Proposal:H.014246.6
Parish:Rapides
Routes:LA 1199
Description:LA 1199: SPRING CREEK & CREEK BRIDGES
Type Construction:CLEARING AND GRUBBING, GRADING, REMOVAL OF PRECAST BRIDGES, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGES, AND RELATED WORK.
Estimated Construction Cost:$6,725,091.46
| Rank | License | Bidder | Construction Bid |
| 1 | 01516 | Elevate Heavy Civil Construction, LLC | $4,942,259.90 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $4,970,259.20 |
| 3 | 55505 | MERRICK, LLC | $5,049,092.50 |
| 4 | 27239 | Apeck Construction, LLC | $5,183,042.03 |
| 5 | 00044 | Guinn Construction, LLC | $5,334,192.00 |
| 6 | 12312 | Gilchrist Construction Company, LLC | $5,494,893.11 |
| 7 | 39613 | Baker Pile Driving and Site Work, LLC | $5,499,401.79 |
| 8 | 39462 | JB JAMES CONSTRUCTION LLC | $5,648,101.00 |
| 9 | 56994 | Matt L. Guinn Construction, LLC | $5,799,668.40 |
| 10 | 49239 | WL Bass Construction Inc. | $5,931,849.55 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elevate Heavy Civil Construction, LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - MERRICK, LLC | - 4 - Apeck Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.44 | LUMP | 100,000.00 | 100,000.00 | 120,000.00 | 120,000.00 | 85,000.00 | 85,000.00 | 744,748.30 | 744,748.30 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 35,000.00 | 35,000.00 | 20,000.00 | 20,000.00 | 8,232.25 | 8,232.25 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 3,699 | SQYD | 10.00 | 36,990.00 | 7.00 | 25,893.00 | 9.00 | 33,291.00 | 14.51 | 53,672.49 | | 0004 | 202-02-04501 | Removal of Bridge Bridge Str. No. 084008402700611 (60' x 28' Precast Bridge with Timber Piles) | 1,680 | LUMP | 50,000.00 | 50,000.00 | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | 20,184.56 | 20,184.56 | | 0005 | 202-02-04501 | Removal of Bridge Bridge Str. No. 084008402701801 (40' x 28' Precast Bridge with Timber Piles) | 1,120 | LUMP | 50,000.00 | 50,000.00 | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | 20,184.56 | 20,184.56 | | 0006 | 202-02-04501 | Removal of Bridge Bridge Str. No. 084008402702861 (80' x 28' Precast Bridge with Timber Piles) | 2,240 | LUMP | 50,000.00 | 50,000.00 | 45,000.00 | 45,000.00 | 75,000.00 | 75,000.00 | 30,276.86 | 30,276.86 | | 0007 | 202-02-12000 | Removal of Fence | 312 | LNFT | 2.00 | 624.00 | 25.00 | 7,800.00 | 7.00 | 2,184.00 | 11.70 | 3,650.40 | | 0008 | 202-02-14500 | Removal of Guard Rail | 859.7 | LNFT | 8.00 | 6,877.60 | 25.00 | 21,492.50 | 10.00 | 8,597.00 | 12.73 | 10,943.98 | | 0009 | 202-03-38000 | Relocation of Sign | 1 | EACH | 150.00 | 150.00 | 6,000.00 | 6,000.00 | 600.00 | 600.00 | 178.83 | 178.83 | | 0010 | 203-02-00100 | Drainage Excavation | 4,315 | CUYD | 10.00 | 43,150.00 | 18.00 | 77,670.00 | 20.00 | 86,300.00 | 21.77 | 93,937.55 | | 0011 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 138,000.00 | 138,000.00 | 90,000.00 | 90,000.00 | 200,000.00 | 200,000.00 | 128,316.04 | 128,316.04 | | 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 24 | EACH | 150.00 | 3,600.00 | 250.00 | 6,000.00 | 185.00 | 4,440.00 | 298.05 | 7,153.20 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 1,535 | LNFT | 3.00 | 4,605.00 | 3.50 | 5,372.50 | 3.50 | 5,372.50 | 5.96 | 9,148.60 | | 0014 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 5,315.8 | SQYD | 45.00 | 239,211.00 | 25.00 | 132,895.00 | 45.00 | 239,211.00 | 48.24 | 256,434.19 | | 0015 | 304-01-00100 | Lime | 18.85 | TON | 350.00 | 6,597.50 | 505.00 | 9,519.25 | 350.00 | 6,597.50 | 476.87 | 8,989.00 | | 0016 | 304-05-00100 | Lime Treatment (Type E) | 1,330 | SQYD | 10.00 | 13,300.00 | 8.00 | 10,640.00 | 3.00 | 3,990.00 | 1.19 | 1,582.70 | | 0017 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 45 | CUYD | 160.00 | 7,200.00 | 65.00 | 2,925.00 | 150.00 | 6,750.00 | 132.47 | 5,961.15 | | 0018 | 502-01-00100 | Asphalt Concrete | 1,175.3 | TON | 235.00 | 276,195.50 | 275.00 | 323,207.50 | 250.00 | 293,825.00 | 236.93 | 278,463.83 | | 