Proposal:H.016295.6
Parish:Winn
Routes:LA 126
Description:LA 126: US 167 TO LA 34
Type Construction:BORROW, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, PAVEMENT WIDENING, REINFORCED PAVING MAT WITH ASPHALT TACK COAT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$6,885,247.57
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | Gilchrist Construction Company, LLC | $5,540,169.17 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $6,299,418.69 |
| 3 | 05789 | D & J CONSTRUCTION CO., LLC | $8,507,680.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Gilchrist Construction Company, LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 449.9 | SQYD | 11.79 | 5,304.32 | 85.00 | 38,241.50 | 15.00 | 6,748.50 | | 0003 | 202-02-04560 | Removal of Bridge Joint (POURED) | 235 | LNFT | 22.00 | 5,170.00 | 10.00 | 2,350.00 | 6.00 | 1,410.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 863.1 | LNFT | 16.00 | 13,809.60 | 14.00 | 12,083.40 | 35.00 | 30,208.50 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,231 | CUYD | 65.00 | 80,015.00 | 20.00 | 24,620.00 | 60.00 | 73,860.00 | | 0006 | 203-10-00100 | Cleaning Existing Ditches | 225 | LNFT | 10.00 | 2,250.00 | 20.00 | 4,500.00 | 30.00 | 6,750.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 16 | EACH | 160.00 | 2,560.00 | 150.00 | 2,400.00 | 250.00 | 4,000.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 1,291 | LNFT | 2.10 | 2,711.10 | 2.00 | 2,582.00 | 7.00 | 9,037.00 | | 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,539 | CUYD | 60.00 | 92,340.00 | 120.00 | 184,680.00 | 95.00 | 146,205.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 15,763.7 | TON | 138.00 | 2,175,390.60 | 155.00 | 2,443,373.50 | 195.00 | 3,073,921.50 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 893.4 | TON | 138.00 | 123,289.20 | 275.00 | 245,685.00 | 250.00 | 223,350.00 | | 0012 | 509-01-00100 | Milling Asphalt Pavement | 70,731 | SQYD | 2.30 | 162,681.30 | 3.50 | 247,558.50 | 5.00 | 353,655.00 | | 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,874 | CUYD | 1.00 | -2,874.00 | 1.00 | -2,874.00 | 1.00 | -2,874.00 | | 0014 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 8,262 | SQYD | 150.00 | 1,239,300.00 | 160.00 | 1,321,920.00 | 215.00 | 1,776,330.00 | | 0015 | 510-02-00100 | Pavement Widening (12" MINIMUM THICKNESS) | 2,763.4 | SQYD | 158.00 | 436,617.20 | 140.00 | 386,876.00 | 240.00 | 663,216.00 | | 0016 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 215,540 | INLF | 0.06 | 12,932.40 | 0.05 | 10,777.00 | 0.25 | 53,885.00 | | 0017 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 115 | LNFT | 47.00 | 5,405.00 | 30.00 | 3,450.00 | 6.00 | 690.00 | | 0018 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 115 | LNFT | 47.00 | 5,405.00 | 20.00 | 2,300.00 | 6.00 | 690.00 | | 0019 | 701-01-02002 | Cross Drain Pipe (24" RCP/RPVCP/CPEPDW or 30" CMP) | 72 | LNFT | 300.00 | 21,600.00 | 300.00 | 21,600.00 | 500.00 | 36,000.00 | | 0020 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 12 | LNFT | 300.00 | 3,600.00 | 300.00 | 3,600.00 | 400.00 | 4,800.00 | | 0021 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 16 | LNFT | 370.00 | 5,920.00 | 365.00 | 5,840.00 | 475.00 | 7,600.00 | | 0022 | 701-15-00100 | Concrete Collar | 4 | EACH | 2,600.00 | 10,400.00 | 2,250.00 | 9,000.00 | 1,600.00 | 6,400.00 | | 0023 