Proposal:H.010341.6
Parish:Rapides
Routes:LA 115
Description:LA 115: LA 1207 - LA 28
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, DRAINAGE STRUCTURES, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$5,330,974.40
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | Gilchrist Construction Company, LLC | $4,725,153.30 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $4,886,943.51 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Gilchrist Construction Company, LLC | - 2 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 75,000.00 | 75,000.00 | 12,500.00 | 12,500.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 365 | LNFT | 16.00 | 5,840.00 | 13.50 | 4,927.50 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 578 | CUYD | 80.00 | 46,240.00 | 20.00 | 11,560.00 | | 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 12 | EACH | 160.00 | 1,920.00 | 150.00 | 1,800.00 | | 0005 | 204-06-00100 | Temporary Silt Fencing | 120 | LNFT | 10.00 | 1,200.00 | 9.00 | 1,080.00 | | 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,065 | CUYD | 50.00 | 103,250.00 | 55.00 | 113,575.00 | | 0007 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 26.7 | CUYD | 200.00 | 5,340.00 | 100.00 | 2,670.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 13,914.4 | TON | 140.00 | 1,948,016.00 | 142.00 | 1,975,844.80 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 2,159.5 | TON | 14.00 | 30,233.00 | 220.00 | 475,090.00 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 74,263 | SQYD | 6.00 | 445,578.00 | 2.55 | 189,370.65 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,926 | CUYD | 1.00 | -2,926.00 | 1.00 | -2,926.00 | | 0012 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 7,053 | SQYD | 170.00 | 1,199,010.00 | 185.00 | 1,304,805.00 | | 0013 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 160 | LNFT | 40.00 | 6,400.00 | 25.00 | 4,000.00 | | 0014 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 240 | LNFT | 25.00 | 6,000.00 | 20.00 | 4,800.00 | | 0015 | 701-01-01003 | Cross Drain Pipe (24" RCP/RPVCP/CPEPDW) | 232 | LNFT | 375.00 | 87,000.00 | 320.00 | 74,240.00 | | 0016 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 224 | LNFT | 8.00 | 1,792.00 | 10.00 | 2,240.00 | | 0017 | 702-05-01000 | Cross Drain End Treatment (1 Barrel, 24" RCP or 30" CMP) | 2 | EACH | 5,300.00 | 10,600.00 | 3,100.00 | 6,200.00 | | 0018 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 137.5 | LNFT | 36.00 | 4,950.00 | 34.50 | 4,743.75 | | 0019 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 140.00 | 14,000.00 | 135.00 | 13,500.00 | | 0020 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 4,000.00 | 16,000.00 | 3,800.00 | 15,200.00 | | 0021 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 25 | SQYD | 200.00 | 5,000.00 | 200.00 | 5,000.00 | | 0022 | 711-04-00100 | Geotextile Fabric | 25 | SQYD | 3.00 | 75.00 | 10.00 | 250.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 60,000.00 | 60,000.00 | | 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 15.215 | MILE | 200.00 | 3,043.00 | 154.00 | 2,343.11 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 14.291 | MILE | 600.00 | 8,574.60 | 600.00 | 8,574.60 | | 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 38.117 | MILE | 1,000.00 | 38,117.00 | 1,000.00 | 38,117.00 | | 0027 | 724-01-00100 | Rumble Strips (Centerline) | 5.027 | MILE | 1,100.00 | 5,529.70 | 1,000.00 | 5,027.00 | | 0028 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 10.054 | MILE | 1,100.00 | 11,059.40 | 1,000.00 | 10,054.00 | | 0029 | 726-01-00100 | Bedding Material | 49.1 | CUYD | 160.00 | 7,856.00 | 175.00 | 8,592.50 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 440,000.00 | 440,000.00 | 400,000.00 | 400,000.00 | | 0031 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 130.00 | 780.00 | 125.00 | 750.00 | | 0032 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 140.00 | 560.00 | 135.00 | 540.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 710 | EACH | 6.00 | 4,260.00 | 5.00 | 3,550.00 | | 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 108 | LNFT | 12.00 | 1,296.00 | 11.00 | 1,188.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.706 | MILE | 5,600.00 | 71,153.60 | 5,500.00 | 69,883.00 | | 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.764 | MILE | 3,000.00 | 14,292.00 | 2,900.00 | 13,815.60 | | 0037 | 735-01-00100 | Mailboxes | 102 | EACH | 25.00 | 2,550.00 | 1.00 | 102.00 | | 0038 | 735-02-00100 | Mailbox Supports (Single) | 90 | EACH | 230.00 | 20,700.00 | 250.00 | 22,500.00 | | 0039 | 735-03-00100 | Mailbox Supports (Double) | 6 | EACH | 260.00 | 1,560.00 | 250.00 | 1,500.00 | | 0040 | 739-01-00100 | Hydro-Seeding | 3.68 | ACRE | 2,800.00 | 10,304.00 | 2,700.00 | 9,936.00 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 23,000.00 | 23,000.00 | 10,000.00 | 10,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,725,153.30 | | 4,886,943.51 |
|