0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 225.3 | TON | 280.00 | 63,084.00 | 315.00 | 70,969.50 | 300.00 | 67,590.00 | 240.52 | 54,189.16 | | 0020 | 510-01-00001 | Pavement Patching (14.5 inch minimum thickness) | 276 | SQYD | 200.00 | 55,200.00 | 206.00 | 56,856.00 | 225.00 | 62,100.00 | 239.08 | 65,986.08 | | 0021 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 470 | INLF | 2.00 | 940.00 | 4.00 | 1,880.00 | 3.00 | 1,410.00 | 4.64 | 2,180.80 | | 0022 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 648 | LNFT | 12.00 | 7,776.00 | 15.00 | 9,720.00 | 9.00 | 5,832.00 | 12.69 | 8,223.12 | | 0023 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 1,080 | LNFT | 3.00 | 3,240.00 | 15.00 | 16,200.00 | 2.00 | 2,160.00 | 8.07 | 8,715.60 | | 0024 | 701-05-02062 | Side Drain Pipe (Erosion) (24" RPVCP/CMP) | 111 | LNFT | 70.00 | 7,770.00 | 100.00 | 11,100.00 | 125.00 | 13,875.00 | 107.83 | 11,969.13 | | 0025 | 701-05-02066 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CPPPDW/CMP) | 133 | LNFT | 70.00 | 9,310.00 | 95.00 | 12,635.00 | 125.00 | 16,625.00 | 95.32 | 12,677.56 | | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 466 | LNFT | 10.00 | 4,660.00 | 10.00 | 4,660.00 | 8.00 | 3,728.00 | 5.96 | 2,777.36 | | 0027 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 6,000.00 | 6,000.00 | 11,000.00 | 11,000.00 | 7,000.00 | 7,000.00 | 7,203.05 | 7,203.05 | | 0028 | 704-03-00100 | Blocked Out Guard rail | 31.3 | LNFT | 34.00 | 1,064.20 | 45.00 | 1,408.50 | 30.00 | 939.00 | 53.65 | 1,679.25 | | 0029 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 606.3 | LNFT | 34.00 | 20,614.20 | 35.00 | 21,220.50 | 30.00 | 18,189.00 | 41.73 | 25,300.90 | | 0030 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 160.00 | 1,008.00 | 140.00 | 882.00 | 125.00 | 787.50 | 166.91 | 1,051.53 | | 0031 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 116.00 | 34,800.00 | 135.00 | 40,500.00 | 125.00 | 37,500.00 | 160.95 | 48,285.00 | | 0032 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 11 | EACH | 3,350.00 | 36,850.00 | 4,150.00 | 45,650.00 | 3,500.00 | 38,500.00 | 4,947.58 | 54,423.38 | | 0033 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 378 | LNFT | 16.00 | 6,048.00 | 18.00 | 6,804.00 | 20.00 | 7,560.00 | 21.46 | 8,111.88 | | 0034 | 708-01-00100 | Right-of-Way Monument | 34 | EACH | 600.00 | 20,400.00 | 600.00 | 20,400.00 | 600.00 | 20,400.00 | 715.31 | 24,320.54 | | 0035 | 708-02-00100 | Right-of-Way Monument Witness Post | 34 | EACH | 200.00 | 6,800.00 | 200.00 | 6,800.00 | 200.00 | 6,800.00 | 238.44 | 8,106.96 | | 0036 | 711-03-00400 | Riprap (55 lb) | 2,836 | TON | 72.00 | 204,192.00 | 95.00 | 269,420.00 | 90.00 | 255,240.00 | 81.81 | 232,013.16 | | 0037 | 711-04-00100 | Geotextile Fabric | 3,500 | SQYD | 3.00 | 10,500.00 | 1.00 | 3,500.00 | 3.00 | 10,500.00 | 3.06 | 10,710.00 | | 0038 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 46,000.00 | 46,000.00 | 135,000.00 | 135,000.00 | 100,000.00 | 100,000.00 | 65,689.51 | 65,689.51 | | 0039 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 0.156 | MILE | 28,200.00 | 4,399.20 | 1,000.00 | 156.00 | 13,000.00 | 2,028.00 | 13,205.77 | 2,060.10 | | 0040 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 1.252 | MILE | 10,800.00 | 13,521.60 | 11,000.00 | 13,772.00 | 13,000.00 | 16,276.00 | 12,957.89 | 16,223.28 | | 0041 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 1,081 | EACH | 6.00 | 6,486.00 | 6.00 | 6,486.00 | 7.00 | 7,567.00 | 7.15 | 7,729.15 | | 0042 | 713-11-00100 | Portable Changeable Message Signs | 1 | EACH | 7,000.00 | 7,000.00 | 9,500.00 | 9,500.00 | 13,000.00 | 13,000.00 | 5,960.94 | 5,960.94 | | 0043 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 734 | SQYD | 2.00 | 1,468.00 | 2.50 | 1,835.00 | 3.00 | 2,202.00 | 2.98 | 2,187.32 | | 0044 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 696 | SQYD | 2.00 | 1,392.00 | 2.50 | 1,740.00 | 3.00 | 2,088.00 | 2.98 | 2,074.08 | | 0045 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 