500.0056,500.00290.0032,770.00200.0022,600.00
0007204-06-00100Temporary Silt Fencing 1,000     LNFT5.005,000.003.853,850.003.773,770.004.004,000.00
0008502-01-00100Asphalt Concrete 9,633.7   TON115.001,107,875.50124.001,194,578.80105.001,011,538.50125.001,204,212.50
0009502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 314.3   TON280.0088,004.00285.0089,575.50365.00114,719.50250.0078,575.00
0010509-01-00100Milling Asphalt Pavement 30,042     SQYD3.75112,657.503.65109,653.304.50135,189.003.50105,147.00
0011509-02-00100Contractor Retained Reclaimed Asphalt Pavement -1,628     CUYD0.10-162.8020.00-32,560.000.01-16.280.01-16.28
0012510-01-00200Pavement Patching (12" Minimum Thickness) 4,014     SQYD45.00180,630.0050.00200,700.00107.00429,498.0093.00373,302.00
0013704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 112.6   LNFT30.003,378.0025.502,871.3036.004,053.6027.003,040.20
0014704-07-00200Guard Rail Transitions (Double Thrie Beam) 300     LNFT90.0027,000.0086.0025,800.00125.0037,500.0090.0027,000.00
0015704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 8     EACH3,200.0025,600.003,050.0024,400.003,650.0029,200.003,500.0028,000.00
0016704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 4     EACH3,200.0012,800.003,050.0012,200.003,300.0013,200.003,500.0014,000.00
0017707-01-00100Concrete Curb 108     LNFT120.0012,960.00124.0013,392.00100.0010,800.00100.0010,800.00
0018713-01-00100Temporary Signs and Barricades 1     LUMP70,000.0070,000.00148,000.00148,000.00105,000.00105,000.00137,000.00137,000.00
0019713-02-00500Temporary Pavement Markings (24" Width) 51     LNFT1.0051.001.0051.001.0051.001.0051.00
0020713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 0.883 MILE750.00662.25748.00660.48400.00353.20200.00176.60
0021713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 0.102 MILE750.0076.50750.0076.50750.0076.50800.0081.60
0022713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 8.832 MILE1,000.008,832.001,250.0011,040.001,250.0011,040.001,300.0011,481.60
0023716-01-00100Mulch (Vegetative) 3.2   TON2,000.006,400.002,000.006,400.001,983.166,346.112,200.007,040.00
0024717-01-00100Seeding 364     LB5.001,820.0010.503,822.0010.403,785.6011.004,004.00
0025718-01-00100Fertilizer 12,131     LB0.506,065.501.0012,131.000.9912,009.691.0012,131.00
0026724-02-00100Rumble Strips (Shoulder/Edge) 1.911 MILE500.00955.50305.00582.861,000.001,911.002,000.003,822.00
0027727-01-00100Mobilization 1     LUMP115,000.00115,000.00110,000.00110,000.00102,000.00102,000.00200,000.00200,000.00
0028729-16-00300Object Marker Assembly (Type 3) 12     EACH275.003,300.00255.003,060.0090.001,080.00300.003,600.00
0029729-19-00400Dead End Road Installations (Type D) 1     EACH1,000.001,000.001,800.001,800.00950.00950.001,000.001,000.00
0030731-02-00100Reflectorized Raised Pavement Markers 521     EACH7.003,647.006.103,178.106.003,126.006.503,386.50
0031731-03-00100Removal of Raised Pavement Markers 0.899 MILE500.00449.500.010.01100.0089.90100.0089.90
0032732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 51     LNFT50.002,550.0010.15517.6510.00510.0011.00561.00
0033732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 17.128 MILE2,000.0034,256.004,300.0073,650.404,250.0072,794.004,500.0077,076.00
0034732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 1.81  MILE1,500.002,715.001,275.002,307.751,250.002,262.501,300.002,353.00
0035735-01-00100Mailboxes 167     EACH55.009,185.0051.008,517.0030.005,010.0055.009,185.00
0036735-02-00100Mailbox Supports (Single) 161     EACH160.0025,760.00153.0024,633.00225.0036,225.00160.0025,760.00
0037735-03-00100Mailbox Supports (Double) 3     EACH240.00720.00226.00678.00350.001,050.00240.00720.00
0038740-01-00100Construction Layout 1     LUMP5,000.005,000.007,916.857,916.8512,000.0012,000.0020,000.0020,000.00
             
