Proposal:H.014889.6
Parish:Beauregard
Routes:US 171
Description:US 171: WEST DR - VERNON P/L
Type Construction:CLEARING AND GRUBBING, GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$1,721,205.04
| Rank | License | Bidder | Construction Bid |
| 1 | 27239 | Apeck Construction, LLC | $2,031,426.66 |
| 2 | 30774 | Progressive Construction Co., LLC | $2,305,975.85 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Apeck Construction, LLC | - 2 - Progressive Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.1 | LUMP | 54,000.00 | 54,000.00 | 40,000.00 | 40,000.00 | | 0002 | 202-02-02000 | Removal of Asphalt Drives | 137.11 | SQYD | 68.00 | 9,323.48 | 20.00 | 2,742.20 | | 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 6,200.00 | 6,200.00 | 2,400.00 | 2,400.00 | | 0004 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 3,008 | LNFT | 14.50 | 43,616.00 | 40.00 | 120,320.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 195 | LNFT | 27.00 | 5,265.00 | 12.00 | 2,340.00 | | 0006 | 203-03-00100 | Embankment | 492.1 | CUYD | 48.00 | 23,620.80 | 50.00 | 24,605.00 | | 0007 | 203-08-00100 | Geotextile Fabric | 289.2 | SQYD | 2.50 | 723.00 | 4.50 | 1,301.40 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 185 | LNFT | 6.00 | 1,110.00 | 35.00 | 6,475.00 | | 0009 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 460.5 | CUYD | 100.00 | 46,050.00 | 200.00 | 92,100.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 284.3 | TON | 208.00 | 59,134.40 | 380.00 | 108,034.00 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 170.6 | TON | 244.00 | 41,626.40 | 400.00 | 68,240.00 | | 0012 | 509-01-00100 | Milling Asphalt Pavement | 3,311 | SQYD | 4.00 | 13,244.00 | 8.00 | 26,488.00 | | 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -88 | CUYD | 0.01 | -0.88 | 1.00 | -88.00 | | 0014 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 40 | SQYD | 350.00 | 14,000.00 | 533.00 | 21,320.00 | | 0015 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 35,214 | INLF | 1.50 | 52,821.00 | 3.00 | 105,642.00 | | 0016 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 13,494 | LNFT | 4.50 | 60,723.00 | 6.00 | 80,964.00 | | 0017 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 20,792 | LNFT | 4.50 | 93,564.00 | 6.00 | 124,752.00 | | 0018 | 602-03-00100 | Cleaning and Sealing Random Cracks | 7,952 | LNFT | 8.00 | 63,616.00 | 9.00 | 71,568.00 | | 0019 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 280 | SQYD | 768.00 | 215,040.00 | 370.00 | 103,600.00 | | 0020 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 364 | SQYD | 533.00 | 194,012.00 | 320.00 | 116,480.00 | | 0021 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 760 | SQYD | 450.00 | 342,000.00 | 250.00 | 190,000.00 | | 0022 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 105.8 | LNFT | 6.00 | 634.80 | 100.00 | 10,580.00 | | 0023 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 2 | EACH | 6,500.00 | 13,000.00 | 6,500.00 | 13,000.00 | | 0024 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 17,000.00 | 17,000.00 | 9,500.00 | 9,500.00 | | 0025 | 702-03-00600 | Catch Basins (CB-07) | 2 | EACH | 16,000.00 | 32,000.00 | 9,500.00 | 19,000.00 | | 0026 | 702-04-00200 | Adjusting Catch Basins | 9 | EACH | 6,500.00 | 58,500.00 | 8,000.00 | 72,000.00 | | 0027 | 702-07-00200 | Cross Drain Safety End (Type 2) | 1 | EACH | 14,500.00 | 14,500.00 | 32,000.00 | 32,000.00 | | 0028 | 707-03-00100 | Combination Concrete Curb and Gutter | 3,255 | LNFT | 69.50 | 226,222.50 | 90.00 | 292,950.00 | | 0029 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 289.2 | SQYD | 71.00 | 20,533.20 | 107.00 | 30,944.40 | | 0030 | 711-03-00600 | Riprap (250 lb) | 4 | TON | 750.00 | 3,000.00 | 1,254.00 | 5,016.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 67,000.00 | 67,000.00 | 100,000.00 | 100,000.00 | | 0032 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 318 | LNFT | 0.30 | 95.40 | 0.30 | 95.40 | | 0033 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 760 | LNFT | 0.60 | 456.00 | 0.60 | 456.00 | | 0034 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 342 | LNFT | 0.60 | 205.20 | 0.60 | 205.20 | | 0035 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2.06 | MILE | 2,800.00 | 5,768.00 | 2,667.00 | 5,494.02 | | 0036 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 8.24 | MILE | 700.00 | 5,768.00 | 1,200.00 | 9,888.00 | | 0037 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.232 | MILE | 1,000.00 | 8,232.00 | 1,200.00 | 9,878.40 | | 0038 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 34 | EACH | 12.00 | 408.00 | 13.50 | 459.00 | | 0039 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 6 | EACH | 18.00 | 108.00 | 20.00 | 120.00 | | 0040 | 726-01-00100 | Bedding Material | 7.1 | CUYD | 185.00 | 1,313.50 | 187.00 | 1,327.70 | | 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 101,000.00 | 101,000.00 | 210,000.00 | 210,000.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,371 | EACH | 6.00 | 8,226.00 | 6.70 | 9,185.70 | | 0043 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 318 | LNFT | 3.50 | 1,113.00 | 4.00 | 1,272.00 | | 0044 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 760 | LNFT | 14.00 | 10,640.00 | 16.00 | 12,160.00 | | 0045 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 162 | LNFT | 16.00 | 2,592.00 | 17.40 | 2,818.80 | | 0046 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 180 | LNFT | 18.00 | 3,240.00 | 20.00 | 3,600.00 | | 0047 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 2,085 | LNFT | 1.25 | 2,606.25 | 1.40 | 2,919.00 | | 0048 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.232 | MILE | 66.00 | 543.31 | 73.40 | 604.23 | | 0049 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.08 | MILE | 11,500.00 | 920.00 | 12,000.00 | 960.00 | | 0050 | 732-03-02102 | Plastic Pav't Striping (Broken) (4" W) (Preformed Tape Retroreflectivity I or Thermo 90 mil)(Black and White Contrast) To meet current PM-01 standards | 8.24 | MILE | 3,800.00 | 31,312.00 | 4,000.00 | 32,960.00 | | 0051 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 34 | EACH | 300.00 | 10,200.00 | 300.00 | 10,200.00 | | 0052 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 6 | EACH | 1,200.00 | 7,200.00 | 1,200.00 | 7,200.00 | | 0053 | 732-05-00100 | Removal of Existing Markings | 2.081 | MILE | 7,900.00 | 16,439.90 | 8,000.00 | 16,648.00 | | 0054 | 739-01-00100 | Hydro-Seeding | 0.1 | ACRE | 4,800.00 | 480.00 | 33,000.00 | 3,300.00 | | 0055 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 35,000.00 | 35,000.00 | | 0056 | 805-01-00500 | Class A1 Concrete (Footing) | 7.048 | CUYD | 1,175.00 | 8,281.40 | 4,800.00 | 33,830.40 | | 0057 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement AS REQUIRED FOR ASPHALT OVER CONCRETE PAVEMENT PATCH LOCATION | 160 | INLF | 1.25 | 200.00 | 7.00 | 1,120.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,031,426.66 | | 2,305,975.85 |
|