1,195 | SQYD | 2.00 | 2,390.00 | 2.50 | 2,987.50 | 3.00 | 3,585.00 | 2.98 | 3,561.10 | | 0046 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 305 | SQYD | 2.00 | 610.00 | 2.50 | 762.50 | 3.00 | 915.00 | 2.98 | 908.90 | | 0047 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 58,000.00 | 58,000.00 | 10,000.00 | 10,000.00 | 13,000.00 | 13,000.00 | 82,618.57 | 82,618.57 | | 0048 | 724-01-00100 | Rumble Strips (Centerline) | 0.269 | MILE | 502.00 | 135.04 | 1,500.00 | 403.50 | 1,500.00 | 403.50 | 1,794.94 | 482.84 | | 0049 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.536 | MILE | 504.00 | 270.14 | 1,500.00 | 804.00 | 1,500.00 | 804.00 | 1,801.62 | 965.67 | | 0050 | 726-01-00100 | Bedding Material | 0.8 | CUYD | 2,800.00 | 2,240.00 | 800.00 | 640.00 | 300.00 | 240.00 | 298.05 | 238.44 | | 0051 | 727-01-00100 | Mobilization | 1 | LUMP | 494,225.00 | 494,225.00 | 350,000.00 | 350,000.00 | 500,000.00 | 500,000.00 | 106,984.70 | 106,984.70 | | 0052 | 729-01-00100 | Sign (Type A) | 21 | SQFT | 25.00 | 525.00 | 40.00 | 840.00 | 30.00 | 630.00 | 47.69 | 1,001.49 | | 0053 | 729-01-00200 | Mounting of Sign (Type A) | 3 | EACH | 20.00 | 60.00 | 25.00 | 75.00 | 300.00 | 900.00 | 29.80 | 89.40 | | 0054 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 90.00 | 1,080.00 | 135.00 | 1,620.00 | 125.00 | 1,500.00 | 160.95 | 1,931.40 | | 0055 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 6 | EACH | 185.00 | 1,110.00 | 150.00 | 900.00 | 30.00 | 180.00 | 178.83 | 1,072.98 | | 0056 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 1,081 | EACH | 12.00 | 12,972.00 | 12.00 | 12,972.00 | 13.00 | 14,053.00 | 14.31 | 15,469.11 | | 0057 | 731-02-00100 | Reflectorized Raised Pavement Markers | 77 | EACH | 6.00 | 462.00 | 6.00 | 462.00 | 7.00 | 539.00 | 7.15 | 550.55 | | 0058 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.252 | MILE | 5,900.00 | 7,386.80 | 5,900.00 | 7,386.80 | 7,000.00 | 8,764.00 | 7,078.85 | 8,862.72 | | 0059 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.156 | MILE | 2,500.00 | 390.00 | 3,100.00 | 483.60 | 3,500.00 | 546.00 | 3,912.82 | 610.40 | | 0060 | 735-01-00100 | Mailboxes | 3 | EACH | 30.00 | 90.00 | 35.00 | 105.00 | 100.00 | 300.00 | 41.73 | 125.19 | | 0061 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 255.00 | 765.00 | 300.00 | 900.00 | 200.00 | 600.00 | 357.66 | 1,072.98 | | 0062 | 739-01-00100 | Hydro-Seeding | 4.44 | ACRE | 2,610.00 | 11,588.40 | 3,000.00 | 13,320.00 | 3,500.00 | 15,540.00 | 3,576.56 | 15,879.93 | | 0063 | 740-01-00100 | Construction Layout | 1 | LUMP | 87,000.00 | 87,000.00 | 47,000.00 | 47,000.00 | 76,000.00 | 76,000.00 | 20,462.24 | 20,462.24 | | 0064 | 804-01-00400 | Precast Concrete Piles (18") | 4,180 | LNFT | 190.00 | 794,200.00 | 197.00 | 823,460.00 | 160.00 | 668,800.00 | 71.90 | 300,542.00 | | 0065 | 805-01-00100 | Class A1 Concrete (Slab Span) | 532.3 | CUYD | 960.00 | 511,008.00 | 1,400.00 | 745,220.00 | 1,300.00 | 691,990.00 | 1,694.88 | 902,184.62 | | 0066 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 171.72 | CUYD | 1,976.00 | 339,318.72 | 2,300.00 | 394,956.00 | 2,200.00 | 377,784.00 | 2,414.98 | 414,700.37 | | 0067 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 4,148 | SQFT | 3.00 | 12,444.00 | 3.00 | 12,444.00 | 2.50 | 10,370.00 | 7.66 | 31,773.68 | | 0068 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 4,148 | SQFT | 4.00 | 16,592.00 | 3.50 | 14,518.00 | 3.00 | 12,444.00 | 7.66 | 31,773.68 | | 0069 | 806-01-00100 | Deformed Reinforcing Steel | 126,687 | LB | 2.00 | 253,374.00 | 1.15 | 145,690.05 | 1.50 | 190,030.50 | 1.30 | 164,693.10 | | 0070 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 600 | LNFT | 290.00 | 174,000.00 | 215.00 | 129,000.00 | 175.00 | 105,000.00 | 239.63 | 143,778.00 | | 0071 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 4,320 | SQFT | 104.00 | 449,280.00 | 95.00 | 410,400.00 | 95.00 | 410,400.00 | 117.58 | 507,945.60 | | 0072 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 