Proposal:H.012622.6
Parish:Livingston
Routes:I-12
Description:I-12: HOG BRANCH BRIDGE REPLACEMENT
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGES, GRADING, DRAINAGE STRUCTURES, CULVERT REHAB, MILLING ASPHALT CONCRETE. PAVEMENT PATCHING, SUBGRADE TREATMENT, CLASS II BASE COURSE, PAVEMENT WIDENING, ASPHALT CONCRETE OVERLAY, TEMPORARY DETOUR ROADS, PRECAST CONCRETE PILES, CONCRETE APPROACH SLABS, PRECAST-PRESTRESSED CONCRETE GIRDER SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$38,450,709.27
Maximum Number of Days Allowed for Construction:1000
Calculated Daily User Cost:$20,000.00
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time | Total Bid |
| 1 | 39462 | JB JAMES CONSTRUCTION LLC | $31,222,040.92 | 480.00 | $40,822,040.92 |
| 2 | 79463 | Denley Brown Contractors, LLC | $30,773,970.82 | 600.00 | $42,773,970.82 |
| 3 | 34567 | James Construction Group LLC | $33,281,809.29 | 617.00 | $45,621,809.29 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $43,562,754.47 | 600.00 | $55,562,754.47 |
| 5 | 12312 | Gilchrist Construction Company, LLC | $41,364,458.40 | 750.00 | $56,364,458.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - JB JAMES CONSTRUCTION LLC | - 2 - Denley Brown Contractors, LLC | - 3 - James Construction Group LLC | - 4 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 19 | LUMP | 400,000.00 | 400,000.00 | 3,000,000.00 | 3,000,000.00 | 250,000.00 | 250,000.00 | 515,000.00 | 515,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 40,000.00 | 40,000.00 | 11,000.00 | 11,000.00 | 80,000.00 | 80,000.00 | 100,000.00 | 100,000.00 | | 0003 | 202-02-00010 | Removal of Gated End Terminal Anchors | 10 | EACH | 1,100.00 | 11,000.00 | 1,500.00 | 15,000.00 | 100.00 | 1,000.00 | 1,500.00 | 15,000.00 | | 0004 | 202-02-00020 | Removal of Concrete Strip (6" thick) | 6,217 | SQYD | 18.00 | 111,906.00 | 7.40 | 46,005.80 | 20.00 | 124,340.00 | 6.00 | 37,302.00 | | 0005 | 202-02-00030 | Removal of Cable Barrier | 6,726 | LNFT | 3.00 | 20,178.00 | 3.00 | 20,178.00 | 11.00 | 73,986.00 | 5.00 | 33,630.00 | | 0006 | 202-02-02020 | Removal of Asphalt Pavement | 1,413.5 | SQYD | 13.00 | 18,375.50 | 9.00 | 12,721.50 | 12.00 | 16,962.00 | 5.00 | 7,067.50 | | 0007 | 202-02-03030 | Removal of Pavement Structure | 10,944.4 | SQYD | 28.00 | 306,443.20 | 20.00 | 218,888.00 | 25.00 | 273,610.00 | 15.00 | 164,166.00 | | 0008 | 202-02-04501 | Removal of Bridge Recall number 620660; PPC Type III Girder Bridges; 10,482 sqft - bid as lump sum | 1 | LUMP | 420,000.00 | 420,000.00 | 400,000.00 | 400,000.00 | 360,000.00 | 360,000.00 | 1,175,000.00 | 1,175,000.00 | | 0009 | 202-02-04501 | Removal of Bridge Recall numbers 620670; PPC Type III Girder Bridges; 10,482 sqft - bid as lump sum | 1 | LUMP | 420,000.00 | 420,000.00 | 400,000.00 | 400,000.00 | 360,000.00 | 360,000.00 | 1,175,000.00 | 1,175,000.00 | | 0010 | 202-02-12000 | Removal of Fence | 118 | LNFT | 6.00 | 708.00 | 4.00 | 472.00 | 3.00 | 354.00 | 10.00 | 1,180.00 | | 0011 | 202-02-14500 | Removal of Guard Rail | 1,100 | LNFT | 12.00 | 13,200.00 | 10.00 | 11,000.00 | 7.00 | 7,700.00 | 12.00 | 13,200.00 | | 0012 | 203-01-00100 | General Excavation | 8,216 | CUYD | 70.00 | 575,120.00 | 21.00 | 172,536.00 | 9.00 | 73,944.00 | 30.00 | 246,480.00 | | 0013 | 203-03-00100 | Embankment | 17,217 | CUYD | 80.00 | 1,377,360.00 | 36.00 | 619,812.00 | 45.00 | 774,765.00 | 45.00 | 774,765.00 | | 0014 | 204-02-00100 | Temporary Hay Bales | 241 | EACH | 50.00 | 12,050.00 | 25.00 | 6,025.00 | 25.00 | 6,025.00 | 50.00 | 12,050.