Proposal:H.010441.6
Parish:St. Tammany
Routes:LA 1077
Description:LA 1077: GRADE RAISING
Type Construction:MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, DRAINAGE STRUCTURES, ASPHALT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$788,067.99
| Rank | License | Bidder | Construction Bid |
| 1 | 73475 | Madden Gulf Coast, LLC | $686,947.05 |
| 2 | 06276 | Barriere Construction Co., LLC | $743,048.90 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $766,603.00 |
| 4 | 76669 | Alonso LLC | $875,497.75 |
| 5 | 12031 | R.J. Daigle & Sons Contractors, Inc | $891,738.58 |
| 6 | 02179 | Boh Bros. Construction Co., LLC. | $1,417,384.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Gulf Coast, LLC | - 2 - Barriere Construction Co., LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - Alonso LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 1,100.00 | 1,100.00 | 4,000.00 | 4,000.00 | 10,000.00 | 10,000.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 150 | CUYD | 85.00 | 12,750.00 | 20.00 | 3,000.00 | 85.00 | 12,750.00 | 100.00 | 15,000.00 | | 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 180 | CUYD | 90.00 | 16,200.00 | 70.00 | 12,600.00 | 90.00 | 16,200.00 | 140.00 | 25,200.00 | | 0004 | 502-01-00100 | Asphalt Concrete | 4,457.4 | TON | 101.00 | 450,197.40 | 122.00 | 543,802.80 | 127.00 | 566,089.80 | 135.00 | 601,749.00 | | 0005 | 509-01-00100 | Milling Asphalt Pavement | 3,600 | SQYD | 3.30 | 11,880.00 | 5.50 | 19,800.00 | 3.25 | 11,700.00 | 10.00 | 36,000.00 | | 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -300 | CUYD | 0.01 | -3.00 | 0.01 | -3.00 | 0.00 | 0.00 | 0.01 | -3.00 | | 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 28.8 | SQYD | 150.00 | 4,320.00 | 200.00 | 5,760.00 | 225.00 | 6,480.00 | 250.00 | 7,200.00 | | 0008 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 60 | LNFT | 500.00 | 30,000.00 | 450.00 | 27,000.00 | 450.00 | 27,000.00 | 375.00 | 22,500.00 | | 0009 | 706-02-00200 | Concrete Drive (6" Thick) | 173.8 | SQYD | 140.00 | 24,332.00 | 115.00 | 19,987.00 | 110.00 | 19,118.00 | 130.00 | 22,594.00 | | 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 16,500.00 | 16,500.00 | 23,000.00 | 23,000.00 | 25,000.00 | 25,000.00 | | 0011 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 7.377 | MILE | 1,200.00 | 8,852.40 | 1,300.00 | 9,590.10 | 1,000.00 | 7,377.00 | 1,250.00 | 9,221.25 | | 0012 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 500.00 | 1,000.00 | 4,200.00 | 8,400.00 | 1,500.00 | 3,000.00 | 2,200.00 | 4,400.00 | | 0013 | 726-01-00100 | Bedding Material | 8 | CUYD | 230.00 | 1,840.00 | 130.00 | 1,040.00 | 175.00 | 1,400.00 | 140.00 | 1,120.00 | | 0014 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 48,000.00 | 48,000.00 | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 | | 0015 | 731-02-00100 | Reflectorized Raised Pavement Markers | 328 | EACH | 6.50 | 2,132.00 | 7.00 | 2,296.00 | 7.00 | 2,296.00 | 8.00 | 2,624.00 | | 0016 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.919 | MILE | 3,750.00 | 18,446.25 | 4,000.00 | 19,676.00 | 3,800.00 | 18,692.20 | 7,500.00 | 36,892.50 | | 0017 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 4,500.00 | 4,500.00 | 2,500.00 | 2,500.00 | 6,000.00 | 6,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 686,947.05 | | 743,048.90 | | 766,603.00 | | 875,497.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - R.J. Daigle & Sons Contractors, Inc | - 6 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,832.00 | 20,832.00 | 23,900.00 | 23,900.00 | | 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 150 | CUYD | 180.00 | 27,000.00 | 150.00 | 22,500.00 | | 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 180 | CUYD | 215.00 | 38,700.00 | 85.00 | 15,300.00 | | 0004 | 502-01-00100 | Asphalt Concrete | 4,457.4 | TON | 117.00 | 521,515.80 | 215.00 | 958,341.00 | | 0005 | 509-01-00100 | Milling Asphalt Pavement | 3,600 | SQYD | 5.50 | 19,800.00 | 10.00 | 36,000.00 | | 0006 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -300 | CUYD | 0.01 | -3.00 | 0.05 | -15.00 | | 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 28.8 | SQYD | 310.00 | 8,928.00 | 385.00 | 11,088.00 | | 0008 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 60 | LNFT | 450.00 | 27,000.00 | 780.00 | 46,800.00 | | 0009 | 706-02-00200 | Concrete Drive (6" Thick) | 173.8 | SQYD | 140.00 | 24,332.00 | 150.00 | 26,070.00 | | 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 80,000.00 | 80,000.00 | | 0011 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 7.377 | MILE | 1,100.00 | 8,114.70 | 1,500.00 | 11,065.50 | | 0012 | 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | 3,120.00 | 6,240.00 | 5,000.00 | 10,000.00 | | 0013 | 726-01-00100 | Bedding Material | 8 | CUYD | 280.00 | 2,240.00 | 160.00 | 1,280.00 | | 0014 | 727-01-00100 | Mobilization | 1 | LUMP | 110,000.00 | 110,000.00 | 135,000.00 | 135,000.00 | | 0015 | 731-02-00100 | Reflectorized Raised Pavement Markers | 328 | EACH | 7.20 | 2,361.60 | 7.50 | 2,460.00 | | 0016 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.919 | MILE | 5,525.00 | 27,177.48 | 5,000.00 | 24,595.00 | | 0017 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,500.00 | 12,500.00 | 13,000.00 | 13,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 891,738.58 | | 1,417,384.50 |
|