420 | SFIN | 200.00 | 84,000.00 | 160.00 | 67,200.00 | 150.00 | 63,000.00 | 110.70 | 46,494.00 | | 0073 | 815-03-00300 | Joint Seal (Poured) | 648 | LNFT | 15.00 | 9,720.00 | 25.00 | 16,200.00 | 15.00 | 9,720.00 | 6.73 | 4,361.04 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,942,259.90 | | 4,970,259.20 | | 5,049,092.50 | | 5,183,042.03 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Guinn Construction, LLC | - 6 - Gilchrist Construction Company, LLC | - 7 - Baker Pile Driving and Site Work, LLC | - 8 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.44 | LUMP | 140,000.00 | 140,000.00 | 200,000.00 | 200,000.00 | 88,657.03 | 88,657.03 | 400,000.00 | 400,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 | 9,421.46 | 9,421.46 | 20,000.00 | 20,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 3,699 | SQYD | 15.00 | 55,485.00 | 16.00 | 59,184.00 | 8.18 | 30,257.82 | 8.00 | 29,592.00 | | 0004 | 202-02-04501 | Removal of Bridge Bridge Str. No. 084008402700611 (60' x 28' Precast Bridge with Timber Piles) | 1,680 | LUMP | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 41,127.68 | 41,127.68 | 70,000.00 | 70,000.00 | | 0005 | 202-02-04501 | Removal of Bridge Bridge Str. No. 084008402701801 (40' x 28' Precast Bridge with Timber Piles) | 1,120 | LUMP | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 34,139.27 | 34,139.27 | 70,000.00 | 70,000.00 | | 0006 | 202-02-04501 | Removal of Bridge Bridge Str. No. 084008402702861 (80' x 28' Precast Bridge with Timber Piles) | 2,240 | LUMP | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | 49,271.35 | 49,271.35 | 70,000.00 | 70,000.00 | | 0007 | 202-02-12000 | Removal of Fence | 312 | LNFT | 5.00 | 1,560.00 | 2.00 | 624.00 | 11.87 | 3,703.44 | 2.00 | 624.00 | | 0008 | 202-02-14500 | Removal of Guard Rail | 859.7 | LNFT | 8.00 | 6,877.60 | 13.00 | 11,176.10 | 9.00 | 7,737.30 | 10.00 | 8,597.00 | | 0009 | 202-03-38000 | Relocation of Sign | 1 | EACH | 200.00 | 200.00 | 25.00 | 25.00 | 27.50 | 27.50 | 150.00 | 150.00 | | 0010 | 203-02-00100 | Drainage Excavation | 4,315 | CUYD | 25.00 | 107,875.00 | 33.00 | 142,395.00 | 21.00 | 90,615.00 | 35.00 | 151,025.00 | | 0011 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 150,000.00 | 150,000.00 | 427,500.00 | 427,500.00 | 98,835.02 | 98,835.02 | 200,000.00 | 200,000.00 | | 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 24 | EACH | 250.00 | 6,000.00 | 150.00 | 3,600.00 | 422.27 | 10,134.48 | 150.00 | 3,600.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 1,535 | LNFT | 3.00 | 4,605.00 | 3.00 | 4,605.00 | 4.75 | 7,291.25 | 7.00 | 10,745.00 | | 0014 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 5,315.8 | SQYD | 55.00 | 292,369.00 | 42.00 | 223,263.60 | 49.75 | 264,461.05 | 45.00 | 239,211.00 | | 0015 | 304-01-00100 | Lime | 18.85 | TON | 500.00 | 9,425.00 | 500.00 | 9,425.00 | 475.00 | 8,953.75 | 300.00 | 5,655.00 | | 0016 | 304-05-00100 | Lime Treatment (Type E) | 1,330 | SQYD | 25.00 | 33,250.00 | 22.00 | 29,260.00 | 14.20 | 18,886.00 | 8.00 | 10,640.00 | | 0017 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 45 | CUYD | 100.00 | 4,500.00 | 100.00 | 4,500.00 | 191.57 | 8,620.65 | 200.00 | 9,000.00 | | 0018 | 502-01-00100 | Asphalt Concrete | 1,175.3 | TON | 250.00 | 293,825.00 | 250.00 | 293,825.00 | 249.00 | 292,649.70 | 225.00 | 264,442.50 | | 0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 225.3 | TON | 300.00 | 67,590.00 | 250.00 | 56,325.00 | 312.00 | 70,293.60 | 280.00 | 63,084.00 | | 0020 | 510-01-00001 | Pavement Patching (14.5 inch minimum thickness) | 276 | SQYD | 225.00 | 62,100.00 | 200.00 | 55,200.00 | 220.00 | 60,720.00 | 235.00 | 64,860.00 | | 0021 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 470 | INLF | 10.00 | 4,700.00 | 20.00 | 9,400.00 | 6.46 | 3,036.20 | 4.00 | 1,880.00 | | 0022 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 648 | LNFT | 10.00 | 6,480.00 | 20.00 | 12,960.00 | 13.48 | 8,735.04 | 12.00 | 7,776.00 | | 