Proposal:H.016292.6-R1
Parish:Avoyelles
Routes:LA 107
Description:LA 107: MARK ST TO RED RIVER BRIDGE
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, REINFORCED PAVING MAT WITH ASPHALT TACK COAT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$6,412,104.57
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | Gilchrist Construction Company, LLC | $5,390,556.93 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $6,226,293.26 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Gilchrist Construction Company, LLC | - 2 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 140 | SQYD | 55.00 | 7,700.00 | 30.00 | 4,200.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 478 | LNFT | 17.00 | 8,126.00 | 16.50 | 7,887.00 | | 0003 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 80 | SQYD | 70.00 | 5,600.00 | 151.00 | 12,080.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 604 | CUYD | 80.00 | 48,320.00 | 17.00 | 10,268.00 | | 0005 | 302-02-12020 | Class II Base Course (12" Thick) (Crushed Stone) | 506.8 | SQYD | 87.00 | 44,091.60 | 150.00 | 76,020.00 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,553 | CUYD | 50.00 | 127,650.00 | 155.00 | 395,715.00 | | 0007 | 502-01-00100 | Asphalt Concrete | 23,153 | TON | 132.00 | 3,056,196.00 | 138.00 | 3,195,114.00 | | 0008 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,287.5 | TON | 132.00 | 169,950.00 | 138.00 | 177,675.00 | | 0009 | 509-01-00100 | Milling Asphalt Pavement | 104,769 | SQYD | 2.75 | 288,114.75 | 2.75 | 288,114.75 | | 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,354 | CUYD | 1.00 | -4,354.00 | 1.00 | -4,354.00 | | 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,359.5 | SQYD | 160.00 | 217,520.00 | 166.00 | 225,677.00 | | 0012 | 510-03-00100 | Pavement Joint Repair | 6 | TON | 2,500.00 | 15,000.00 | 2,100.00 | 12,600.00 | | 0013 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 3,304 | INLF | 5.00 | 16,520.00 | 2.00 | 6,608.00 | | 0014 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 7 | EACH | 2,000.00 | 14,000.00 | 3,000.00 | 21,000.00 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 200 | LNFT | 36.00 | 7,200.00 | 35.00 | 7,000.00 | | 0016 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 136.00 | 13,600.00 | 135.00 | 13,500.00 | | 0017 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 4,100.00 | 8,200.00 | 4,000.00 | 8,000.00 | | 0018 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 2 | EACH | 3,800.00 | 7,600.00 | 3,750.00 | 7,500.00 | | 0019 | 706-01-00100 | Concrete Walk (4" Thick) | 175 | SQYD | 135.00 | 23,625.00 | 130.00 | 22,750.00 | | 0020 | 706-04-00110 | Curb Ramps (Type 3) | 72.9 | SQYD | 1,600.00 | 116,640.00 | 150.00 | 10,935.00 | | 0021 | 707-01-00100 | Concrete Curb | 27 | LNFT | 150.00 | 4,050.00 | 125.00 | 3,375.00 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | 165,000.00 | 165,000.00 | | 0023 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 368 | LNFT | 1.00 | 368.00 | 1.00 | 368.00 | | 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 21.728 | MILE | 210.00 | 4,562.88 | 154.00 | 3,346.11 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 17.545 | MILE | 600.00 | 10,527.00 | 800.00 | 14,036.00 | | 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 58.575 | MILE | 700.00 | 41,002.50 | 1,000.00 | 58,575.00 | | 0027 | 724-01-00100 | Rumble Strips (Centerline) | 6.176 | MILE | 1,100.00 | 6,793.60 | 1,100.00 | 6,793.60 | | 0028 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 12.352 | MILE | 1,100.00 | 13,587.20 | 1,000.00 | 12,352.00 | | 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | 620,000.00 | 620,000.00 | | 0030 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 141.00 | 564.00 | 140.00 | 560.00 | | 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,152 | EACH | 5.00 | 5,760.00 | 6.00 | 6,912.00 | | 0032 | 732-01-02000 | Plastic Pavement Striping (4" Width) (Thermoplastic 125 mil) | 695 | LNFT | 2.00 | 1,390.00 | 2.00 | 1,390.00 | | 0033 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 368 | LNFT | 13.00 | 4,784.00 | 12.00 | 4,416.00 | | 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 19.56 | MILE | 4,300.00 | 84,108.00 | 6,000.00 | 117,360.00 | | 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.858 | MILE | 1,300.00 | 7,615.40 | 3,100.00 | 18,159.80 | | 0036 | 732-04-08040 | Plastic Pavement Legends and Symbols (Handicap Parking) | 1 | EACH | 310.00 | 310.00 | 1,000.00 | 1,000.00 | | 0037 | 735-01-00100 | Mailboxes | 70 | EACH | 25.00 | 1,750.00 | 25.00 | 1,750.00 | | 0038 | 735-02-00100 | Mailbox Supports (Single) | 68 | EACH | 255.00 | 17,340.00 | 250.00 | 17,000.00 | | 0039 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 330.00 | 330.00 | 325.00 | 325.00 | | 0040 | 739-01-00100 | Hydro-Seeding | 5 | ACRE | 2,600.00 | 13,000.00 | 2,500.00 | 12,500.00 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 35,000.00 | 35,000.00 | | 0042 | 815-03-00300 | Joint Seal (Poured) | 360 | LNFT | 80.00 | 28,800.00 | 75.00 | 27,000.00 | | 0043 | NS-502-04200 | Reinforced Paving Mat for Asphalt Concrete Overlay | 89,938 | SQYD | 5.00 | 449,690.00 | 5.00 | 449,690.00 | | 0044 | NS-502-04210 | Asphalt Tack Coat | 21,585 | GAL | 5.00 | 107,925.00 | 7.00 | 151,095.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,390,556.93 | | 6,226,293.26 |
|