Proposal:H.014880.6
Parish:Winn
Routes:US 167
Description:US 167: SOUTH OF DODSON - JACKSON P/L
Type Construction:MILLING ASPHALT CONCRETE, MILLING CONCRETE PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$7,740,233.80
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | Gilchrist Construction Company, LLC | $9,425,450.31 |
| 2 | 30774 | Progressive Construction Co., LLC | $9,680,318.85 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $10,893,106.56 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Gilchrist Construction Company, LLC | - 2 - Progressive Construction Co., LLC | - 3 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-14500 | Removal of Guard Rail | 888 | LNFT | 15.00 | 13,320.00 | 16.50 | 14,652.00 | 12.00 | 10,656.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 339 | CUYD | 75.00 | 25,425.00 | 115.00 | 38,985.00 | 200.00 | 67,800.00 | | 0003 | 502-01-00100 | Asphalt Concrete | 14,670.8 | TON | 170.00 | 2,494,036.00 | 200.00 | 2,934,160.00 | 185.00 | 2,714,098.00 | | 0004 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 77.7 | TON | 434.00 | 33,721.80 | 510.50 | 39,665.85 | 500.00 | 38,850.00 | | 0005 | 509-01-00100 | Milling Asphalt Pavement | 52,828 | SQYD | 4.57 | 241,423.96 | 5.40 | 285,271.20 | 4.00 | 211,312.00 | | 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,400 | CUYD | 1.00 | -2,400.00 | 0.01 | -24.00 | 0.01 | -24.00 | | 0007 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 1,342 | SQYD | 127.00 | 170,434.00 | 149.50 | 200,629.00 | 120.00 | 161,040.00 | | 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,903 | SQYD | 164.00 | 312,092.00 | 193.00 | 367,279.00 | 190.00 | 361,570.00 | | 0009 | 511-02-00100 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 3,482 | LNFT | 4.10 | 14,276.20 | 3.50 | 12,187.00 | 2.00 | 6,964.00 | | 0010 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 4,632 | LNFT | 4.10 | 18,991.20 | 3.50 | 16,212.00 | 2.00 | 9,264.00 | | 0011 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 4,736 | LNFT | 2.00 | 9,472.00 | 1.50 | 7,104.00 | 1.00 | 4,736.00 | | 0012 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 1,845 | LNFT | 6.00 | 11,070.00 | 5.50 | 10,147.50 | 4.00 | 7,380.00 | | 0013 | 602-03-00100 | Cleaning and Sealing Random Cracks | 21,848 | LNFT | 8.50 | 185,708.00 | 8.00 | 174,784.00 | 7.00 | 152,936.00 | | 0014 | 602-05-01140 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8-1/2" Thick) | 659 | SQYD | 360.00 | 237,240.00 | 330.00 | 217,470.00 | 500.00 | 329,500.00 | | 0015 | 602-05-02140 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8-1/2" Thick) | 755 | SQYD | 230.00 | 173,650.00 | 215.00 | 162,325.00 | 400.00 | 302,000.00 | | 0016 | 602-05-03140 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8-1/2" Thick) | 14,972 | SQYD | 205.00 | 3,069,260.00 | 190.00 | 2,844,680.00 | 250.00 | 3,743,000.00 | | 0017 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 825 | LNFT | 36.00 | 29,700.00 | 42.00 | 34,650.00 | 33.00 | 27,225.00 | | 0018 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 49.5 | LNFT | 143.00 | 7,078.50 | 173.00 | 8,563.50 | 170.00 | 8,415.00 | | 0019 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,200.00 | 16,800.00 | 5,061.00 | 20,244.00 | 3,400.00 | 13,600.00 | | 0020 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 1 | EACH | 3,800.00 | 3,800.00 | 4,573.00 | 4,573.00 | 3,050.00 | 3,050.00 | | 0021 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 55 | SQYD | 200.00 | 11,000.00 | 180.00 | 9,900.00 | 300.00 | 16,500.00 | | 0022 | 707-01-00100 | Concrete Curb | 1,560 | LNFT | 40.00 | 62,400.00 | 36.00 | 56,160.00 | 17.00 | 26,520.