0023 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 1,080 | LNFT | 6.00 | 6,480.00 | 10.00 | 10,800.00 | 11.00 | 11,880.00 | 2.00 | 2,160.00 | | 0024 | 701-05-02062 | Side Drain Pipe (Erosion) (24" RPVCP/CMP) | 111 | LNFT | 130.00 | 14,430.00 | 100.00 | 11,100.00 | 136.88 | 15,193.68 | 260.00 | 28,860.00 | | 0025 | 701-05-02066 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CPPPDW/CMP) | 133 | LNFT | 130.00 | 17,290.00 | 100.00 | 13,300.00 | 136.47 | 18,150.51 | 260.00 | 34,580.00 | | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 466 | LNFT | 10.00 | 4,660.00 | 12.00 | 5,592.00 | 53.84 | 25,089.44 | 0.50 | 233.00 | | 0027 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 6,500.00 | 6,500.00 | 10,000.00 | 10,000.00 | 6,323.25 | 6,323.25 | 13,000.00 | 13,000.00 | | 0028 | 704-03-00100 | Blocked Out Guard rail | 31.3 | LNFT | 36.00 | 1,126.80 | 25.00 | 782.50 | 42.00 | 1,314.60 | 34.00 | 1,064.20 | | 0029 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 606.3 | LNFT | 37.00 | 22,433.10 | 25.00 | 15,157.50 | 28.00 | 16,976.40 | 34.00 | 20,614.20 | | 0030 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 175.00 | 1,102.50 | 100.00 | 630.00 | 182.00 | 1,146.60 | 160.00 | 1,008.00 | | 0031 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 125.00 | 37,500.00 | 100.00 | 30,000.00 | 111.50 | 33,450.00 | 120.00 | 36,000.00 | | 0032 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 11 | EACH | 3,550.00 | 39,050.00 | 3,000.00 | 33,000.00 | 3,777.83 | 41,556.13 | 3,350.00 | 36,850.00 | | 0033 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 378 | LNFT | 15.00 | 5,670.00 | 16.00 | 6,048.00 | 21.17 | 8,002.26 | 16.00 | 6,048.00 | | 0034 | 708-01-00100 | Right-of-Way Monument | 34 | EACH | 800.00 | 27,200.00 | 600.00 | 20,400.00 | 699.67 | 23,788.78 | 600.00 | 20,400.00 | | 0035 | 708-02-00100 | Right-of-Way Monument Witness Post | 34 | EACH | 400.00 | 13,600.00 | 200.00 | 6,800.00 | 242.07 | 8,230.38 | 200.00 | 6,800.00 | | 0036 | 711-03-00400 | Riprap (55 lb) | 2,836 | TON | 100.00 | 283,600.00 | 100.00 | 283,600.00 | 117.02 | 331,868.72 | 120.00 | 340,320.00 | | 0037 | 711-04-00100 | Geotextile Fabric | 3,500 | SQYD | 4.00 | 14,000.00 | 6.00 | 21,000.00 | 4.75 | 16,625.00 | 2.00 | 7,000.00 | | 0038 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 55,000.00 | 55,000.00 | 150,000.00 | 150,000.00 | 51,480.00 | 51,480.00 | 70,000.00 | 70,000.00 | | 0039 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 0.156 | MILE | 13,000.00 | 2,028.00 | 1.00 | 0.16 | 13,000.00 | 2,028.00 | 15,000.00 | 2,340.00 | | 0040 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 1.252 | MILE | 13,000.00 | 16,276.00 | 1.00 | 1.25 | 19,060.00 | 23,863.12 | 11,000.00 | 13,772.00 | | 0041 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 1,081 | EACH | 8.50 | 9,188.50 | 7.00 | 7,567.00 | 5.92 | 6,399.52 | 6.00 | 6,486.00 | | 0042 | 713-11-00100 | Portable Changeable Message Signs | 1 | EACH | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 23,331.32 | 23,331.32 | 25,000.00 | 25,000.00 | | 0043 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 734 | SQYD | 2.00 | 1,468.00 | 1.50 | 1,101.00 | 3.13 | 2,297.42 | 2.00 | 1,468.00 | | 0044 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 696 | SQYD | 2.00 | 1,392.00 | 1.75 | 1,218.00 | 3.39 | 2,359.44 | 2.00 | 1,392.00 | | 0045 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 1,195 | SQYD | 3.00 | 3,585.00 | 1.75 | 2,091.25 | 3.75 | 4,481.25 | 2.00 | 2,390.00 | | 0046 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 305 | SQYD | 5.00 | 1,525.00 | 1.75 | 533.75 | 4.85 | 1,479.25 | 2.00 | 610.00 | | 0047 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 39,817.32 | 39,817.32 | 20,000.00 | 20,000.00 | | 0048 | 724-01-00100 | Rumble Strips (Centerline) | 0.269 | MILE | 1,000.00 | 269.00 | 1,500.00 | 403.50 | 2,230.00 | 599.87 | 1,500.00 | 403.50 | | 0049 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.536 | MILE | 1,000.00 | 536.00 | 1,500.00 | 804.00 | 1,400.00 | 750.40 | 1,500.00 | 804.00 | | 0050 | 726-01-00100 | Bedding Material | 0.8 | CUYD | 1,000.00 | 800.00 | 125.00 | 100.00 | 2,308.00 | 1,846.40 | 1,000.00 | 800.00 | | 0051 | 727-01-00100 | Mobilization | 1 | LUMP | 500,000.00 | 500,000.00 | 400,000.00 | 400,000.00 | 532,733.32 | 532,733.32 | 555,000.00 | 555,000.00 | | 0052 | 729-01-00100 | Sign (Type A) | 21 | SQFT | 75.00 | 1,575.00 | 25.00 | 525.00 | 48.99 | 1,028.79 | 25.00 | 525.00 | | 0053 | 729-01-00200 | Mounting of Sign (Type A) | 3 | EACH | 100.00 | 300.00 | 250.00 | 750.00 | 425.44 | 1,276.32 | 20.00 | 60.00 | | 0054 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 150.00 | 1,800.00 | 100.00 | 1,200.00 | 136.61 | 1,639.32 | 90.00 | 1,080.00 | | 0055 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 6 | EACH | 150.00 | 900.00 | 25.00 | 150.00 | 102.72 | 616.32 | 185.00 | 1,110.00 | | 0056 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 1,081 | EACH | 15.00 | 16,215.00 | 12.00 | 12,972.00 | 18.02 | 19,479.62 | 12.00 | 12,972.00 | | 0057 | 731-02-00100 | Reflectorized Raised Pavement Markers | 77 | EACH | 8.00 | 616.00 | 6.00 | 462.00 | 27.86 | 2,145.22 | 6.00 | 462.00 | | 0058 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.252 | MILE | 7,000.00 | 8,764.00 | 6,000.00 | 7,512.00 | 13,560.00 | 16,977.12 | 6,000.00 | 7,512.00 | | 0059 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.156 | MILE | 4,500.00 | 702.00 | 3,300.00 | 514.80 | 5,650.00 | 881.40 | 3,000.00 | 468.00 | | 0060 | 735-01-00100 | Mailboxes | 3 | EACH | 100.00 | 300.00 | 50.00 | 150.00 | 205.44 | 616.32 | 30.00 | 90.00 | | 0061 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 100.00 | 300.00 | 100.00 | 300.00 | 260.44 | 781.32 | 255.00 | 765.00 | | 0062 | 739-01-00100 | Hydro-Seeding | 4.44 | ACRE | 3,000.00 | 13,320.00 | 3,000.00 | 13,320.00 | 3,590.00 | 15,939.60 | 2,600.00 | 11,544.00 | | 0063 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 | 30,178.26 | 30,178.26 | 50,000.00 | 50,000.00 | | 0064 | 804-01-00400 | Precast Concrete Piles (18") | 4,180 | LNFT | 160.00 | 668,800.00 | 160.00 | 668,800.00 | 177.80 | 743,204.00 | 180.00 | 752,400.00 | | 0065 | 805-01-00100 | Class A1 Concrete (Slab Span) | 532.3 | CUYD | 1,500.00 | 798,450.00 | 1,200.00 | 638,760.00 | 1,437.90 | 765,394.17 | 1,225.00 | 652,067.50 | | 0066 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 171.72 | CUYD | 2,250.00 | 386,370.00 | 2,000.00 | 343,440.00 | 2,633.00 | 452,138.76 | 2,300.00 | 394,956.00 | | 0067 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 4,148 | SQFT | 1.50 | 6,222.00 | 4.00 | 16,592.00 | 4.11 | 17,048.28 | 1.45 | 6,014.60 | | 0068 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 4,148 | SQFT | 2.00 | 8,296.00 | 4.00 | 16,592.00 | 4.11 | 17,048.28 | 2.00 | 8,296.00 | | 0069 | 806-01-00100 | Deformed Reinforcing Steel | 126,687 | LB | 1.50 | 190,030.50 | 1.10 | 139,355.70 | 1.36 | 172,294.32 | 1.50 | 190,030.50 | | 0070 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 600 | LNFT | 300.00 | 180,000.00 | 275.00 | 165,000.00 | 294.67 | 176,802.00 | 200.00 | 120,000.00 | | 0071 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 4,320 | SQFT | 100.00 | 432,000.00 | 125.00 | 540,000.00 | 123.15 | 532,008.00 | 100.00 | 432,000.00 | | 0072 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 420 | SFIN | 150.00 | 63,000.00 | 100.00 | 42,000.00 | 134.97 | 56,687.40 | 90.00 | 37,800.00 | | 0073 | 815-03-00300 | Joint Seal (Poured) | 648 | LNFT | 35.00 | 22,680.00 | 25.00 | 16,200.00 | 22.50 | 14,580.00 | 18.00 | 11,664.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,334,192.00 | | 5,494,893.11 | | 5,499,401.79 | | 5,648,101.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Matt L. Guinn Construction, LLC | - 10 - WL Bass Construction Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.44 | LUMP | 105,000.00 | 105,000.00 | 348,000.00 | 348,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 70,000.00 | 70,000.00 | 12,050.00 | 12,050.