Proposal:H.015247.6
Parish:Ouachita
Routes:LA 840-6, US 165-Y
Description:US 165-BUSINESS & LA 840-6: REPAIRS
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,790,307.88
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $4,026,436.81 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $4,410,757.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 68 | SQYD | 300.00 | 20,400.00 | 25.00 | 1,700.00 | | 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 284 | LNFT | 28.00 | 7,952.00 | 30.00 | 8,520.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 177.4 | LNFT | 14.00 | 2,483.60 | 40.00 | 7,096.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 100 | CUYD | 25.00 | 2,500.00 | 75.00 | 7,500.00 | | 0005 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 155 | SQYD | 40.00 | 6,200.00 | 200.00 | 31,000.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 4,156.7 | TON | 300.00 | 1,247,010.00 | 325.00 | 1,350,927.50 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 143 | TON | 670.00 | 95,810.00 | 450.00 | 64,350.00 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 36,695 | SQYD | 11.50 | 421,992.50 | 12.00 | 440,340.00 | | 0009 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 1,688 | SQYD | 305.00 | 514,840.00 | 450.00 | 759,600.00 | | 0010 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 4,705 | LNFT | 7.50 | 35,287.50 | 8.00 | 37,640.00 | | 0011 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 4,069 | LNFT | 8.50 | 34,586.50 | 9.00 | 36,621.00 | | 0012 | 602-05-01160 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (9" Thick) | 190 | SQYD | 357.00 | 67,830.00 | 425.00 | 80,750.00 | | 0013 | 602-05-02160 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (9" Thick) | 482 | SQYD | 343.00 | 165,326.00 | 400.00 | 192,800.00 | | 0014 | 602-05-03160 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (9" Thick) | 112 | SQYD | 314.00 | 35,168.00 | 375.00 | 42,000.00 | | 0015 | 702-04-00100 | Adjusting Manholes | 25 | EACH | 3,300.00 | 82,500.00 | 3,500.00 | 87,500.00 | | 0016 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 9,692.00 | 9,692.00 | 10,000.00 | 10,000.00 | | 0017 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 25 | LNFT | 95.00 | 2,375.00 | 145.00 | 3,625.00 | | 0018 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 137.00 | 6,850.00 | 200.00 | 10,000.00 | | 0019 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 4,200.00 | 8,400.00 | 6,000.00 | 12,000.00 | | 0020 | 706-04-00110 | Curb Ramps TYPE 1 | 38.4 | SQYD | 315.00 | 12,096.00 | 375.00 | 14,400.00 | | 0021 | 706-04-00110 | Curb Ramps TYPE 2 | 41.6 | SQYD | 343.00 | 14,268.80 | 400.00 | 16,640.00 | | 0022 | 706-04-00110 | Curb Ramps TYPE 7 | 598.5 | SQYD | 224.00 | 134,064.00 | 325.00 | 194,512.50 | | 0023 | 706-04-00110 | Curb Ramps TYPE 8 | 62 | SQYD | 299.00 | 18,538.00 | 350.00 | 21,700.00 | | 0024 | 707-01-00100 | Concrete Curb | 284 | LNFT | 45.00 | 12,780.00 | 50.00 | 14,200.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 348,000.00 | 348,000.00 | 200,000.00 | 200,000.00 | | 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.516 | MILE | 154.00 | 1,465.46 | 300.00 | 2,854.80 | | 0027 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.104 | MILE | 600.00 | 4,262.40 | 800.00 | 5,683.20 | | 0028 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 12.136 | MILE | 900.00 | 10,922.40 | 900.00 | 10,922.40 | | 0029 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 42 | EACH | 15.00 | 630.00 | 50.00 | 2,100.00 | | 0030 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 6 | EACH | 15.00 | 90.00 | 50.00 | 300.00 | | 0031 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 20 | EACH | 15.00 | 300.00 | 150.00 | 3,000.00 | | 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 400,000.00 | 400,000.00 | 400,000.00 | 400,000.00 | | 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 140.00 | 280.00 | 125.00 | 250.00 | | 0034 | 731-02-00100 | Reflectorized Raised Pavement Markers | 697 | EACH | 5.00 | 3,485.00 | 8.00 | 5,576.00 | | 0035 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 964 | LNFT | 4.00 | 3,856.00 | 10.00 | 9,640.00 | | 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 351 | LNFT | 16.00 | 5,616.00 | 25.00 | 8,775.00 | | 0037 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.864 | MILE | 4,500.00 | 26,388.00 | 7,000.00 | 41,048.00 | | 0038 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.324 | MILE | 1,200.00 | 2,788.80 | 3,000.00 | 6,972.00 | | 0039 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 1.126 | MILE | 10,600.00 | 11,935.60 | 12,000.00 | 13,512.00 | | 0040 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 20 | EACH | 350.00 | 7,000.00 | 600.00 | 12,000.00 | | 0041 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 350.00 | 1,050.00 | 800.00 | 2,400.00 | | 0042 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 9 | EACH | 450.00 | 4,050.00 | 600.00 | 5,400.00 | | 0043 | 732-05-00100 | Removal of Existing Markings | 1.126 | MILE | 16,000.00 | 18,016.00 | 15,000.00 | 16,890.00 | | 0044 | 739-01-00100 | Hydro-Seeding | 0.18 | ACRE | 18,000.00 | 3,240.00 | 12,000.00 | 2,160.00 | | 0045 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | 25,000.00 | 25,000.00 | | 0046 | 741-35-00100 | Adjust Valve or Meter Box | 7 | EACH | 3,500.00 | 24,500.00 | 1,600.00 | 11,200.00 | | 0047 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 3,621 | SQYD | 7.25 | 26,252.25 | 20.00 | 72,420.00 | | 0048 | NS-502-04200 | Reinforced Paving Mat for Asphalt Concrete Overlay | 7,206 | SQYD | 6.50 | 46,839.00 | 12.00 | 86,472.00 | | 0049 | NS-502-04210 | Asphalt Tack Coat | 1,730 | GAL | 24.00 | 41,520.00 | 12.00 | 20,760.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,026,436.81 | | 4,410,757.40 |
|