Proposal:H.015823.6
Parish:Iberia
Routes:US 90
Description:US 90: LA 83 - LA 85
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, SUBGRADE TREATMENT, CLASS II BASE COURSE, CEMENT TREATED BASE COURSE, ROADWAY REINFORCING MESH, TEMPORARY DEOUR ROAD, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$29,976,637.79
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $23,115,522.17 |
| 2 | 34356 | Prairie Contractors LLC | $23,535,456.17 |
| 3 | 52306 | SIEMA CONSTRUCTION, LLC | $25,468,824.34 |
| 4 | 39462 | JB JAMES CONSTRUCTION LLC | $27,548,414.35 |
| 5 | 12312 | Gilchrist Construction Company, LLC | $28,305,721.05 |
| 6 | 06276 | Barriere Construction Co., LLC | $29,526,810.22 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - Prairie Contractors LLC | - 3 - SIEMA CONSTRUCTION, LLC | - 4 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 2,226.9 | SQYD | 5.91 | 13,160.98 | 32.00 | 71,260.80 | 15.00 | 33,403.50 | 11.50 | 25,609.35 | | 0002 | 202-02-03030 | Removal of Pavement Structure | 63,235 | SQYD | 8.27 | 522,953.45 | 7.85 | 496,394.75 | 8.00 | 505,880.00 | 25.00 | 1,580,875.00 | | 0003 | 202-02-04560 | Removal of Bridge Joint Preformed Silicone | 1,680 | LNFT | 24.42 | 41,025.60 | 35.00 | 58,800.00 | 5.00 | 8,400.00 | 12.00 | 20,160.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 2,419.4 | LNFT | 8.72 | 21,097.17 | 16.00 | 38,710.40 | 16.75 | 40,524.95 | 12.00 | 29,032.80 | | 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,872 | SQYD | 7.31 | 13,684.32 | 29.00 | 54,288.00 | 18.50 | 34,632.00 | 20.00 | 37,440.00 | | 0006 | 203-01-00100 | General Excavation | 22,621 | CUYD | 11.03 | 249,509.63 | 7.00 | 158,347.00 | 25.00 | 565,525.00 | 45.00 | 1,017,945.00 | | 0007 | 203-03-00100 | Embankment | 2,514 | CUYD | 35.33 | 88,819.62 | 100.00 | 251,400.00 | 93.00 | 233,802.00 | 60.00 | 150,840.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 148 | EACH | 174.23 | 25,786.04 | 115.00 | 17,020.00 | 155.00 | 22,940.00 | 120.00 | 17,760.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 47,764 | LNFT | 2.47 | 117,977.08 | 2.15 | 102,692.60 | 2.00 | 95,528.00 | 4.00 | 191,056.00 | | 0010 | 302-02-04070 | Class II Base Course (4" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 103,956.9 | SQYD | 13.75 | 1,429,407.38 | 10.50 | 1,091,547.45 | 11.00 | 1,143,525.90 | 22.00 | 2,287,051.80 | | 0011 | 302-02-08010 | Class II Base Course (8" Thick) (Soil Cement) | 103,956.9 | SQYD | 19.14 | 1,989,735.07 | 20.50 | 2,131,116.45 | 20.00 | 2,079,138.00 | 22.00 | 2,287,051.80 | | 0012 | 302-03-00100 | Base Drain Outlet | 95 | EACH | 619.87 | 58,887.65 | 833.00 | 79,135.00 | 930.00 | 88,350.00 | 500.00 | 47,500.00 | | 0013 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 103,957 | SQYD | 14.35 | 1,491,782.95 | 11.80 | 1,226,692.60 | 11.50 | 1,195,505.50 | 12.00 | 1,247,484.