Proposal:H.011565.6
Parish:Rapides
Routes:I-49, LA 1
Description:I-49: N OF LA 498 TO 0.66 MI E LA 1200
Type Construction:MILLING ASPHALT CONCRETE, PAVMENT PATCHING, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$16,299,815.94
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $15,234,203.74 |
| 2 | 12312 | Gilchrist Construction Company, LLC | $15,686,800.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06102 | Removal of Incidental Concrete Paving | 1 | SQYD | 800.00 | 800.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 3,568 | LNFT | 12.50 | 44,600.00 | 15.00 | 53,520.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,573 | CUYD | 15.00 | 23,595.00 | 75.00 | 117,975.00 | | 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,987 | CUYD | 60.00 | 119,220.00 | 75.00 | 149,025.00 | | 0005 | 502-01-00100 | Asphalt Concrete | 34,196.2 | TON | 140.00 | 4,787,468.00 | 140.00 | 4,787,468.00 | | 0006 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 629.4 | TON | 265.00 | 166,791.00 | 500.00 | 314,700.00 | | 0007 | 502-04-00100 | Asphalt Concrete (SMA) Wearing Course | 35,411 | TON | 183.00 | 6,480,213.00 | 160.00 | 5,665,760.00 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 259,238 | SQYD | 3.25 | 842,523.50 | 4.00 | 1,036,952.00 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -10,395 | CUYD | 1.00 | -10,395.00 | 1.00 | -10,395.00 | | 0010 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 477 | SQYD | 135.00 | 64,395.00 | 170.00 | 81,090.00 | | 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 514 | SQYD | 150.00 | 77,100.00 | 160.00 | 82,240.00 | | 0012 | 510-01-00400 | Pavement Patching (24" Minimum Thickness) | 2,698 | SQYD | 215.00 | 580,070.00 | 270.00 | 728,460.00 | | 0013 | 511-02-00100 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 444 | LNFT | 45.00 | 19,980.00 | 35.00 | 15,540.00 | | 0014 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 507 | LNFT | 45.00 | 22,815.00 | 35.00 | 17,745.00 | | 0015 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 951 | LNFT | 15.00 | 14,265.00 | 20.00 | 19,020.00 | | 0016 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 170 | INLF | 5.00 | 850.00 | 20.00 | 3,400.00 | | 0017 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 7,500.00 | 7,500.00 | 3,500.00 | 3,500.00 | | 0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 2,331.4 | LNFT | 35.50 | 82,764.70 | 36.00 | 83,930.40 | | 0019 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 29.7 | LNFT | 140.00 | 4,158.00 | 140.00 | 4,158.00 | | 0020 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 100 | LNFT | 90.00 | 9,000.00 | 90.00 | 9,000.00 | | 0021 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 300 | LNFT | 135.00 | 40,500.00 | 135.00 | 40,500.00 | | 0022 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 4,150.00 | 8,300.00 | 4,200.00 | 8,400.00 | | 0023 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 11 | EACH | 3,750.00 | 41,250.00 | 3,800.00 | 41,800.00 | | 0024 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 12.4 | SQYD | 195.00 | 2,418.00 | 500.00 | 6,200.00 | | 0025 | 707-03-00100 | Combination Concrete Curb and Gutter | 13 | LNFT | 250.00 | 3,250.00 | 500.00 | 6,500.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 432,000.00 | 432,000.00 | 410,000.00 | 410,000.00 | | 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 55.149 | MILE | 160.00 | 8,823.84 | 300.00 | 16,544.70 | | 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 47.948 | MILE | 650.00 | 31,166.20 | 650.00 | 31,166.20 | | 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 112.846 | MILE | 1,100.00 | 124,130.60 | 1,050.00 | 118,488.30 | | 0030 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 62.325 | MILE | 1,000.00 | 62,325.00 | 1,000.00 | 62,325.00 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 755,000.00 | 755,000.00 | 1,250,000.00 | 1,250,000.00 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 17 | EACH | 135.00 | 2,295.00 | 135.00 | 2,295.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,602 | EACH | 6.00 | 21,612.00 | 7.00 | 25,214.00 | | 0034 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,084 | LNFT | 12.00 | 13,008.00 | 13.00 | 14,092.00 | | 0035 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 36 | LNFT | 12.00 | 432.00 | 13.00 | 468.00 | | 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 37.615 | MILE | 5,900.00 | 221,928.50 | 6,000.00 | 225,690.00 | | 0037 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 1.357 | MILE | 14,500.00 | 19,676.50 | 15,000.00 | 20,355.00 | | 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 15.983 | MILE | 2,600.00 | 41,555.80 | 2,500.00 | 39,957.50 | | 0039 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 0.581 | MILE | 13,500.00 | 7,843.50 | 13,500.00 | 7,843.50 | | 0040 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 0.066 | MILE | 10,500.00 | 693.00 | 9,000.00 | 594.00 | | 0041 | 732-05-00100 | Removal of Existing Markings | 0.778 | MILE | 11,200.00 | 8,713.60 | 13,000.00 | 10,114.00 | | 0042 | 739-01-00100 | Hydro-Seeding | 4.523 | ACRE | 3,000.00 | 13,569.00 | 2,800.00 | 12,664.40 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 36,000.00 | 36,000.00 | 162,500.00 | 162,500.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 15,234,203.74 | | 15,686,800.00 |
|