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 72 | LNFT | 10.00 | 720.00 | 12.00 | 864.00 | 6.00 | 432.00 | | 0024 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 254 | LNFT | 131.00 | 33,274.00 | 130.00 | 33,020.00 | 185.00 | 46,990.00 | | 0025 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 337.5 | LNFT | 35.00 | 11,812.50 | 34.00 | 11,475.00 | 40.00 | 13,500.00 | | 0026 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 133.00 | 13,300.00 | 132.00 | 13,200.00 | 125.00 | 12,500.00 | | 0027 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 8 | EACH | 4,100.00 | 32,800.00 | 4,000.00 | 32,000.00 | 6,000.00 | 48,000.00 | | 0028 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 47 | SQYD | 180.00 | 8,460.00 | 175.00 | 8,225.00 | 200.00 | 9,400.00 | | 0029 | 711-04-00100 | Geotextile Fabric | 47 | SQYD | 2.00 | 94.00 | 10.00 | 470.00 | 6.00 | 282.00 | | 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 58,000.00 | 58,000.00 | 123,000.00 | 123,000.00 | 250,000.00 | 250,000.00 | | 0031 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 15.984 | MILE | 150.00 | 2,397.60 | 154.00 | 2,461.54 | 300.00 | 4,795.20 | | 0032 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.092 | MILE | 650.00 | 2,659.80 | 650.00 | 2,659.80 | 800.00 | 3,273.60 | | 0033 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 58.545 | MILE | 950.00 | 55,617.75 | 950.00 | 55,617.75 | 900.00 | 52,690.50 | | 0034 | 726-01-00100 | Bedding Material | 22 | CUYD | 200.00 | 4,400.00 | 200.00 | 4,400.00 | 200.00 | 4,400.00 | | 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 305,000.00 | 305,000.00 | 430,000.00 | 430,000.00 | 400,000.00 | 400,000.00 | | 0036 | 729-16-00200 | Object Marker Assembly (Type 2) | 14 | EACH | 116.00 | 1,624.00 | 115.00 | 1,610.00 | 135.00 | 1,890.00 | | 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 131.00 | 1,048.00 | 130.00 | 1,040.00 | 145.00 | 1,160.00 | | 0038 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,227 | EACH | 6.00 | 7,362.00 | 5.00 | 6,135.00 | 8.00 | 9,816.00 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 19.515 | MILE | 5,500.00 | 107,332.50 | 5,500.00 | 107,332.50 | 6,000.00 | 117,090.00 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.364 | MILE | 3,000.00 | 4,092.00 | 2,900.00 | 3,955.60 | 2,000.00 | 2,728.00 | | 0041 | 732-05-00100 | Removal of Existing Markings | 0.027 | MILE | 3,800.00 | 102.60 | 3,700.00 | 99.90 | 25,000.00 | 675.00 | | 0042 | 735-01-00100 | Mailboxes | 25 | EACH | 26.00 | 650.00 | 25.00 | 625.00 | 50.00 | 1,250.00 | | 0043 | 735-02-00100 | Mailbox Supports (Single) | 25 | EACH | 255.00 | 6,375.00 | 250.00 | 6,250.00 | 350.00 | 8,750.00 | | 0044 | 739-01-00100 | Hydro-Seeding | 3.86 | ACRE | 2,900.00 | 11,194.00 | 2,800.00 | 10,808.00 | 4,500.00 | 17,370.00 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 45,000.00 | 45,000.00 | 35,000.00 | 35,000.00 | | 0046 | 815-03-00300 | Joint Seal (Poured) | 235 | LNFT | 50.00 | 11,750.00 | 60.00 | 14,100.00 | 30.00 | 7,050.00 | | 0047 | NS-502-04200 | Reinforced Paving Mat for Asphalt Concrete Overlay | 69,883 | SQYD | 4.90 | 342,426.70 | 4.90 | 342,426.70 | 12.00 | 838,596.00 | | 0048 | NS-502-04210 | Asphalt Tack Coat | 16,770 | GAL | 5.00 | 83,850.00 | 4.00 | 67,080.00 | 8.00 | 134,160.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,540,169.17 | | 6,299,418.69 | | 8,507,680.80 |
|