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 95,720 | TON | 125.00 | 11,965,000.00 | 118.00 | 11,294,960.00 | 132.50 | 12,682,900.00 | 120.98 | 11,580,205.60 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 889.2 | TON | 172.24 | 153,155.81 | 297.00 | 264,092.40 | 182.00 | 161,834.40 | 166.34 | 147,909.53 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 62,735 | SQYD | 2.72 | 170,639.20 | 3.50 | 219,572.50 | 3.00 | 188,205.00 | 2.77 | 173,775.95 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,196 | CUYD | 0.01 | -31.96 | 0.01 | -31.96 | 0.01 | -31.96 | 0.01 | -31.96 | | 0018 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 1,067 | SQYD | 232.27 | 247,832.09 | 219.00 | 233,673.00 | 215.00 | 229,405.00 | 196.59 | 209,761.53 | | 0019 | 510-01-00400 | Pavement Patching (24" Minimum Thickness) | 107 | SQYD | 355.51 | 38,039.57 | 256.00 | 27,392.00 | 386.00 | 41,302.00 | 352.85 | 37,754.95 | | 0020 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 5,876 | INLF | 0.87 | 5,112.12 | 2.25 | 13,221.00 | 1.00 | 5,876.00 | 0.75 | 4,407.00 | | 0021 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 260 | LNFT | 20.15 | 5,239.00 | 15.00 | 3,900.00 | 9.75 | 2,535.00 | 18.00 | 4,680.00 | | 0022 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 2,856 | INLF | 1.16 | 3,312.96 | 3.50 | 9,996.00 | 1.50 | 4,284.00 | 1.00 | 2,856.00 | | 0023 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 39,082 | LNFT | 3.26 | 127,407.32 | 4.25 | 166,098.50 | 4.00 | 156,328.00 | 3.00 | 117,246.00 | | 0024 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 27,916 | LNFT | 3.30 | 92,122.80 | 4.25 | 118,643.00 | 4.00 | 111,664.00 | 3.00 | 83,748.00 | | 0025 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,531.5 | LNFT | 39.49 | 60,478.94 | 42.50 | 65,088.75 | 44.50 | 68,151.75 | 34.00 | 52,071.00 | | 0026 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 250 | LNFT | 135.90 | 33,975.00 | 160.00 | 40,000.00 | 138.00 | 34,500.00 | 120.00 | 30,000.00 | | 0027 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 10 | EACH | 3,687.76 | 36,877.60 | 4,500.00 | 45,000.00 | 3,745.00 | 37,450.00 | 3,200.00 | 32,000.00 | | 0028 | 707-01-00100 | Concrete Curb | 27 | LNFT | 59.81 | 1,614.87 | 400.00 | 10,800.00 | 226.00 | 6,102.00 | 60.00 | 1,620.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 494,662.25 | 494,662.25 | 350,000.00 | 350,000.00 | 500,000.00 | 500,000.00 | 300,000.00 | 300,000.00 | | 0030 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 17,657 | LNFT | 0.17 | 3,001.69 | 0.01 | 176.57 | 0.30 | 5,297.10 | 0.50 | 8,828.50 | | 0031 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 2,676 | LNFT | 0.53 | 1,418.28 | 0.01 | 26.76 | 0.60 | 1,605.60 | 1.00 | 2,676.00 | | 0032 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 26.136 | MILE | 813.05 | 21,249.87 | 650.00 | 16,988.40 | 826.00 | 21,588.34 | 800.00 | 20,908.80 | | 0033 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 26.134 | MILE | 813.05 | 21,248.25 | 700.00 | 18,293.80 | 826.00 | 21,586.68 | 700.00 | 18,293.80 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 80.876 | MILE | 1,045.35 | 84,543.73 | 900.00 | 72,788.40 | 1,239.00 | 100,205.36 | 900.00 | 72,788.40 | | 0035 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 4,588 | EACH | 4.65 | 21,334.20 | 5.00 | 22,940.00 | 7.00 | 32,116.00 | 4.00 | 18,352.00 | | 0036 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 1,947 | EACH | 286.80 | 558,399.60 | 400.00 | 778,800.00 | 247.00 | 480,909.00 | 370.00 | 720,390.00 | | 0037 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 59,085.00 | 118,170.00 | 25,000.00 | 50,000.00 | 18,500.00 | 37,000.00 | 25,000.00 | 50,000.00 | | 0038 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 39,652.60 | 39,652.60 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 | | 0039 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 17.48 | MILE | 1,161.50 | 20,303.02 | 1,200.00 | 20,976.00 | 439.00 | 7,673.72 | 300.00 | 5,244.00 | | 0040 | 725-01-00100 | Temporary Detour Roads | 2,072.3 | SQYD | 185.05 | 383,479.12 | 250.00 | 518,075.00 | 204.75 | 424,303.43 | 240.00 | 497,352.00 | | 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 844,915.50 | 844,915.50 | 1,600,000.00 | 1,600,000.00 | 2,300,000.00 | 2,300,000.00 | 2,720,000.00 | 2,720,000.00 | | 0042 | 729-16-00200 | Object Marker Assembly (Type 2) | 163 | EACH | 75.50 | 12,306.50 | 145.00 | 23,635.00 | 77.00 | 12,551.00 | 65.00 | 10,595.00 | | 0043 | 729-16-00300 | Object Marker Assembly (Type 3) | 23 | EACH | 104.54 | 2,404.42 | 155.00 | 3,565.00 | 106.00 | 2,438.00 | 90.00 | 2,070.00 | | 0044 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 19,762 | EACH | 11.62 | 229,634.44 | 12.00 | 237,144.00 | 12.00 | 237,144.00 | 9.00 | 177,858.00 | | 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 5,403 | EACH | 5.81 | 31,391.43 | 6.00 | 32,418.00 | 7.00 | 37,821.00 | 4.00 | 21,612.00 | | 0046 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 10,338 | LNFT | 4.07 | 42,075.66 | 4.00 | 41,352.00 | 3.25 | 33,598.50 | 4.00 | 41,352.00 | | 0047 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 2,676 | LNFT | 16.26 | 43,511.76 | 16.00 | 42,816.00 | 13.00 | 34,788.00 | 12.00 | 32,112.00 | | 0048 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 27.722 | MILE | 5,226.75 | 144,895.96 | 5,500.00 | 152,471.00 | 6,841.00 | 189,646.20 | 4,500.00 | 124,749.00 | | 0049 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 8.739 | MILE | 1,393.80 | 12,180.42 | 1,500.00 | 13,108.50 | 3,303.00 | 28,864.92 | 1,200.00 | 10,486.80 | | 0050 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 1.33 | MILE | 9,292.00 | 12,358.36 | 10,000.00 | 13,300.00 | 14,154.00 | 18,824.82 | 8,200.00 | 10,906.00 | | 0051 | 732-03-02102 | Plastic Pav't Striping (Broken) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black and White Contrast) | 5.121 | MILE | 4,878.30 | 24,981.77 | 5,250.00 | 26,885.25 | 10,614.00 | 54,354.29 | 4,200.00 | 21,508.20 | | 0052 | 732-05-00100 | Removal of Existing Markings | 10.087 | MILE | 6,969.00 | 70,296.30 | 7,250.00 | 73,130.75 | 10,020.00 | 101,071.74 | 6,000.00 | 60,522.00 | | 0053 | 739-01-00100 | Hydro-Seeding | 5.32 | ACRE | 3,252.20 | 17,301.70 | 3,500.00 | 18,620.00 | 3,130.00 | 16,651.60 | 2,700.00 | 14,364.00 | | 0054 | 740-01-00100 | Construction Layout | 1 | LUMP | 172,624.35 | 172,624.35 | 200,000.00 | 200,000.00 | 92,642.00 | 92,642.00 | 285,000.00 | 285,000.00 | | 0055 | 815-03-00200 | Joint Seal (Preformed Silicone) | 1,680 | LNFT | 24.42 | 41,025.60 | 150.00 | 252,000.00 | 111.00 | 186,480.00 | 80.00 | 134,400.00 | | 0056 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 72,867 | SQYD | 8.39 | 611,354.13 | 6.50 | 473,635.50 | 9.00 | 655,803.00 | 9.50 | 692,236.50 | | 0057 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 13 | EACH | 2,323.00 | 30,199.00 | 12,500.00 | 162,500.00 | 2,400.00 | 31,200.00 | 2,000.00 | 26,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 23,115,522.17 | | 23,535,456.17 | | 25,468,824.34 | | 27,548,414.35 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Gilchrist Construction Company, LLC | - 6 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 2,226.9 | SQYD | 16.00 | 35,630.40 | 9.75 | 21,712.28 | | 0002 | 202-02-03030 | Removal of Pavement Structure | 63,235 | SQYD | 16.00 | 1,011,760.00 | 11.00 | 695,585.00 | | 0003 | 202-02-04560 | Removal of Bridge Joint Preformed Silicone | 1,680 | LNFT | 31.00 | 52,080.00 | 37.00 | 62,160.