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 500,000.00 | 500,000.00 | 250,000.00 | 250,000.00 | 692,000.00 | 692,000.00 | | 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 30.018 | MILE | 225.00 | 6,754.05 | 2,000.00 | 60,036.00 | 430.00 | 12,907.74 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 29.925 | MILE | 500.00 | 14,962.50 | 600.00 | 17,955.00 | 500.00 | 14,962.50 | | 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 40.03 | MILE | 850.00 | 34,025.50 | 1,000.00 | 40,030.00 | 850.00 | 34,025.50 | | 0027 | 716-01-00100 | Mulch (Vegetative) | 4.3 | TON | 1,000.00 | 4,300.00 | 1,580.00 | 6,794.00 | 1,200.00 | 5,160.00 | | 0028 | 717-01-00100 | Seeding | 127 | LB | 26.00 | 3,302.00 | 13.00 | 1,651.00 | 20.00 | 2,540.00 | | 0029 | 718-01-00100 | Fertilizer | 2,118 | LB | 0.80 | 1,694.40 | 1.20 | 2,541.60 | 1.00 | 2,118.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 900,000.00 | 900,000.00 | 920,000.00 | 920,000.00 | 1,090,000.00 | 1,090,000.00 | | 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 10 | EACH | 140.00 | 1,400.00 | 160.00 | 1,600.00 | 85.00 | 850.00 | | 0032 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,000 | EACH | 5.00 | 10,000.00 | 5.80 | 11,600.00 | 5.00 | 10,000.00 | | 0033 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 100 | LNFT | 12.00 | 1,200.00 | 13.00 | 1,300.00 | 11.00 | 1,100.00 | | 0034 | 732-01-03040 | Plastic Pavement Striping (8" Width) (Preformed Tape) (DOTD Intersection Grade) | 150 | LNFT | 13.00 | 1,950.00 | 13.00 | 1,950.00 | 12.00 | 1,800.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.86 | MILE | 5,600.00 | 38,416.00 | 6,500.00 | 44,590.00 | 5,500.00 | 37,730.00 | | 0036 | 732-02-03000 | Plastic Pavement Striping (Solid Line) (4" Width) (Preformed Tape) (Retroreflectivity Level I) | 18.292 | MILE | 17,200.00 | 314,622.40 | 20,000.00 | 365,840.00 | 17,000.00 | 310,964.00 | | 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.43 | MILE | 2,900.00 | 9,947.00 | 3,200.00 | 10,976.00 | 2,850.00 | 9,775.50 | | 0038 | 732-03-03000 | Plastic Pavement Striping (Broken Line) (4" Width) (Preformed Tape) (Retroreflectivity Level I) | 2.454 | MILE | 4,700.00 | 11,533.80 | 5,300.00 | 13,006.20 | 5,000.00 | 12,270.00 | | 0039 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 9.146 | MILE | 10,000.00 | 91,460.00 | 11,500.00 | 105,179.00 | 9,000.00 | 82,314.00 | | 0040 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 18 | EACH | 260.00 | 4,680.00 | 290.00 | 5,220.00 | 250.00 | 4,500.00 | | 0041 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 260.00 | 780.00 | 290.00 | 870.00 | 250.00 | 750.00 | | 0042 | 732-05-00100 | Removal of Existing Markings | 6.5 | MILE | 9,000.00 | 58,500.00 | 10,000.00 | 65,000.00 | 8,500.00 | 55,250.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 42,800.00 | 42,800.00 | 47,500.00 | 47,500.00 | 25,000.00 | 25,000.00 | | 0044 | NS-602-00001 | Milling Concrete Pavement | 7,386 | SQYD | 14.00 | 103,404.00 | 17.00 | 125,562.00 | 13.62 | 100,597.32 | | 0045 | NS-602-00011 | Expansion Joint Rehabilitation | 243 | LNFT | 540.00 | 131,220.00 | 500.00 | 121,500.00 | 700.00 | 170,100.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,425,450.31 | | 9,680,318.85 | | 10,893,106.56 |
|