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 3,699 | SQYD | 10.00 | 36,990.00 | 5.00 | 18,495.00 | | 0004 | 202-02-04501 | Removal of Bridge Bridge Str. No. 084008402700611 (60' x 28' Precast Bridge with Timber Piles) | 1,680 | LUMP | 40,000.00 | 40,000.00 | 80,000.00 | 80,000.00 | | 0005 | 202-02-04501 | Removal of Bridge Bridge Str. No. 084008402701801 (40' x 28' Precast Bridge with Timber Piles) | 1,120 | LUMP | 40,000.00 | 40,000.00 | 70,000.00 | 70,000.00 | | 0006 | 202-02-04501 | Removal of Bridge Bridge Str. No. 084008402702861 (80' x 28' Precast Bridge with Timber Piles) | 2,240 | LUMP | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | | 0007 | 202-02-12000 | Removal of Fence | 312 | LNFT | 10.00 | 3,120.00 | 1.00 | 312.00 | | 0008 | 202-02-14500 | Removal of Guard Rail | 859.7 | LNFT | 20.00 | 17,194.00 | 13.00 | 11,176.10 | | 0009 | 202-03-38000 | Relocation of Sign | 1 | EACH | 400.00 | 400.00 | 1,000.00 | 1,000.00 | | 0010 | 203-02-00100 | Drainage Excavation | 4,315 | CUYD | 25.00 | 107,875.00 | 25.00 | 107,875.00 | | 0011 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 175,000.00 | 175,000.00 | 300,000.00 | 300,000.00 | | 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 24 | EACH | 500.00 | 12,000.00 | 150.00 | 3,600.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 1,535 | LNFT | 5.00 | 7,675.00 | 4.00 | 6,140.00 | | 0014 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 5,315.8 | SQYD | 48.00 | 255,158.40 | 40.00 | 212,632.00 | | 0015 | 304-01-00100 | Lime | 18.85 | TON | 400.00 | 7,540.00 | 400.00 | 7,540.00 | | 0016 | 304-05-00100 | Lime Treatment (Type E) | 1,330 | SQYD | 10.00 | 13,300.00 | 8.00 | 10,640.00 | | 0017 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 45 | CUYD | 210.00 | 9,450.00 | 135.00 | 6,075.00 | | 0018 | 502-01-00100 | Asphalt Concrete | 1,175.3 | TON | 300.00 | 352,590.00 | 167.00 | 196,275.10 | | 0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 225.3 | TON | 390.00 | 87,867.00 | 250.00 | 56,325.00 | | 0020 | 510-01-00001 | Pavement Patching (14.5 inch minimum thickness) | 276 | SQYD | 250.00 | 69,000.00 | 300.00 | 82,800.00 | | 0021 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 470 | INLF | 10.00 | 4,700.00 | 1.00 | 470.00 | | 0022 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 648 | LNFT | 20.00 | 12,960.00 | 10.00 | 6,480.00 | | 0023 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 1,080 | LNFT | 7.00 | 7,560.00 | 1.00 | 1,080.00 | | 0024 | 701-05-02062 | Side Drain Pipe (Erosion) (24" RPVCP/CMP) | 111 | LNFT | 110.00 | 12,210.00 | 120.00 | 13,320.00 | | 0025 | 701-05-02066 | Side Drain Pipe (Erosion) (24" RPVCP/CPEPDW/CPPPDW/CMP) | 133 | LNFT | 110.00 | 14,630.00 | 130.00 | 17,290.00 | | 0026 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 466 | LNFT | 20.00 | 9,320.00 | 40.00 | 18,640.00 | | 0027 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | | 0028 | 704-03-00100 | Blocked Out Guard rail | 31.3 | LNFT | 80.00 | 2,504.00 | 25.00 | 782.50 | | 0029 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 606.3 | LNFT | 55.00 | 33,346.50 | 25.00 | 15,157.50 | | 0030 | 704-05-00100 | Guard Rail Anchor Sections (Trailing End) | 6.3 | LNFT | 150.00 | 945.00 | 100.00 | 630.00 | | 0031 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 145.00 | 43,500.00 | 100.00 | 30,000.00 | | 0032 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 11 | EACH | 4,200.00 | 46,200.00 | 3,000.00 | 33,000.00 | | 0033 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 378 | LNFT | 25.00 | 9,450.00 | 16.00 | 6,048.00 | | 0034 | 708-01-00100 | Right-of-Way Monument | 34 | EACH | 750.00 | 25,500.00 | 600.00 | 20,400.00 | | 0035 | 708-02-00100 | Right-of-Way Monument Witness Post | 34 | EACH | 300.00 | 10,200.00 | 200.00 | 6,800.00 | | 0036 | 711-03-00400 | Riprap (55 lb) | 2,836 | TON | 91.50 | 259,494.00 | 120.00 | 340,320.00 | | 0037 | 711-04-00100 | Geotextile Fabric | 3,500 | SQYD | 4.00 | 14,000.00 | 4.00 | 14,000.00 | | 0038 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 135,000.00 | 135,000.00 | 200,400.00 | 200,400.00 | | 0039 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 0.156 | MILE | 6,000.00 | 936.00 | 10,800.00 | 1,684.80 | | 0040 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 1.252 | MILE | 6,000.00 | 7,512.00 | 10,800.00 | 13,521.60 | | 0041 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 1,081 | EACH | 7.00 | 7,567.00 | 6.00 | 6,486.00 | | 0042 | 713-11-00100 | Portable Changeable Message Signs | 1 | EACH | 7,500.00 | 7,500.00 | 30,100.00 | 30,100.00 | | 0043 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 734 | SQYD | 10.00 | 7,340.00 | 2.00 | 1,468.00 | | 0044 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 696 | SQYD | 10.00 | 6,960.00 | 2.00 | 1,392.00 | | 0045 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 1,195 | SQYD | 10.00 | 11,950.00 | 2.00 | 2,390.00 | | 0046 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 305 | SQYD | 10.00 | 3,050.00 | 2.00 | 610.00 | | 0047 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | | 0048 | 724-01-00100 | Rumble Strips (Centerline) | 0.269 | MILE | 10,000.00 | 2,690.00 | 1,500.00 | 403.50 | | 0049 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.536 | MILE | 10,000.00 | 5,360.00 | 1,500.00 | 804.00 | | 0050 | 726-01-00100 | Bedding Material | 0.8 | CUYD | 250.00 | 200.00 | 180.00 | 144.00 | | 0051 | 727-01-00100 | Mobilization | 1 | LUMP | 500,000.00 | 500,000.00 | 593,100.00 | 593,100.00 | | 0052 | 729-01-00100 | Sign (Type A) | 21 | SQFT | 200.00 | 4,200.00 | 25.00 | 525.00 | | 0053 | 729-01-00200 | Mounting of Sign (Type A) | 3 | EACH | 250.00 | 750.00 | 250.00 | 750.00 | | 0054 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 140.00 | 1,680.00 | 100.00 | 1,200.00 | | 0055 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 6 | EACH | 400.00 | 2,400.00 | 25.00 | 150.00 | | 0056 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 1,081 | EACH | 14.00 | 15,134.00 | 12.00 | 12,972.00 | | 0057 | 731-02-00100 | Reflectorized Raised Pavement Markers | 77 | EACH | 8.00 | 616.00 | 6.00 | 462.00 | | 0058 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.252 | MILE | 7,000.00 | 8,764.00 | 5,900.00 | 7,386.80 | | 0059 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.156 | MILE | 4,000.00 | 624.00 | 3,900.00 | 608.40 | | 0060 | 735-01-00100 | Mailboxes | 3 | EACH | 300.00 | 900.00 | 50.00 | 150.00 | | 0061 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 200.00 | 600.00 | 100.00 | 300.00 | | 0062 | 739-01-00100 | Hydro-Seeding | 4.44 | ACRE | 5,000.00 | 22,200.00 | 2,650.00 | 11,766.00 | | 0063 | 740-01-00100 | Construction Layout | 1 | LUMP | 60,000.00 | 60,000.00 | 192,000.00 | 192,000.00 | | 0064 | 804-01-00400 | Precast Concrete Piles (18") | 4,180 | LNFT | 162.00 | 677,160.00 | 220.00 | 919,600.00 | | 0065 | 805-01-00100 | Class A1 Concrete (Slab Span) | 532.3 | CUYD | 1,700.00 | 904,910.00 | 350.00 | 186,305.00 | | 0066 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 171.72 | CUYD | 2,400.00 | 412,128.00 | 350.00 | 60,102.00 | | 0067 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 4,148 | SQFT | 3.00 | 12,444.00 | 2.00 | 8,296.00 | | 0068 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 4,148 | SQFT | 3.00 | 12,444.00 | 2.00 | 8,296.00 | | 0069 | 806-01-00100 | Deformed Reinforcing Steel | 126,687 | LB | 1.50 | 190,030.50 | 4.75 | 601,763.25 | | 0070 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 600 | LNFT | 255.00 | 153,000.00 | 300.00 | 180,000.00 | | 0071 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 4,320 | SQFT | 120.00 | 518,400.00 | 150.00 | 648,000.00 | | 0072 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 420 | SFIN | 205.00 | 86,100.00 | 120.00 | 50,400.00 | | 0073 | 815-03-00300 | Joint Seal (Poured) | 648 | LNFT | 30.00 | 19,440.00 | 20.00 | 12,960.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,799,668.40 | | 5,931,849.55 |
|