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 2,419.4 | LNFT | 8.00 | 19,355.20 | 9.00 | 21,774.60 | | 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,872 | SQYD | 13.00 | 24,336.00 | 10.00 | 18,720.00 | | 0006 | 203-01-00100 | General Excavation | 22,621 | CUYD | 14.00 | 316,694.00 | 5.00 | 113,105.00 | | 0007 | 203-03-00100 | Embankment | 2,514 | CUYD | 37.00 | 93,018.00 | 45.75 | 115,015.50 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 148 | EACH | 150.00 | 22,200.00 | 153.00 | 22,644.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 47,764 | LNFT | 2.00 | 95,528.00 | 2.50 | 119,410.00 | | 0010 | 302-02-04070 | Class II Base Course (4" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 103,956.9 | SQYD | 11.00 | 1,143,525.90 | 7.50 | 779,676.75 | | 0011 | 302-02-08010 | Class II Base Course (8" Thick) (Soil Cement) | 103,956.9 | SQYD | 26.00 | 2,702,879.40 | 21.75 | 2,261,062.58 | | 0012 | 302-03-00100 | Base Drain Outlet | 95 | EACH | 800.00 | 76,000.00 | 1,135.00 | 107,825.00 | | 0013 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 103,957 | SQYD | 19.00 | 1,975,183.00 | 10.25 | 1,065,559.25 | | 0014 | 502-01-00100 | Asphalt Concrete | 95,720 | TON | 140.00 | 13,400,800.00 | 153.50 | 14,693,020.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 889.2 | TON | 325.00 | 288,990.00 | 213.00 | 189,399.60 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 62,735 | SQYD | 5.50 | 345,042.50 | 6.00 | 376,410.00 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,196 | CUYD | 1.00 | -3,196.00 | 0.01 | -31.96 | | 0018 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 1,067 | SQYD | 300.00 | 320,100.00 | 237.00 | 252,879.00 | | 0019 | 510-01-00400 | Pavement Patching (24" Minimum Thickness) | 107 | SQYD | 350.00 | 37,450.00 | 418.00 | 44,726.00 | | 0020 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 5,876 | INLF | 4.00 | 23,504.00 | 0.85 | 4,994.60 | | 0021 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 260 | LNFT | 30.00 | 7,800.00 | 2.70 | 702.00 | | 0022 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 2,856 | INLF | 2.00 | 5,712.00 | 2.70 | 7,711.20 | | 0023 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 39,082 | LNFT | 4.00 | 156,328.00 | 2.75 | 107,475.50 | | 0024 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 27,916 | LNFT | 4.00 | 111,664.00 | 2.75 | 76,769.00 | | 0025 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,531.5 | LNFT | 34.00 | 52,071.00 | 40.50 | 62,025.75 | | 0026 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 250 | LNFT | 117.00 | 29,250.00 | 139.75 | 34,937.50 | | 0027 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 10 | EACH | 3,200.00 | 32,000.00 | 3,800.00 | 38,000.00 | | 0028 | 707-01-00100 | Concrete Curb | 27 | LNFT | 360.00 | 9,720.00 | 600.00 | 16,200.