Proposal:H.015859.6
Parish:Rapides
Routes:LA 1208-1
Description:LA 1208-1 SIDEWALK IMPROVEMENTS
Type Construction:BORROW, DRAINAGE STRUCTURES, CONCRETE WALKS AND CURB RAMPS, AND RELATED WORK.
Estimated Construction Cost:$1,964,230.50
| Rank | License | Bidder | Construction Bid |
| 1 | 55950 | Brown Industrial Construction, LLC | $1,972,545.00 |
| 2 | 70414 | Ti-Zack Concrete, LLC | $2,166,236.80 |
| 3 | 27239 | Apeck Construction, LLC | $2,312,108.43 |
| 4 | 52306 | SIEMA CONSTRUCTION, LLC | $3,018,910.56 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Brown Industrial Construction, LLC | - 2 - Ti-Zack Concrete, LLC | - 3 - Apeck Construction, LLC | - 4 - SIEMA CONSTRUCTION, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 117,300.00 | 117,300.00 | 6,785.89 | 6,785.89 | 105,000.00 | 105,000.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 9,728 | SQYD | 12.50 | 121,600.00 | 24.61 | 239,406.08 | 34.68 | 337,367.04 | 16.50 | 160,512.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 788.6 | LNFT | 12.50 | 9,857.50 | 8.92 | 7,034.31 | 31.83 | 25,101.14 | 22.00 | 17,349.20 | | 0004 | 202-02-14500 | Removal of Guard Rail | 300 | LNFT | 35.00 | 10,500.00 | 27.50 | 8,250.00 | 12.18 | 3,654.00 | 23.50 | 7,050.00 | | 0005 | 203-01-00100 | General Excavation | 31 | CUYD | 100.00 | 3,100.00 | 97.32 | 3,016.92 | 70.38 | 2,181.78 | 30.00 | 930.00 | | 0006 | 203-08-00100 | Geotextile Fabric | 53 | SQYD | 5.00 | 265.00 | 11.24 | 595.72 | 15.11 | 800.83 | 13.00 | 689.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 17,748 | LNFT | 3.00 | 53,244.00 | 2.20 | 39,045.60 | 3.04 | 53,953.92 | 2.22 | 39,400.56 | | 0008 | 502-03-00200 | Asphalt Concrete (4" Thick) | 12 | SQYD | 425.00 | 5,100.00 | 122.10 | 1,465.20 | 561.62 | 6,739.44 | 300.00 | 3,600.00 | | 0009 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 48 | INLF | 12.00 | 576.00 | 11.00 | 528.00 | 27.29 | 1,309.92 | 135.00 | 6,480.00 | | 0010 | 702-02-00001 | Manhole (Remove and Replace Frame and Cover) | 7 | EACH | 3,000.00 | 21,000.00 | 1,140.00 | 7,980.00 | 895.39 | 6,267.73 | 5,000.00 | 35,000.00 | | 0011 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 5,100.00 | 5,100.00 | 798.00 | 798.00 | 5,325.88 | 5,325.88 | 5,000.00 | 5,000.00 | | 0012 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 13 | EACH | 2,200.00 | 28,600.00 | 613.85 | 7,980.05 | 298.46 | 3,879.98 | 3,500.00 | 45,500.00 | | 0013 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 6,500.00 | 6,500.00 | 798.00 | 798.00 | 5,325.88 | 5,325.88 | 5,000.00 | 5,000.00 | | 0016 | 706-01-00100 | Concrete Walk (4" Thick) | 6,857.5 | SQYD | 85.00 | 582,887.50 | 88.20 | 604,831.50 | 109.99 | 754,256.43 | 120.00 | 822,900.00 | | 0017 | 706-02-00200 | Concrete Drive (6" Thick) | 3,782.4 | SQYD | 95.00 | 359,328.00 | 112.34 | 424,914.82 | 134.04 | 506,992.90 | 130.00 | 491,712.00 | | 0018 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 487.1 | SQYD | 95.00 | 46,274.50 | 125.95 | 61,350.25 | 134.04 | 65,290.88 | 133.00 | 64,784.30 | | 0019 | 706-04-00110 | Curb Ramps Type 7 | 598.5 | SQYD | 135.00 | 80,797.50 | 125.95 | 75,381.08 | 134.04 | 80,222.94 | 540.00 | 323,190.00 | | 0020 | 707-01-00100 | Concrete Curb | 638.7 | LNFT | 50.00 | 31,935.00 | 61.77 | 39,452.50 | 68.28 | 43,610.44 | 55.00 | 35,128.50 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 121,500.00 | 121,500.00 | 44,000.00 | 44,000.00 | 44,649.89 | 44,649.89 | 200,000.00 | 200,000.00 | | 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 195,000.00 | 195,000.00 | 134,010.77 | 134,010.77 | 92,376.22 | 92,376.22 | 290,000.00 | 290,000.00 | | 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 24,750.00 | 24,750.00 | 6,830.25 | 6,830.25 | 44,850.00 | 44,850.00 | | 0025 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 660 | SQFT | 2.00 | 1,320.00 | 11.00 | 7,260.00 | 17.00 | 11,220.00 | 12.00 | 7,920.00 | | 0026 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 660 | SQFT | 1.00 | 660.00 | 11.00 | 7,260.00 | 17.00 | 11,220.00 | 8.00 | 5,280.00 | | 0027 | 806-01-00100 | Deformed Reinforcing Steel | 2,420 | LB | 3.00 | 7,260.00 | 5.50 | 13,310.00 | 1.41 | 3,412.20 | 2.25 | 5,445.00 | | 0028 | 810-04-00100 | Hand Railing | 780 | LNFT | 180.00 | 140,400.00 | 247.50 | 193,050.00 | 171.89 | 134,074.20 | 193.00 | 150,540.00 | | 0030 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 2 | EACH | 12,000.00 | 24,000.00 | 27,500.00 | 55,000.00 | 11,938.47 | 23,876.94 | 13,650.00 | 27,300.00 | | 0031 | 805-01-00900 | Class A1 Concrete (ENDWALL AND ANCHORED SLAB) | 23.36 | CUYD | 2,750.00 | 64,240.00 | 1,925.00 | 44,968.00 | 3,175.85 | 74,187.86 | 5,000.00 | 116,800.00 | | 0033 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 5 | SFIN | 1,300.00 | 6,500.00 | 500.00 | 2,500.00 | 238.77 | 1,193.85 | 310.00 | 1,550.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,972,545.00 | | 2,166,236.80 | | 2,312,108.43 | | 3,018,910.56 |
|