Proposal:H.015445.6
Parish:Winn
Description:HARRISONBURG ROAD OVER NANTACHES CREEK
Type Construction:CLEARING AND GRUBBING, REMOVAL OF CONCRETE BRIDGE, GRADING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$1,273,147.40
| Rank | License | Bidder | Construction Bid |
| 1 | 56994 | Matt L. Guinn Construction, LLC | $1,069,151.60 |
| 2 | 00044 | Guinn Construction, LLC | $1,296,348.00 |
| 3 | 27239 | Apeck Construction, LLC | $1,311,630.54 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $1,316,598.60 |
| 5 | 01516 | Elevate Heavy Civil Construction, LLC | $1,347,753.52 |
| 6 | 49239 | WL Bass Construction Inc. | $1,487,258.20 |
| 7 | 39462 | JB JAMES CONSTRUCTION LLC | $1,496,334.60 |
| 8 | 12312 | Gilchrist Construction Company, LLC | $1,666,285.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Matt L. Guinn Construction, LLC | - 2 - Guinn Construction, LLC | - 3 - Apeck Construction, LLC | - 4 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing (est. 0.43 Acres) | 1 | LUMP | 32,500.00 | 32,500.00 | 40,000.00 | 40,000.00 | 190,947.56 | 190,947.56 | 35,000.00 | 35,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 4,124.36 | 4,124.36 | 18,500.00 | 18,500.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 546.9 | SQYD | 10.00 | 5,469.00 | 15.00 | 8,203.50 | 16.38 | 8,958.22 | 17.00 | 9,297.30 | | 0004 | 202-02-04501 | Removal of Bridge (STA. 106+46.76; 27' x 95' Concrete Precast Slab Span) | 2,565 | LUMP | 40,000.00 | 40,000.00 | 40,000.00 | 40,000.00 | 20,224.86 | 20,224.86 | 30,000.00 | 30,000.00 | | 0005 | 203-02-00100 | Drainage Excavation | 336 | CUYD | 25.00 | 8,400.00 | 35.00 | 11,760.00 | 41.97 | 14,101.92 | 50.00 | 16,800.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 8,100.00 | 8,100.00 | 25,000.00 | 25,000.00 | 26,595.12 | 26,595.12 | 22,000.00 | 22,000.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 400.00 | 2,000.00 | 250.00 | 1,250.00 | 597.28 | 2,986.40 | 500.00 | 2,500.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 608 | LNFT | 3.00 | 1,824.00 | 3.00 | 1,824.00 | 5.97 | 3,629.76 | 5.00 | 3,040.00 | | 0009 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 630.6 | SQYD | 46.00 | 29,007.60 | 75.00 | 47,295.00 | 75.04 | 47,320.22 | 55.00 | 34,683.00 | | 0010 | 302-03-00100 | Base Drain Outlet | 4 | EACH | 1,000.00 | 4,000.00 | 1,500.00 | 6,000.00 | 2,447.28 | 9,789.12 | 1,600.00 | 6,400.00 | | 0011 | 304-01-00100 | Lime | 4.45 | TON | 400.00 | 1,780.00 | 1,000.00 | 4,450.00 | 477.83 | 2,126.34 | 850.00 | 3,782.50 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 314 | SQYD | 10.00 | 3,140.00 | 25.00 | 7,850.00 | 1.19 | 373.66 | 35.00 | 10,990.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 136.7 | TON | 300.00 | 41,010.00 | 500.00 | 68,350.00 | 338.35 | 46,252.45 | 420.00 | 57,414.00 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 33 | TON | 410.00 | 13,530.00 | 600.00 | 19,800.00 | 401.67 | 13,255.11 | 600.00 | 19,800.00 | | 0015 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 71 | INLF | 4.00 | 284.00 | 35.00 | 2,485.00 | 30.77 | 2,184.67 | 14.00 | 994.00 | | 0016 | 701-05-01069 | Side Drain Pipe (24" RCP/RPVCP) | 66 | LNFT | 120.00 | 7,920.00 | 250.00 | 16,500.00 | 93.25 | 6,154.50 | 135.00 | 8,910.00 | | 0017 | 701-05-02065 | Side Drain Pipe (Erosion) (24" RPVCP) | 62 | LNFT | 90.00 | 5,580.00 | 250.00 | 15,500.00 | 99.26 | 6,154.12 | 140.00 | 8,680.00 | | 0018 | 701-05-02067 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CPPPDW) | 60 | LNFT | 90.00 | 5,400.00 | 250.00 | 15,000.00 | 102.57 | 6,154.20 | 145.00 | 8,700.00 | | 0019 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 8,000.00 | 8,000.00 | 7,500.00 | 7,500.00 | 7,754.99 | 7,754.99 | 15,000.00 | 15,000.00 | | 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 25 | LNFT | 45.00 | 1,125.00 | 45.00 | 1,125.00 | 41.81 | 1,045.25 | 35.00 | 875.00 | | 0021 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 140.00 | 14,000.00 | 155.00 | 15,500.00 | 161.27 | 16,127.00 | 135.00 | 13,500.00 | | 0022 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 2 | EACH | 4,250.00 | 8,500.00 | 4,500.00 | 9,000.00 | 4,479.63 | 8,959.26 | 3,750.00 | 7,500.00 | | 0023 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 5,000.00 | 10,000.00 | 6,000.00 | 12,000.00 | 4,957.46 | 9,914.92 | 4,150.00 | 8,300.00 | | 0024 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 750.00 | 7,500.00 | 800.00 | 8,000.00 | 716.74 | 7,167.40 | 600.00 | 6,000.00 | | 0025 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 225.00 | 2,250.00 | 400.00 | 4,000.00 | 238.91 | 2,389.10 | 200.00 | 2,000.00 | | 0026 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 458 | SQYD | 125.00 | 57,250.00 | 135.00 | 61,830.00 | 97.05 | 44,448.90 | 115.00 | 52,670.00 | | 0027 | 711-04-00100 | Geotextile Fabric | 458 | SQYD | 5.00 | 2,290.00 | 5.00 | 2,290.00 | 5.56 | 2,546.48 | 1.00 | 458.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 32,500.00 | 32,500.00 | 36,255.13 | 36,255.13 | 65,000.00 | 65,000.00 | | 0029 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 253 | SQYD | 6.00 | 1,518.00 | 5.00 | 1,265.00 | 5.97 | 1,510.41 | 5.00 | 1,265.00 | | 0030 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 17,000.00 | 17,000.00 | 25,000.00 | 25,000.00 | 41,511.22 | 41,511.22 | 12,000.00 | 12,000.00 | | 0031 | 726-01-00100 | Bedding Material | 0.4 | CUYD | 400.00 | 160.00 | 1,000.00 | 400.00 | 179.18 | 71.67 | 1,900.00 | 760.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 90,000.00 | 90,000.00 | 135,000.00 | 135,000.00 | 42,444.89 | 42,444.89 | 130,000.00 | 130,000.00 | | 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 145.00 | 580.00 | 150.00 | 600.00 | 161.27 | 645.08 | 135.00 | 540.00 | | 0034 | 739-01-00100 | Hydro-Seeding | 0.35 | ACRE | 10,000.00 | 3,500.00 | 10,000.00 | 3,500.00 | 10,751.11 | 3,762.89 | 9,000.00 | 3,150.00 | | 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 17,500.00 | 17,500.00 | 25,000.00 | 25,000.00 | 6,834.37 | 6,834.37 | 45,000.00 | 45,000.00 | | 0036 | 804-01-00300 | Precast Concrete Piles (16") | 1,008 | LNFT | 150.00 | 151,200.00 | 165.00 | 166,320.00 | 72.63 | 73,211.04 | 220.00 | 221,760.00 | | 0037 | 805-01-00100 | Class A1 Concrete (Slab Span) | 110.4 | CUYD | 1,750.00 | 193,200.00 | 1,750.00 | 193,200.00 | 2,577.87 | 284,596.85 | 1,700.00 | 187,680.00 | | 0038 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 28.1 | CUYD | 2,400.00 | 67,440.00 | 2,750.00 | 77,275.00 | 4,455.98 | 125,213.04 | 3,300.00 | 92,730.00 | | 0039 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,195 | SQFT | 3.00 | 3,585.00 | 3.00 | 3,585.00 | 6.12 | 7,313.40 | 3.00 | 3,585.00 | | 0040 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,195 | SQFT | 3.00 | 3,585.00 | 3.00 | 3,585.00 | 6.12 | 7,313.40 | 3.50 | 4,182.50 | | 0041 | 806-01-00100 | Deformed Reinforcing Steel | 29,466 | LB | 2.00 | 58,932.00 | 1.75 | 51,565.50 | 1.53 | 45,082.98 | 1.55 | 45,672.30 | | 0042 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 275.00 | 22,000.00 | 300.00 | 24,000.00 | 250.97 | 20,077.60 | 175.00 | 14,000.00 | | 0043 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 120 | LNFT | 275.00 | 33,000.00 | 300.00 | 36,000.00 | 243.76 | 29,251.20 | 200.00 | 24,000.00 | | 0044 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 500 | SQFT | 95.00 | 47,500.00 | 110.00 | 55,000.00 | 145.33 | 72,665.00 | 110.00 | 55,000.00 | | 0045 | 815-03-00300 | Joint Seal (Poured) | 144 | LNFT | 18.00 | 2,592.00 | 35.00 | 5,040.00 | 15.17 | 2,184.48 | 45.00 | 6,480.00 | | | | SUBTOTAL ADDITIVE SECTION 1 | | | | 1,069,151.60 | | 1,296,348.00 | | 1,311,630.54 | | 1,316,598.60 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,069,151.60 | | 1,296,348.00 | | 1,311,630.54 | | 1,316,598.