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 225,000.00 | 225,000.00 | 1,475,000.00 | 1,475,000.00 | | 0030 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 17,657 | LNFT | 0.25 | 4,414.25 | 0.15 | 2,648.55 | | 0031 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 2,676 | LNFT | 0.50 | 1,338.00 | 0.55 | 1,471.80 | | 0032 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 26.136 | MILE | 250.00 | 6,534.00 | 290.00 | 7,579.44 | | 0033 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 26.134 | MILE | 700.00 | 18,293.80 | 850.00 | 22,213.90 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 80.876 | MILE | 1,050.00 | 84,919.80 | 1,100.00 | 88,963.60 | | 0035 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 4,588 | EACH | 6.00 | 27,528.00 | 4.85 | 22,251.80 | | 0036 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 1,947 | EACH | 550.00 | 1,070,850.00 | 405.00 | 788,535.00 | | 0037 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 27,000.00 | 54,000.00 | 30,500.00 | 61,000.00 | | 0038 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 35,000.00 | 35,000.00 | 89,500.00 | 89,500.00 | | 0039 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 17.48 | MILE | 1,100.00 | 19,228.00 | 1,450.00 | 25,346.00 | | 0040 | 725-01-00100 | Temporary Detour Roads | 2,072.3 | SQYD | 265.00 | 549,159.50 | 175.00 | 362,652.50 | | 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 2,000,000.00 | 2,000,000.00 | 3,650,000.00 | 3,650,000.00 | | 0042 | 729-16-00200 | Object Marker Assembly (Type 2) | 163 | EACH | 65.00 | 10,595.00 | 75.00 | 12,225.00 | | 0043 | 729-16-00300 | Object Marker Assembly (Type 3) | 23 | EACH | 90.00 | 2,070.00 | 107.50 | 2,472.50 | | 0044 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 19,762 | EACH | 10.00 | 197,620.00 | 12.00 | 237,144.00 | | 0045 | 731-02-00100 | Reflectorized Raised Pavement Markers | 5,403 | EACH | 6.00 | 32,418.00 | 5.00 | 27,015.00 | | 0046 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 10,338 | LNFT | 3.00 | 31,014.00 | 4.25 | 43,936.50 | | 0047 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 2,676 | LNFT | 11.00 | 29,436.00 | 17.00 | 45,492.00 | | 0048 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 27.722 | MILE | 5,800.00 | 160,787.60 | 5,450.00 | 151,084.90 | | 0049 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 8.739 | MILE | 2,800.00 | 24,469.20 | 1,450.00 | 12,671.55 | | 0050 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 1.33 | MILE | 12,000.00 | 15,960.00 | 9,700.00 | 12,901.00 | | 0051 | 732-03-02102 | Plastic Pav't Striping (Broken) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black and White Contrast) | 5.121 | MILE | 9,000.00 | 46,089.00 | 5,100.00 | 26,117.10 | | 0052 | 732-05-00100 | Removal of Existing Markings | 10.087 | MILE | 8,500.00 | 85,739.50 | 7,275.00 | 73,382.93 | | 0053 | 739-01-00100 | Hydro-Seeding | 5.32 | ACRE | 2,800.00 | 14,896.00 | 3,175.00 | 16,891.00 | | 0054 | 740-01-00100 | Construction Layout | 1 | LUMP | 250,000.00 | 250,000.00 | 94,100.00 | 94,100.00 | | 0055 | 815-03-00200 | Joint Seal (Preformed Silicone) | 1,680 | LNFT | 125.00 | 210,000.00 | 149.25 | 250,740.00 | | 0056 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 72,867 | SQYD | 8.00 | 582,936.00 | 8.00 | 582,936.00 | | 0057 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 13 | EACH | 10,000.00 | 130,000.00 | 2,390.00 | 31,070.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 28,305,721.05 | | 29,526,810.22 |
|