  CONTRACTOR TOTAL   1,952,142.45 2,174,767.00 2,239,832.82 2,463,009.62



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
Triumph Construction, LLC
Unit PriceTotal
Amount
0001201-01-00200Clearing and Grubbing (Selective) 0.148 LUMP50,400.0050,400.00
0002202-02-06140Removal of Curbs (Concrete) 146.8   LNFT6.00880.80
0003202-02-14500Removal of Guard Rail 1,157     LNFT9.0010,413.00
0004202-02-38240Removal of Signs and Supports 5     EACH30.00150.00
0005203-01-00100General Excavation 52     CUYD81.004,212.00
0006203-03-00100Embankment 113     CUYD121.0013,673.00
0007204-06-00100Temporary Silt Fencing 1,000     LNFT5.005,000.00
0008502-01-00100Asphalt Concrete 9,633.7   TON289.002,784,139.30
0009502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 314.3   TON341.00107,176.30
0010509-01-00100Milling Asphalt Pavement 30,042     SQYD18.00540,756.00
0011509-02-00100Contractor Retained Reclaimed Asphalt Pavement -1,628     CUYD0.01-16.28
0012510-01-00200Pavement Patching (12" Minimum Thickness) 4,014     SQYD225.00903,150.00
0013704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 112.6   LNFT58.006,530.80
0014704-07-00200Guard Rail Transitions (Double Thrie Beam) 300     LNFT151.0045,300.00
0015704-10-00205Guard Rail End Treatment, MASH, (TL-3 Tangent) 8     EACH4,438.0035,504.00
0016704-10-00310Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) 4     EACH4,260.0017,040.00
0017707-01-00100Concrete Curb 108     LNFT27.002,916.00
0018713-01-00100Temporary Signs and Barricades 1     LUMP18,460.0018,460.00
0019713-02-00500Temporary Pavement Markings (24" Width) 51     LNFT18.00918.00
0020713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 0.883 MILE4,621.004,080.34
0021713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 0.102 MILE5,785.00590.07
0022713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 8.832 MILE4,500.0039,744.00
0023716-01-00100Mulch (Vegetative) 3.2   TON2,291.007,331.20
0024717-01-00100Seeding 364     LB13.004,732.00
0025718-01-00100Fertilizer 12,131     LB2.0024,262.00
0026724-02-00100Rumble Strips (Shoulder/Edge) 1.911 MILE2,460.004,701.06
0027727-01-00100Mobilization 1     LUMP574,020.00574,020.00
0028729-16-00300Object Marker Assembly (Type 3) 12     EACH166.001,992.00
0029729-19-00400Dead End Road Installations (Type D) 1     EACH1,100.001,100.00
0030731-02-00100Reflectorized Raised Pavement Markers 521     EACH9.004,689.00
0031731-03-00100Removal of Raised Pavement Markers 0.899 MILE4,000.003,596.00
0032732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 51     LNFT18.00918.00
0033732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 17.128 MILE8,000.00137,024.00
0034732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 1.81  MILE6,923.0012,530.63
0035735-01-00100Mailboxes 167     EACH35.005,845.00
0036735-02-00100Mailbox Supports (Single) 161     EACH260.0041,860.00
0037735-03-00100Mailbox Supports (Double) 3     EACH407.001,221.00
0038740-01-00100Construction Layout 1     LUMP11,540.0011,540.00
       
  CONTRACTOR TOTAL   5,428,379.22