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Elevate Heavy Civil Construction, LLC | - 6 - WL Bass Construction Inc. | - 7 - JB JAMES CONSTRUCTION LLC | - 8 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing (est. 0.43 Acres) | 1 | LUMP | 100,000.00 | 100,000.00 | 75,000.00 | 75,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 3,000.00 | 3,000.00 | 13,000.00 | 13,000.00 | 15,000.00 | 15,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 546.9 | SQYD | 21.30 | 11,648.97 | 5.00 | 2,734.50 | 12.00 | 6,562.80 | 20.00 | 10,938.00 | | 0004 | 202-02-04501 | Removal of Bridge (STA. 106+46.76; 27' x 95' Concrete Precast Slab Span) | 2,565 | LUMP | 50,000.00 | 50,000.00 | 60,000.00 | 60,000.00 | 150,000.00 | 150,000.00 | 52,000.00 | 52,000.00 | | 0005 | 203-02-00100 | Drainage Excavation | 336 | CUYD | 20.00 | 6,720.00 | 22.00 | 7,392.00 | 45.00 | 15,120.00 | 44.00 | 14,784.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 27,550.00 | 27,550.00 | 150,000.00 | 150,000.00 | 30,000.00 | 30,000.00 | 100,000.00 | 100,000.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 5 | EACH | 124.00 | 620.00 | 250.00 | 1,250.00 | 125.00 | 625.00 | 130.00 | 650.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 608 | LNFT | 6.00 | 3,648.00 | 5.00 | 3,040.00 | 9.00 | 5,472.00 | 6.00 | 3,648.00 | | 0009 | 302-02-08570 | Class II Base Course (8-1/2" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 630.6 | SQYD | 77.00 | 48,556.20 | 63.00 | 39,727.80 | 48.00 | 30,268.80 | 60.00 | 37,836.00 | | 0010 | 302-03-00100 | Base Drain Outlet | 4 | EACH | 950.00 | 3,800.00 | 2,400.00 | 9,600.00 | 1,000.00 | 4,000.00 | 2,000.00 | 8,000.00 | | 0011 | 304-01-00100 | Lime | 4.45 | TON | 343.00 | 1,526.35 | 380.00 | 1,691.00 | 500.00 | 2,225.00 | 625.00 | 2,781.25 | | 0012 | 304-05-00100 | Lime Treatment (Type E) | 314 | SQYD | 10.00 | 3,140.00 | 8.00 | 2,512.00 | 10.00 | 3,140.00 | 30.00 | 9,420.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 136.7 | TON | 400.00 | 54,680.00 | 400.00 | 54,680.00 | 400.00 | 54,680.00 | 300.00 | 41,010.00 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 33 | TON | 500.00 | 16,500.00 | 500.00 | 16,500.00 | 500.00 | 16,500.00 | 300.00 | 9,900.00 | | 0015 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 71 | INLF | 3.00 | 213.00 | 2.00 | 142.00 | 20.00 | 1,420.00 | 45.00 | 3,195.00 | | 0016 | 701-05-01069 | Side Drain Pipe (24" RCP/RPVCP) | 66 | LNFT | 130.00 | 8,580.00 | 150.00 | 9,900.00 | 250.00 | 16,500.00 | 140.00 | 9,240.00 | | 0017 | 701-05-02065 | Side Drain Pipe (Erosion) (24" RPVCP) | 62 | LNFT | 140.00 | 8,680.00 | 140.00 | 8,680.00 | 250.00 | 15,500.00 | 150.00 | 9,300.00 | | 0018 | 701-05-02067 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CPPPDW) | 60 | LNFT | 141.00 | 8,460.00 | 130.00 | 7,800.00 | 250.00 | 15,000.00 | 155.00 | 9,300.00 | | 0019 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 9,900.00 | 9,900.00 | 10,000.00 | 10,000.00 | 9,000.00 | 9,000.00 | 12,000.00 | 12,000.00 | | 0020 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 25 | LNFT | 34.00 | 850.00 | 25.00 | 625.00 | 60.00 | 1,500.00 | 25.00 | 625.00 | | 0021 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 120.00 | 12,000.00 | 100.00 | 10,000.00 | 150.00 | 15,000.00 | 100.00 | 10,000.00 | | 0022 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 2 | EACH | 3,500.00 | 7,000.00 | 3,000.00 | 6,000.00 | 3,500.00 | 7,000.00 | 3,000.00 | 6,000.00 | | 0023 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 3,100.00 | 6,200.00 | 3,000.00 | 6,000.00 | 3,500.00 | 7,000.00 | 3,000.00 | 6,000.00 | | 0024 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 600.00 | 6,000.00 | 600.00 | 6,000.00 | 600.00 | 6,000.00 | 600.00 | 6,000.00 | | 0025 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 200.00 | 2,000.00 | 200.00 | 2,000.00 | 200.00 | 2,000.00 | 200.00 | 2,000.00 | | 0026 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 458 | SQYD | 75.00 | 34,350.00 | 120.00 | 54,960.00 | 140.00 | 64,120.00 | 125.00 | 57,250.00 | | 0027 | 711-04-00100 | Geotextile Fabric | 458 | SQYD | 5.00 | 2,290.00 | 5.00 | 2,290.00 | 3.00 | 1,374.00 | 10.00 | 4,580.00 | | 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 32,000.00 | 32,000.00 | 98,200.00 | 98,200.00 | 40,000.00 | 40,000.00 | 75,000.00 | 75,000.00 | | 0029 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 253 | SQYD | 2.00 | 506.00 | 3.00 | 759.00 | 2.00 | 506.00 | 2.00 | 506.00 | | 0030 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 12,000.00 | 12,000.00 | 7,000.00 | 7,000.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | | 0031 | 726-01-00100 | Bedding Material | 0.4 | CUYD | 3,600.00 | 1,440.00 | 1,100.00 | 440.00 | 1,000.00 | 400.00 | 150.00 | 60.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 134,717.00 | 134,717.00 | 148,700.00 | 148,700.00 | 140,000.00 | 140,000.00 | 160,000.00 | 160,000.00 | | 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.00 | 340.00 | 100.00 | 400.00 | 95.00 | 380.00 | 100.00 | 400.00 | | 0034 | 739-01-00100 | Hydro-Seeding | 0.35 | ACRE | 8,300.00 | 2,905.00 | 6,000.00 | 2,100.00 | 8,300.00 | 2,905.00 | 10,000.00 | 3,500.00 | | 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 19,000.00 | 19,000.00 | 75,300.00 | 75,300.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0036 | 804-01-00300 | Precast Concrete Piles (16") | 1,008 | LNFT | 211.00 | 212,688.00 | 247.00 | 248,976.00 | 280.00 | 282,240.00 | 240.00 | 241,920.00 | | 0037 | 805-01-00100 | Class A1 Concrete (Slab Span) | 110.4 | CUYD | 1,750.00 | 193,200.00 | 350.00 | 38,640.00 | 1,400.00 | 154,560.00 | 2,000.00 | 220,800.00 | | 0038 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 28.1 | CUYD | 3,800.00 | 106,780.00 | 350.00 | 9,835.00 | 3,000.00 | 84,300.00 | 4,000.00 | 112,400.00 | | 0039 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,195 | SQFT | 3.00 | 3,585.00 | 2.00 | 2,390.00 | 1.20 | 1,434.00 | 5.00 | 5,975.00 | | 0040 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,195 | SQFT | 4.00 | 4,780.00 | 2.00 | 2,390.00 | 2.00 | 2,390.00 | 5.00 | 5,975.00 | | 0041 | 806-01-00100 | Deformed Reinforcing Steel | 29,466 | LB | 2.00 | 58,932.00 | 4.15 | 122,283.90 | 2.00 | 58,932.00 | 2.00 | 58,932.00 | | 0042 | 810-01-00100 | Concrete Bridge Railing (Standard) | 80 | LNFT | 315.00 | 25,200.00 | 400.00 | 32,000.00 | 200.00 | 16,000.00 | 400.00 | 32,000.00 | | 0043 | 810-01-00200 | Concrete Bridge Railing (Slotted) | 120 | LNFT | 305.00 | 36,600.00 | 350.00 | 42,000.00 | 220.00 | 26,400.00 | 400.00 | 48,000.00 | | 0044 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 500 | SQFT | 110.00 | 55,000.00 | 200.00 | 100,000.00 | 100.00 | 50,000.00 | 200.00 | 100,000.00 | | 0045 | 815-03-00300 | Joint Seal (Poured) | 144 | LNFT | 22.00 | 3,168.00 | 30.00 | 4,320.00 | 20.00 | 2,880.00 | 65.00 | 9,360.00 | | | | SUBTOTAL ADDITIVE SECTION 1 | | | | 1,347,753.52 | | 1,487,258.20 | | 1,496,334.60 | | 1,666,285.25 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,347,753.52 | | 1,487,258.20 | | 1,496,334.60 | | 1,666,285.25 |
|