Proposal:H.016155.6
Parish:Orleans
Routes:I-10
Description:I-10 @ US 61 RAMP DRAINAGE
Type Construction:DRAINAGE STRUCTURES, AND RELATED WORK.
Estimated Construction Cost:$168,661.50
| Rank | License | Bidder | Construction Bid |
| 1 | 48896 | Command Construction Industries LLC | $110,000.00 |
| 2 | 06276 | Barriere Construction Co., LLC | $110,000.00 |
| 3 | 24901 | Hard Rock Construction LLC | $128,869.25 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $139,928.40 |
| 5 | 68237 | GULF STATES SERVICES, LLC | $168,692.75 |
| 6 | 36961 | Cycle Construction Co. L.L.C. | $174,949.00 |
| 7 | 74077 | TLP Construction Co. LLC | $271,548.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Command Construction Industries LLC | - 2 - Barriere Construction Co., LLC | - 3 - Hard Rock Construction LLC | - 4 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06140 | Removal of Curbs (Concrete) | 23 | LNFT | 50.00 | 1,150.00 | 22.00 | 506.00 | 28.00 | 644.00 | 80.00 | 1,840.00 | | 0002 | 203-02-00100 | Drainage Excavation | 755 | CUYD | 30.00 | 22,650.00 | 26.00 | 19,630.00 | 32.00 | 24,160.00 | 50.00 | 37,750.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 2 | CUYD | 100.00 | 200.00 | 306.50 | 613.00 | 262.00 | 524.00 | 250.00 | 500.00 | | 0004 | 701-14-00100 | Cleaning Existing Pipes 12" | 150 | LNFT | 10.00 | 1,500.00 | 12.00 | 1,800.00 | 20.00 | 3,000.00 | 11.00 | 1,650.00 | | 0005 | 701-14-00100 | Cleaning Existing Pipes 15" | 386 | LNFT | 10.00 | 3,860.00 | 12.00 | 4,632.00 | 21.50 | 8,299.00 | 11.00 | 4,246.00 | | 0006 | 701-14-00100 | Cleaning Existing Pipes 24" | 104 | LNFT | 10.00 | 1,040.00 | 17.00 | 1,768.00 | 28.00 | 2,912.00 | 11.00 | 1,144.00 | | 0007 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 3,500.00 | 10,500.00 | 4,000.00 | 12,000.00 | 3,100.00 | 9,300.00 | 4,300.00 | 12,900.00 | | 0008 | 702-09-00100 | Cleaning Existing Catch Basin | 8 | EACH | 250.00 | 2,000.00 | 400.00 | 3,200.00 | 330.00 | 2,640.00 | 225.00 | 1,800.00 | | 0009 | 702-10-00100 | Paved Gutter Drain (Single) | 5 | EACH | 3,500.00 | 17,500.00 | 5,000.00 | 25,000.00 | 3,000.00 | 15,000.00 | 4,700.00 | 23,500.00 | | 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 12,000.00 | 12,000.00 | 22,000.00 | 22,000.00 | 18,800.00 | 18,800.00 | | 0011 | 716-01-00100 | Mulch (Vegetative) | 1.5 | TON | 3,000.00 | 4,500.00 | 2,650.00 | 3,975.00 | 2,800.00 | 4,200.00 | 3,000.00 | 4,500.00 | | 0012 | 720-01-01020 | Erosion Control System (Slope Protection) (Type B) | 3,713 | SQYD | 1.00 | 3,713.00 | 2.00 | 7,426.00 | 1.75 | 6,497.75 | 1.80 | 6,683.40 | | 0013 | 726-01-00100 | Bedding Material | 9.5 | CUYD | 110.00 | 1,045.00 | 100.00 | 950.00 | 115.00 | 1,092.50 | 170.00 | 1,615.00 | | 0014 | 727-01-00100 | Mobilization | 1 | LUMP | 10,342.00 | 10,342.00 | 15,000.00 | 15,000.00 | 21,000.00 | 21,000.00 | 13,600.00 | 13,600.00 | | 0015 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 1,500.00 | 1,500.00 | 7,600.00 | 7,600.00 | 9,400.00 | 9,400.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 110,000.00 | | 110,000.00 | | 128,869.25 | | 139,928.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - GULF STATES SERVICES, LLC | - 6 - Cycle Construction Co. L.L.C. | - 7 - TLP Construction Co. LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06140 | Removal of Curbs (Concrete) | 23 | LNFT | 75.00 | 1,725.00 | 20.00 | 460.00 | 60.00 | 1,380.00 | | 0002 | 203-02-00100 | Drainage Excavation | 755 | CUYD | 45.00 | 33,975.00 | 38.00 | 28,690.00 | 120.00 | 90,600.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 2 | CUYD | 100.00 | 200.00 | 50.00 | 100.00 | 750.00 | 1,500.00 | | 0004 | 701-14-00100 | Cleaning Existing Pipes 12" | 150 | LNFT | 45.00 | 6,750.00 | 19.00 | 2,850.00 | 55.00 | 8,250.00 | | 0005 | 701-14-00100 | Cleaning Existing Pipes 15" | 386 | LNFT | 45.00 | 17,370.00 | 20.00 | 7,720.00 | 55.00 | 21,230.00 | | 0006 | 701-14-00100 | Cleaning Existing Pipes 24" | 104 | LNFT | 45.00 | 4,680.00 | 22.00 | 2,288.00 | 55.00 | 5,720.00 | | 0007 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 4,000.00 | 12,000.00 | 2,400.00 | 7,200.00 | 4,000.00 | 12,000.00 | | 0008 | 702-09-00100 | Cleaning Existing Catch Basin | 8 | EACH | 800.00 | 6,400.00 | 250.00 | 2,000.00 | 1,000.00 | 8,000.00 | | 0009 | 702-10-00100 | Paved Gutter Drain (Single) | 5 | EACH | 6,400.00 | 32,000.00 | 5,200.00 | 26,000.00 | 8,500.00 | 42,500.00 | | 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 21,000.00 | 21,000.00 | 25,000.00 | 25,000.00 | | 0011 | 716-01-00100 | Mulch (Vegetative) | 1.5 | TON | 2,700.00 | 4,050.00 | 3,100.00 | 4,650.00 | 3,300.00 | 4,950.00 | | 0012 | 720-01-01020 | Erosion Control System (Slope Protection) (Type B) | 3,713 | SQYD | 1.75 | 6,497.75 | 2.00 | 7,426.00 | 2.00 | 7,426.00 | | 0013 | 726-01-00100 | Bedding Material | 9.5 | CUYD | 110.00 | 1,045.00 | 270.00 | 2,565.00 | 315.00 | 2,992.50 | | 0014 | 727-01-00100 | Mobilization | 1 | LUMP | 22,000.00 | 22,000.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | | 0015 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 168,692.75 | | 174,949.00 | | 271,548.50 |
|