Proposal:H.016302.6-R1
Parish:Calcasieu
Routes:LA 397
Description:LA 397: LA 14 - US 90
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, REINFORCED PAVING MAT WITH ASPHALT TACK COAT, CULVERT REHABILITATION, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,350,356.59
| Rank | License | Bidder | Construction Bid |
| 1 | 00183 | R. E. Heidt Construction Co., LLC | $2,826,730.05 |
| 2 | 34356 | Prairie Contractors LLC | $3,303,911.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - R. E. Heidt Construction Co., LLC | - 2 - Prairie Contractors LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 514.3 | LNFT | 14.14 | 7,272.20 | 14.00 | 7,200.20 | | 0002 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 371 | SQYD | 75.75 | 28,103.25 | 28.50 | 10,573.50 | | 0003 | 202-03-38000 | Relocation of Sign | 1 | EACH | 600.00 | 600.00 | 500.00 | 500.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) For foreslope tie-ins and dirt work prep for sodding at LA 14 round-a-bout. | 100 | CUYD | 170.00 | 17,000.00 | 85.00 | 8,500.00 | | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 156.55 | 1,252.40 | 200.00 | 1,600.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 2,415 | LNFT | 2.02 | 4,878.30 | 3.00 | 7,245.00 | | 0007 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 17.3 | CUYD | 240.00 | 4,152.00 | 100.00 | 1,730.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 8,779.1 | TON | 121.00 | 1,062,271.10 | 121.00 | 1,062,271.10 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,233.3 | TON | 170.00 | 209,661.00 | 230.00 | 283,659.00 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 75,243 | SQYD | 2.95 | 221,966.85 | 3.10 | 233,253.30 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -3,178 | CUYD | 0.01 | -31.78 | 0.01 | -31.78 | | 0012 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 1,918 | SQYD | 175.00 | 335,650.00 | 170.00 | 326,060.00 | | 0013 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 1,811.16 | INLF | 1.25 | 2,263.95 | 2.00 | 3,622.32 | | 0014 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 112.5 | LNFT | 34.34 | 3,863.25 | 34.00 | 3,825.00 | | 0015 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 150 | LNFT | 136.35 | 20,452.50 | 135.00 | 20,250.00 | | 0016 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 4,191.50 | 12,574.50 | 4,150.00 | 12,450.00 | | 0017 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 1 | EACH | 3,838.00 | 3,838.00 | 3,800.00 | 3,800.00 | | 0018 | 707-04-00100 | Asphalt Concrete Curb | 54 | LNFT | 175.00 | 9,450.00 | 300.00 | 16,200.00 | | 0019 | 710-01-00100 | Flowable Fill | 7.5 | CUYD | 489.85 | 3,673.88 | 600.00 | 4,500.00 | | 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 100,000.00 | 100,000.00 | | 0021 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 182 | LNFT | 0.31 | 56.42 | 0.01 | 1.82 | | 0022 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 96 | LNFT | 0.51 | 48.96 | 0.01 | 0.96 | | 0023 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.2 | MILE | 550.00 | 6,160.00 | 650.00 | 7,280.00 | | 0024 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.58 | MILE | 808.00 | 6,124.64 | 800.00 | 6,064.00 | | 0025 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 25.186 | MILE | 1,010.00 | 25,437.86 | 1,000.00 | 25,186.00 | | 0026 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 4 | EACH | 50.50 | 202.00 | 0.01 | 0.04 | | 0027 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 4 | EACH | 25.25 | 101.00 | 0.01 | 0.04 | | 0028 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 8 | EACH | 101.00 | 808.00 | 0.01 | 0.08 | | 0029 | 713-11-00100 | Portable Changeable Message Signs | 3 | EACH | 2,525.00 | 7,575.00 | 20,000.00 | 60,000.00 | | 0030 | 714-01-00600 | Slab Sodding (St. Augustine) | 491 | SQYD | 11.32 | 5,558.12 | 10.00 | 4,910.00 | | 0031 | 724-01-00100 | Rumble Strips (Centerline) | 4.276 | MILE | 1,010.00 | 4,318.76 | 1,000.00 | 4,276.00 | | 0032 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.36 | MILE | 1,010.00 | 363.60 | 1,000.00 | 360.00 | | 0033 | 727-01-00100 | Mobilization | 1 | LUMP | 213,000.00 | 213,000.00 | 300,000.00 | 300,000.00 | | 0034 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 136.35 | 545.40 | 135.00 | 540.00 | | 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 791 | EACH | 5.05 | 3,994.55 | 5.00 | 3,955.00 | | 0036 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 91 | LNFT | 3.03 | 275.73 | 3.00 | 273.00 | | 0037 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 48 | LNFT | 14.14 | 678.72 | 14.00 | 672.00 | | 0038 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 1,227 | LNFT | 1.01 | 1,239.27 | 1.00 | 1,227.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.535 | MILE | 5,555.00 | 69,631.93 | 5,500.00 | 68,942.50 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.79 | MILE | 2,878.50 | 10,909.52 | 2,850.00 | 10,801.50 | | 0041 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.025 | MILE | 9,595.00 | 239.88 | 9,500.00 | 237.50 | | 0042 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 277.75 | 555.50 | 275.00 | 550.00 | | 0043 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 959.50 | 3,838.00 | 950.00 | 3,800.00 | | 0044 | 732-05-00100 | Removal of Existing Markings | 0.023 | MILE | 5,555.00 | 127.77 | 5,500.00 | 126.50 | | 0045 | 735-01-00100 | Mailboxes | 31 | EACH | 1.01 | 31.31 | 10.00 | 310.00 | | 0046 | 735-02-00100 | Mailbox Supports (Single) | 27 | EACH | 252.50 | 6,817.50 | 314.00 | 8,478.00 | | 0047 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 353.50 | 707.00 | 314.00 | 628.00 | | 0048 | 739-01-00100 | Hydro-Seeding | 0.07 | ACRE | 867.00 | 60.69 | 60,000.00 | 4,200.00 | | 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,500.00 | 6,500.00 | 14,000.00 | 14,000.00 | | 0050 | NS-502-04200 | Reinforced Paving Mat for Asphalt Concrete Overlay | 65,072.68 | SQYD | 4.80 | 312,348.86 | 4.75 | 309,095.23 | | 0051 | NS-502-04210 | Asphalt Tack Coat | 15,389.44 | GAL | 4.90 | 75,408.26 | 3.95 | 60,788.29 | | 0052 | NS-701-00010 | Culvert Rehabilitation by Slip Lining Existing CMPA | 96 | LNFT | 772.65 | 74,174.40 | 3,125.00 | 300,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,826,730.05 | | 3,303,911.10 |
|