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 17,832 | LNFT | 3.00 | 53,496.00 | 2.50 | 44,580.00 | 2.40 | 42,796.80 | 2.25 | 40,122.00 | | 0016 | 204-07-00100 | Temporary Stone Construction Entrance | 2 | EACH | 10,000.00 | 20,000.00 | 75,000.00 | 150,000.00 | 1,000.00 | 2,000.00 | 40,000.00 | 80,000.00 | | 0017 | 302-02-04070 | Class II Base Course (4" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 36,539.8 | SQYD | 24.00 | 876,955.20 | 14.50 | 529,827.10 | 20.00 | 730,796.00 | 16.00 | 584,636.80 | | 0018 | 302-02-08010 | Class II Base Course (8" Thick) (Soil Cement) | 36,539.8 | SQYD | 28.00 | 1,023,114.40 | 21.00 | 767,335.80 | 32.00 | 1,169,273.60 | 26.00 | 950,034.80 | | 0019 | 302-02-12020 | Class II Base Course (12" Thick) (Crushed Stone) | 5,764.6 | SQYD | 54.00 | 311,288.40 | 36.00 | 207,525.60 | 50.00 | 288,230.00 | 30.00 | 172,938.00 | | 0020 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 43,882 | SQYD | 20.00 | 877,640.00 | 18.00 | 789,876.00 | 60.00 | 2,632,920.00 | 21.00 | 921,522.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 44,115.6 | TON | 116.00 | 5,117,409.60 | 115.00 | 5,073,294.00 | 115.00 | 5,073,294.00 | 150.00 | 6,617,340.00 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 393.4 | TON | 200.00 | 78,680.00 | 198.00 | 77,893.20 | 198.00 | 77,893.20 | 180.00 | 70,812.00 | | 0023 | 509-01-00100 | Milling Asphalt Pavement | 62,750 | SQYD | 4.00 | 251,000.00 | 3.75 | 235,312.50 | 3.50 | 219,625.00 | 2.20 | 138,050.00 | | 0024 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,578 | CUYD | 0.01 | -35.78 | 0.01 | -35.78 | 0.01 | -35.78 | 0.01 | -35.78 | | 0025 | 510-01-00001 | Pavement Patching 9.5" Minimum Thickness | 312 | SQYD | 150.00 | 46,800.00 | 180.00 | 56,160.00 | 100.00 | 31,200.00 | 115.00 | 35,880.00 | | 0026 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 69,792 | INLF | 0.60 | 41,875.20 | 0.60 | 41,875.20 | 0.01 | 697.92 | 0.75 | 52,344.00 | | 0027 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 720 | LNFT | 5.00 | 3,600.00 | 6.00 | 4,320.00 | 5.00 | 3,600.00 | 13.00 | 9,360.00 | | 0028 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 2,164 | LNFT | 1.00 | 2,164.00 | 1.00 | 2,164.00 | 1.00 | 2,164.00 | 5.00 | 10,820.00 | | 0029 | 602-11-00100 | Removal of Existing Shoulder Underdrain Systems | 4,768 | LNFT | 5.00 | 23,840.00 | 6.00 | 28,608.00 | 2.50 | 11,920.00 | 5.00 | 23,840.00 | | 0030 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 762 | LNFT | 250.00 | 190,500.00 | 100.00 | 76,200.00 | 160.00 | 121,920.00 | 80.00 | 60,960.00 | | 0031 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 145 | LNFT | 300.00 | 43,500.00 | 105.00 | 15,225.00 | 155.00 | 22,475.00 | 100.00 | 14,500.00 | | 0032 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 218 | LNFT | 350.00 | 76,300.00 | 130.00 | 28,340.00 | 175.00 | 38,150.00 | 120.00 | 26,160.00 | | 0033 | 702-02-00900 | Manholes (MH-14X Open) | 2 | EACH | 30,000.00 | 60,000.00 | 23,000.00 | 46,000.00 | 13,000.00 | 26,000.00 | 15,000.00 | 30,000.00 | | 0034 | 702-03-00100 | Catch Basins (CB-01) | 12 | EACH | 12,000.00 | 144,000.00 | 4,100.00 | 49,200.00 | 9,000.00 | 108,000.00 | 5,000.00 | 60,000.00 | | 0035 | 703-01-00100 | Shoulder Underdrain Systems | 1,869 | LNFT | 22.00 | 41,118.00 | 19.00 | 35,511.00 | 25.00 | 46,725.00 | 20.00 | 37,380.00 | | 0036 | 703-02-00100 | Shoulder Outlet Underdrains | 12 | EACH | 1,500.00 | 18,000.00 | 1,000.00 | 12,000.00 | 2,900.00 | 34,800.00 | 850.00 | 10,200.00 | | 0037 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,225 | LNFT | 25.00 | 30,625.00 | 34.00 | 41,650.00 | 34.00 | 41,650.00 | 35.00 | 42,875.00 | | 0038 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 18.75 | LNFT | 95.00 | 1,781.25 | 180.00 | 3,375.00 | 183.00 | 3,431.25 | 120.00 | 2,250.00 | | 0039 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 85.00 | 4,250.00 | 118.00 | 5,900.00 | 118.00 | 5,900.00 | 110.00 | 5,500.00 | | 0040 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 5 | EACH | 3,000.00 | 15,000.00 | 3,200.00 | 16,000.00 | 3,180.00 | 15,900.00 | 4,000.00 | 20,000.00 | | 0041 | 710-01-00100 | Flowable Fill | 8 | CUYD | 1,000.00 | 8,000.00 | 300.00 | 2,400.00 | 285.00 | 2,280.00 | 500.00 | 4,000.00 | | 0042 | 711-01-06000 | Riprap (250 lb, 30" Thick) | 1,588 | SQYD | 200.00 | 317,600.00 | 140.00 | 222,320.00 | 330.00 | 524,040.00 | 225.00 | 357,300.00 | | 0043 | 711-04-00100 | Geotextile Fabric | 2,312 | SQYD | 3.00 | 6,936.00 | 4.40 | 10,172.80 | 1.50 | 3,468.00 | 2.00 | 4,624.00 | | 0044 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 500,000.00 | 500,000.00 | 500,000.00 | 500,000.00 | 415,000.00 | 415,000.00 | 1,500,000.00 | 1,500,000.00 | | 0045 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 19.68 | MILE | 1,300.00 | 25,584.00 | 1,500.00 | 29,520.00 | 1,250.00 | 24,600.00 | 1,500.00 | 29,520.00 | | 0046 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.64 | MILE | 7,700.00 | 4,928.00 | 15,000.00 | 9,600.00 | 7,500.00 | 4,800.00 | 15,000.00 | 9,600.00 | | 0047 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 5,448 | EACH | 6.00 | 32,688.00 | 5.00 | 27,240.00 | 5.00 | 27,240.00 | 5.00 | 27,240.00 | | 0048 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 138 | EACH | 1,600.00 | 220,800.00 | 1,000.00 | 138,000.00 | 185.00 | 25,530.00 | 1,100.00 | 151,800.00 | | 0049 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 1,000 | EACH | 250.00 | 250,000.00 | 500.00 | 500,000.00 | 185.00 | 185,000.00 | 400.00 | 400,000.00 | | 0050 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 598 | EACH | 25.00 | 14,950.00 | 100.00 | 59,800.00 | 1.00 | 598.00 | 140.00 | 83,720.00 | | 0051 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 30,000.00 | 60,000.00 | 15,000.00 | 30,000.00 | 20,000.00 | 40,000.00 | 20,000.00 | 40,000.00 | | 0052 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 40,000.00 | 40,000.00 | 75,000.00 | 75,000.00 | 10,000.00 | 10,000.00 | 75,000.00 | 75,000.00 | | 0053 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 6.56 | MILE | 300.00 | 1,968.00 | 300.00 | 1,968.00 | 1,830.00 | 12,004.80 | 800.00 | 5,248.00 | | 0054 | 725-01-00100 | Temporary Detour Roads | 942 | SQYD | 130.00 | 122,460.00 | 120.00 | 113,040.00 | 170.00 | 160,140.00 | 165.00 | 155,430.00 | | 0055 | 726-01-00100 | Bedding Material | 109 | CUYD | 130.00 | 14,170.00 | 110.00 | 11,990.00 | 85.00 | 9,265.00 | 90.00 | 9,810.00 | | 0056 | 727-01-00100 | Mobilization | 1 | LUMP | 3,100,000.00 | 3,100,000.00 | 3,035,000.00 | 3,035,000.00 | 3,281,800.00 | 3,281,800.00 | 4,350,000.00 | 4,350,000.00 | | 0057 | 729-01-00100 | Sign (Type A) | 81 | SQFT | 18.00 | 1,458.00 | 25.00 | 2,025.00 | 25.00 | 2,025.00 | 20.00 | 1,620.00 | | 0058 | 729-01-00200 | Mounting of Sign (Type A) | 2 | EACH | 400.00 | 800.00 | 100.00 | 200.00 | 50.00 | 100.00 | 400.00 | 800.00 | | 0059 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 100.00 | 1,200.00 | 85.00 | 1,020.00 | 85.00 | 1,020.00 | 100.00 | 1,200.00 | | 0060 | 729-17-00100 | Milepost Assembly (Ground Mounted) | 2 | EACH | 900.00 | 1,800.00 | 400.00 | 800.00 | 400.00 | 800.00 | 900.00 | 1,800.00 | | 0061 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 3,942 | EACH | 15.00 | 59,130.00 | 9.00 | 35,478.00 | 15.00 | 59,130.00 | 9.00 | 35,478.00 | | 0062 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,802 | EACH | 6.00 | 16,812.00 | 5.00 | 14,010.00 | 6.00 | 16,812.00 | 5.00 | 14,010.00 | | 0063 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.878 | MILE | 4,500.00 | 30,951.00 | 5,500.00 | 37,829.00 | 4,500.00 | 30,951.00 | 5,500.00 | 37,829.00 | | 0064 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.44 | MILE | 1,500.00 | 5,160.00 | 1,200.00 | 4,128.00 | 1,500.00 | 5,160.00 | 1,200.00 | 4,128.00 | | 0065 | 732-03-02002 | Plastic Pav't Striping (Broken) (4" Width) (Thermo 90 mil)(Black and White Cont) | 0.16 | MILE | 10,150.00 | 1,624.00 | 10,000.00 | 1,600.00 | 10,000.00 | 1,600.00 | 10,000.00 | 1,600.00 | | 0066 | 732-05-00100 | Removal of Existing Markings | 1.72 | MILE | 7,500.00 | 12,900.00 | 10,000.00 | 17,200.00 | 7,545.00 | 12,977.40 | 10,000.00 | 17,200.00 | | 0067 | 739-01-00100 | Hydro-Seeding | 8.89 | ACRE | 3,000.00 | 26,670.00 | 2,600.00 | 23,114.00 | 2,590.00 | 23,025.10 | 3,200.00 | 28,448.00 | | 0068 | 740-01-00100 | Construction Layout | 1 | LUMP | 400,000.00 | 400,000.00 | 285,000.00 | 285,000.00 | 375,000.00 | 375,000.00 | 600,000.00 | 600,000.00 | | 0069 | 802-03-00100 | Temporary Sheeting (Steel) | 6,326 | SQFT | 15.00 | 94,890.00 | 50.00 | 316,300.00 | 60.00 | 379,560.00 | 55.00 | 347,930.00 | | 0070 | 804-01-00200 | Precast Concrete Piles (14") | 140 | LNFT | 200.00 | 28,000.00 | 260.00 | 36,400.00 | 300.00 | 42,000.00 | 267.00 | 37,380.00 | | 0071 | 804-01-00400 | Precast Concrete Piles (18") | 5,440 | LNFT | 250.00 | 1,360,000.00 | 130.00 | 707,200.00 | 219.00 | 1,191,360.00 | 188.00 | 1,022,720.00 | | 0072 | 804-01-00700 | Precast Concrete Piles (30") | 2,720 | LNFT | 300.00 | 816,000.00 | 300.00 | 816,000.00 | 345.00 | 938,400.00 | 315.00 | 856,800.00 | | 0073 | 804-10-00700 | Precast Concrete Indicator Piles (30") | 1 | EACH | 500,000.00 | 500,000.00 | 200,000.00 | 200,000.00 | 150,000.00 | 150,000.00 | 400,000.00 | 400,000.00 | | 0074 | 804-14-00100 | Dynamic Monitoring Assistance | 4 | EACH | 2,000.00 | 8,000.00 | 5,000.00 | 20,000.00 | 4,000.00 | 16,000.00 | 6,700.00 | 26,800.00 | | 0075 | 805-01-00200 | Class A1 Concrete (Deck) | 1,421.42 | CUYD | 1,000.00 | 1,421,420.00 | 1,230.00 | 1,748,346.60 | 2,000.00 | 2,842,840.00 | 4,000.00 | 5,685,680.00 | | 0076 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 325.98 | CUYD | 2,000.00 | 651,960.00 | 1,800.00 | 586,764.00 | 3,000.00 | 977,940.00 | 10,000.00 | 3,259,800.00 | | 0077 | 805-08-01400 | Precast-Prestressed Concrete Girders (Type LG-54) | 6,470 | LNFT | 400.00 | 2,588,000.00 | 340.00 | 2,199,800.00 | 455.00 | 2,943,850.00 | 400.00 | 2,588,000.00 | | 0078 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 51,571 | SQFT | 1.25 | 64,463.75 | 2.00 | 103,142.00 | 1.00 | 51,571.00 | 2.00 | 103,142.00 | | 0079 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 51,571 | SQFT | 1.20 | 61,885.20 | 2.50 | 128,927.50 | 1.00 | 51,571.00 | 2.75 | 141,820.25 | | 0080 | 806-01-00100 | Deformed Reinforcing Steel | 326,954 | LB | 1.50 | 490,431.00 | 1.50 | 490,431.00 | 1.50 | 490,431.00 | 1.35 | 441,387.90 | | 0081 | 806-03-00100 | Deformed Reinforcing Steel Mechanical Splice Mechanical splices | 2,880 | EACH | 35.00 | 100,800.00 | 50.00 | 144,000.00 | 40.00 | 115,200.00 | 50.00 | 144,000.00 | | 0082 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 180 | LUMP | 30,000.00 | 30,000.00 | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | | 0083 | 807-04-00100 | Structural Metalwork (Diaphragm Rods) | 216 | LUMP | 10,000.00 | 10,000.00 | 9,000.00 | 9,000.00 | 7,208.00 | 7,208.00 | 2,000.00 | 2,000.00 | | 0084 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 768 | LNFT | 150.00 | 115,200.00 | 155.00 | 119,040.00 | 165.00 | 126,720.00 | 200.00 | 153,600.00 | | 0085 | 810-01-00300 | Concrete Bridge Railing (Double Face) (42 Inch Height) | 422 | LNFT | 250.00 | 105,500.00 | 310.00 | 130,820.00 | 260.00 | 109,720.00 | 225.00 | 94,950.00 | | 0086 | 810-05-00330 | Concrete Roadway Barrier (Double Face) (42 inch Height) | 2,100 | LNFT | 350.00 | 735,000.00 | 340.00 | 714,000.00 | 360.00 | 756,000.00 | 350.00 | 735,000.00 | | 0087 | 810-05-00400 | Concrete Roadway Barrier (Grade Separated) | 1,789 | LNFT | 1,000.00 | 1,789,000.00 | 850.00 | 1,520,650.00 | 940.00 | 1,681,660.00 | 1,350.00 | 2,415,150.00 | | 0088 | 810-05-00400 | Concrete Roadway Barrier (SSC-HEB) | 1,610 | LNFT | 350.00 | 563,500.00 | 500.00 | 805,000.00 | 330.00 | 531,300.00 | 650.00 | 1,046,500.00 | | 0089 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 9,760 | SQFT | 80.00 | 780,800.00 | 120.00 | 1,171,200.00 | 115.00 | 1,122,400.00 | 150.00 | 1,464,000.00 | | 0090 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 892 | SFIN | 80.00 | 71,360.00 | 110.00 | 98,120.00 | 100.00 | 89,200.00 | 80.00 | 71,360.00 | | 0091 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 240 | LNFT | 400.00 | 96,000.00 | 400.00 | 96,000.00 | 450.00 | 108,000.00 | 400.00 | 96,000.00 | | 0092 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 2 | EACH | 15,000.00 | 30,000.00 | 10,000.00 | 20,000.00 | 4,500.00 | 9,000.00 | 10,000.00 | 20,000.00 | | 0093 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | 2 | EACH | 500.00 | 1,000.00 | 4,000.00 | 8,000.00 | 2,500.00 | 5,000.00 | 500.00 | 1,000.00 | | 0094 | NS-701-00010 | Culvert Rehabilitation by Slip Lining | 400 | LNFT | 870.00 | 348,000.00 | 290.00 | 116,000.00 | 310.00 | 124,000.00 | 400.00 | 160,000.00 | | 0095 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad | 2 | EACH | 1,500.00 | 3,000.00 | 1,300.00 | 2,600.00 | 1,250.00 | 2,500.00 | 1,500.00 | 3,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 31,222,040.92 | | 30,773,970.82 | | 33,281,809.29 | | 43,562,754.47 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 19 | LUMP | 1,750,000.00 | 1,750,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 250,000.00 | 250,000.00 | | 0003 | 202-02-00010 | Removal of Gated End Terminal Anchors | 10 | EACH | 100.00 | 1,000.00 | | 0004 | 202-02-00020 | Removal of Concrete Strip (6" thick) | 6,217 | SQYD | 20.00 | 124,340.00 | | 0005 | 202-02-00030 | Removal of Cable Barrier | 6,726 | LNFT | 10.00 | 67,260.00 | | 0006 | 202-02-02020 | Removal of Asphalt Pavement | 1,413.5 | SQYD | 40.00 | 56,540.00 | | 0007 | 202-02-03030 | Removal of Pavement Structure | 10,944.4 | SQYD | 22.00 | 240,776.80 | | 0008 | 202-02-04501 | Removal of Bridge Recall number 620660; PPC Type III Girder Bridges; 10,482 sqft - bid as lump sum | 1 | LUMP | 1,250,000.00 | 1,250,000.00 | | 0009 | 202-02-04501 | Removal of Bridge Recall numbers 620670; PPC Type III Girder Bridges; 10,482 sqft - bid as lump sum | 1 | LUMP | 1,250,000.00 | 1,250,000.00 | | 0010 | 202-02-12000 | Removal of Fence | 118 | LNFT | 40.00 | 4,720.00 | | 0011 | 202-02-14500 | Removal of Guard Rail | 1,100 | LNFT | 12.00 | 13,200.00 | | 0012 | 203-01-00100 | General Excavation | 8,216 | CUYD | 10.00 | 82,160.00 | | 0013 | 203-03-00100 | Embankment | 17,217 | CUYD | 39.00 | 671,463.00 | | 0014 | 204-02-00100 | Temporary Hay Bales | 241 | EACH | 26.00 | 6,266.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 17,832 | LNFT | 3.00 | 53,496.00 | | 0016 | 204-07-00100 | Temporary Stone Construction Entrance | 2 | EACH | 8,000.00 | 16,000.00 | | 0017 | 302-02-04070 | Class II Base Course (4" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 36,539.8 | SQYD | 21.00 | 767,335.80 | | 0018 | 302-02-08010 | Class II Base Course (8" Thick) (Soil Cement) | 36,539.8 | SQYD | 31.00 | 1,132,733.80 | | 0019 | 302-02-12020 | Class II Base Course (12" Thick) (Crushed Stone) | 5,764.6 | SQYD | 52.00 | 299,759.20 | | 0020 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 43,882 | SQYD | 21.00 | 921,522.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 44,115.6 | TON | 130.00 | 5,735,028.00 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 393.4 | TON | 250.00 | 98,350.00 | | 0023 | 509-01-00100 | Milling Asphalt Pavement | 62,750 | SQYD | 5.00 | 313,750.00 | | 0024 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,578 | CUYD | 1.00 | -3,578.00 | | 0025 | 510-01-00001 | Pavement Patching 9.5" Minimum Thickness | 312 | SQYD | 125.00 | 39,000.00 | | 0026 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 69,792 | INLF | 0.50 | 34,896.00 | | 0027 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 720 | LNFT | 25.00 | 18,000.00 | | 0028 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 2,164 | LNFT | 9.00 | 19,476.00 | | 0029 | 602-11-00100 | Removal of Existing Shoulder Underdrain Systems | 4,768 | LNFT | 7.00 | 33,376.00 | | 0030 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 762 | LNFT | 125.00 | 95,250.00 | | 0031 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 145 | LNFT | 150.00 | 21,750.00 | | 0032 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 218 | LNFT | 180.00 | 39,240.00 | | 0033 | 702-02-00900 | Manholes (MH-14X Open) | 2 | EACH | 8,000.00 | 16,000.00 | | 0034 | 702-03-00100 | Catch Basins (CB-01) | 12 | EACH | 6,000.00 | 72,000.00 | | 0035 | 703-01-00100 | Shoulder Underdrain Systems | 1,869 | LNFT | 35.00 | 65,415.00 | | 0036 | 703-02-00100 | Shoulder Outlet Underdrains | 12 | EACH | 2,600.00 | 31,200.00 | | 0037 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 1,225 | LNFT | 26.00 | 31,850.00 | | 0038 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 18.75 | LNFT | 96.00 | 1,800.00 | | 0039 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 86.00 | 4,300.00 | | 0040 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 5 | EACH | 3,100.00 | 15,500.00 | | 0041 | 710-01-00100 | Flowable Fill | 8 | CUYD | 600.00 | 4,800.00 | | 0042 | 711-01-06000 | Riprap (250 lb, 30" Thick) | 1,588 | SQYD | 167.00 | 265,196.00 | | 0043 | 711-04-00100 | Geotextile Fabric | 2,312 | SQYD | 5.00 | 11,560.00 | | 0044 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 3,800,000.00 | 3,800,000.00 | | 0045 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 19.68 | MILE | 1,600.00 | 31,488.00 | | 0046 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.64 | MILE | 16,000.00 | 10,240.00 | | 0047 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 5,448 | EACH | 5.00 | 27,240.00 | | 0048 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 138 | EACH | 900.00 | 124,200.00 | | 0049 | 713-08-00100 | Temporary Precast Concrete Barrier (Department Furnished) | 1,000 | EACH | 800.00 | 800,000.00 | | 0050 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 598 | EACH | 150.00 | 89,700.00 | | 0051 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 30,000.00 | 60,000.00 | | 0052 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 50,000.00 | 50,000.00 | | 0053 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 6.56 | MILE | 350.00 | 2,296.00 | | 0054 | 725-01-00100 | Temporary Detour Roads | 942 | SQYD | 200.00 | 188,400.00 | | 0055 | 726-01-00100 | Bedding Material | 109 | CUYD | 180.00 | 19,620.00 | | 0056 | 727-01-00100 | Mobilization | 1 | LUMP | 3,800,000.00 | 3,800,000.00 | | 0057 | 729-01-00100 | Sign (Type A) | 81 | SQFT | 20.00 | 1,620.00 | | 0058 | 729-01-00200 | Mounting of Sign (Type A) | 2 | EACH | 400.00 | 800.00 | | 0059 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 100.00 | 1,200.00 | | 0060 | 729-17-00100 | Milepost Assembly (Ground Mounted) | 2 | EACH | 1,000.00 | 2,000.00 | | 0061 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 3,942 | EACH | 10.00 | 39,420.00 | | 0062 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,802 | EACH | 6.00 | 16,812.00 | | 0063 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.878 | MILE | 5,600.00 | 38,516.80 | | 0064 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.44 | MILE | 1,300.00 | 4,472.00 | | 0065 | 732-03-02002 | Plastic Pav't Striping (Broken) (4" Width) (Thermo 90 mil)(Black and White Cont) | 0.16 | MILE | 11,000.00 | 1,760.00 | | 0066 | 732-05-00100 | Removal of Existing Markings | 1.72 | MILE | 15,000.00 | 25,800.00 | | 0067 | 739-01-00100 | Hydro-Seeding | 8.89 | ACRE | 3,000.00 | 26,670.00 | | 0068 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,000,000.00 | 1,000,000.00 | | 0069 | 802-03-00100 | Temporary Sheeting (Steel) | 6,326 | SQFT | 60.00 | 379,560.00 | | 0070 | 804-01-00200 | Precast Concrete Piles (14") | 140 | LNFT | 275.00 | 38,500.00 | | 0071 | 804-01-00400 | Precast Concrete Piles (18") | 5,440 | LNFT | 165.00 | 897,600.00 | | 0072 | 804-01-00700 | Precast Concrete Piles (30") | 2,720 | LNFT | 330.00 | 897,600.00 | | 0073 | 804-10-00700 | Precast Concrete Indicator Piles (30") | 1 | EACH | 350,000.00 | 350,000.00 | | 0074 | 804-14-00100 | Dynamic Monitoring Assistance | 4 | EACH | 4,000.00 | 16,000.00 | | 0075 | 805-01-00200 | Class A1 Concrete (Deck) | 1,421.42 | CUYD | 1,700.00 | 2,416,414.00 | | 0076 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 325.98 | CUYD | 2,700.00 | 880,146.00 | | 0077 | 805-08-01400 | Precast-Prestressed Concrete Girders (Type LG-54) | 6,470 | LNFT | 440.00 | 2,846,800.00 | | 0078 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 51,571 | SQFT | 2.00 | 103,142.00 | | 0079 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 51,571 | SQFT | 2.50 | 128,927.50 | | 0080 | 806-01-00100 | Deformed Reinforcing Steel | 326,954 | LB | 1.25 | 408,692.50 | | 0081 | 806-03-00100 | Deformed Reinforcing Steel Mechanical Splice Mechanical splices | 2,880 | EACH | 40.00 | 115,200.00 | | 0082 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 180 | LUMP | 150,000.00 | 150,000.00 | | 0083 | 807-04-00100 | Structural Metalwork (Diaphragm Rods) | 216 | LUMP | 150,000.00 | 150,000.00 | | 0084 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 768 | LNFT | 175.00 | 134,400.00 | | 0085 | 810-01-00300 | Concrete Bridge Railing (Double Face) (42 Inch Height) | 422 | LNFT | 230.00 | 97,060.00 | | 0086 | 810-05-00330 | Concrete Roadway Barrier (Double Face) (42 inch Height) | 2,100 | LNFT | 400.00 | 840,000.00 | | 0087 | 810-05-00400 | Concrete Roadway Barrier (Grade Separated) | 1,789 | LNFT | 1,000.00 | 1,789,000.00 | | 0088 | 810-05-00400 | Concrete Roadway Barrier (SSC-HEB) | 1,610 | LNFT | 575.00 | 925,750.00 | | 0089 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 9,760 | SQFT | 130.00 | 1,268,800.00 | | 0090 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 892 | SFIN | 90.00 | 80,280.00 | | 0091 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 240 | LNFT | 575.00 | 138,000.00 | | 0092 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 2 | EACH | 10,000.00 | 20,000.00 | | 0093 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | 2 | EACH | 2,000.00 | 4,000.00 | | 0094 | NS-701-00010 | Culvert Rehabilitation by Slip Lining | 400 | LNFT | 500.00 | 200,000.00 | | 0095 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad | 2 | EACH | 1,800.00 | 3,600.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 41,364,458.40 |
|