Proposal:H.001553.6
Parish:Jackson
Routes:LA 146, LA 4
Description:LA 146 BRIDGES NEAR KELLEYS
Type Construction:REMOVAL OF BRIDGES, CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE, TEMPORARY ROADS AND BRIDGES, PRECAST CONCRETE PILES, CONCRETE BOX CULVERTS, CONCRETE SLAB SPAN BRIDGES, AND RELATED WORK.
Estimated Construction Cost:$19,014,407.22
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | Gilchrist Construction Company, LLC | $14,550,442.15 |
| 2 | 49239 | WL Bass Construction Inc. | $14,997,797.90 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $15,356,389.82 |
| 4 | 39613 | Baker Pile Driving and Site Work, LLC | $16,809,658.85 |
| 5 | 79463 | Denley Brown Contractors, LLC | $16,838,410.80 |
| 6 | 14788 | Louisiana Bridge, Inc. | $20,043,057.24 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Gilchrist Construction Company, LLC | - 2 - WL Bass Construction Inc. | - 3 - JB JAMES CONSTRUCTION LLC | - 4 - Baker Pile Driving and Site Work, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 8 | LUMP | 250,000.00 | 250,000.00 | 422,000.00 | 422,000.00 | 1,000,000.00 | 1,000,000.00 | 133,200.00 | 133,200.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 9,200.00 | 9,200.00 | 30,000.00 | 30,000.00 | 11,100.00 | 11,100.00 | | 0003 | 202-02-00010 | Removal of Fence Gate | 3 | EACH | 1,200.00 | 3,600.00 | 250.00 | 750.00 | 450.00 | 1,350.00 | 499.50 | 1,498.50 | | 0004 | 202-02-02000 | Removal of Asphalt Drives | 99 | SQYD | 60.00 | 5,940.00 | 6.00 | 594.00 | 8.00 | 792.00 | 8.88 | 879.12 | | 0005 | 202-02-03030 | Removal of Pavement Structure | 11,108.6 | SQYD | 8.00 | 88,868.80 | 15.00 | 166,629.00 | 8.00 | 88,868.80 | 9.00 | 99,977.40 | | 0006 | 202-02-04501 | Removal of Bridge STR. NO. 052500680202471 | 3,167 | LUMP | 49,000.00 | 49,000.00 | 55,000.00 | 55,000.00 | 120,000.00 | 120,000.00 | 57,950.16 | 57,950.16 | | 0007 | 202-02-04501 | Removal of Bridge STR. NO. 052500680202561 | 2,137 | LUMP | 49,000.00 | 49,000.00 | 35,000.00 | 35,000.00 | 110,000.00 | 110,000.00 | 38,633.83 | 38,633.83 | | 0008 | 202-02-04501 | Removal of Bridge STR. NO. 052500680206581 | 2,145 | LUMP | 25,000.00 | 25,000.00 | 32,000.00 | 32,000.00 | 100,000.00 | 100,000.00 | 38,633.83 | 38,633.83 | | 0009 | 202-02-04501 | Removal of Bridge STR. NO. 052500680302631 | 2,137 | LUMP | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 | 90,000.00 | 90,000.00 | 19,317.50 | 19,317.50 | | 0010 | 202-02-04501 | Removal of Bridge Structure No. 052500680300451 (39' x 25.9' Treated Timber Trestle Bridge) | 1,010 | LUMP | 49,000.00 | 49,000.00 | 27,700.00 | 27,700.00 | 80,000.00 | 80,000.00 | 38,633.83 | 38,633.83 | | 0011 | 202-02-12000 | Removal of Fence | 3,200 | LNFT | 5.00 | 16,000.00 | 2.00 | 6,400.00 | 8.00 | 25,600.00 | 8.88 | 28,416.00 | | 0012 | 202-02-12020 | Removal of Fence (Chain Link) | 436 | LNFT | 8.00 | 3,488.00 | 2.00 | 872.00 | 15.00 | 6,540.00 | 16.65 | 7,259.40 | | 0013 | 202-02-14500 | Removal of Guard Rail | 1,731.3 | LNFT | 8.00 | 13,850.40 | 9.00 | 15,581.70 | 7.00 | 12,119.10 | 8.00 | 13,850.40 | | 0014 | 202-02-38240 | Removal of Signs and Supports | 39 | EACH | 200.00 | 7,800.00 | 125.00 | 4,875.00 | 50.00 | 1,950.00 | 16.65 | 649.35 | | 0015 | 203-01-00100 | General Excavation | 6,254 | CUYD | 20.00 | 125,080.00 | 17.00 | 106,318.00 | 15.00 | 93,810.00 | 16.65 | 104,129.10 | | 0016 | 203-02-00100 | Drainage Excavation | 360 | CUYD | 30.00 | 10,800.00 | 30.00 | 10,800.00 | 25.00 | 9,000.00 | 27.75 | 9,990.00 | | 0017 | 203-03-00100 | Embankment | 12,055 | CUYD | 34.00 | 409,870.00 | 20.00 | 241,100.00 | 20.00 | 241,100.00 | 19.98 | 240,858.90 | | 0018 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 56 | EACH | 200.00 | 11,200.00 | 150.00 | 8,400.00 | 150.00 | 8,400.00 | 166.50 | 9,324.00 | | 0019 | 204-06-00100 | Temporary Silt Fencing | 14,950 | LNFT | 2.50 | 37,375.00 | 3.00 | 44,850.00 | 6.00 | 89,700.00 | 3.33 | 49,783.50 | | 0020 | 302-02-12060 | Class II Base Course (12" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 12,113.1 | SQYD | 60.00 | 726,786.00 | 72.00 | 872,143.20 | 51.00 | 617,768.10 | 61.60 | 746,166.96 | | 0021 | 302-03-00100 | Base Drain Outlet | 30 | EACH | 1,500.00 | 45,000.00 | 2,250.00 | 67,500.00 | 1,200.00 | 36,000.00 | 1,382.70 | 41,481.00 | | 0022 | 304-01-00100 | Lime | 42.94 | TON | 455.00 | 19,537.70 | 400.00 | 17,176.00 | 300.00 | 12,882.00 | 870.00 | 37,357.80 | | 0023 | 304-05-00100 | Lime Treatment (Type E) | 3,032 | SQYD | 12.00 | 36,384.00 | 6.00 | 18,192.00 | 8.00 | 24,256.00 | 14.14 | 42,872.48 | | 0024 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 78 | CUYD | 125.00 | 9,750.00 | 150.00 | 11,700.00 | 250.00 | 19,500.00 | 224.85 | 17,538.30 | | 0025 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 251.2 | CUYD | 75.00 | 18,840.00 | 160.00 | 40,192.00 | 240.00 | 60,288.00 | 172.00 | 43,206.40 | | 0026 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 353 | SQYD | 75.00 | 26,475.00 | 124.00 | 43,772.00 | 90.00 | 31,770.00 | 222.00 | 78,366.00 | | 0027 | 502-01-00100 | Asphalt Concrete | 3,308.1 | TON | 250.00 | 827,025.00 | 255.00 | 843,565.50 | 250.00 | 827,025.00 | 277.50 | 917,997.75 | | 0028 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 602.8 | TON | 250.00 | 150,700.00 | 275.00 | 165,770.00 | 275.00 | 165,770.00 | 305.25 | 184,004.70 | | 0029 | 509-01-00100 | Milling Asphalt Pavement | 452 | SQYD | 30.00 | 13,560.00 | 25.00 | 11,300.00 | 10.00 | 4,520.00 | 55.50 | 25,086.00 | | 0030 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -28 | CUYD | 1.00 | -28.00 | 1.00 | -28.00 | 0.01 | -0.28 | 1.00 | -28.00 | | 0031 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 328 | SQYD | 2,220.00 | 728,160.00 | 270.00 | 88,560.00 | 260.00 | 85,280.00 | 258.63 | 84,830.64 | | 0032 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 1,344 | INLF | 10.00 | 13,440.00 | 1.00 | 1,344.00 | 4.00 | 5,376.00 | 7.51 | 10,093.44 | | 0033 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 768 | LNFT | 14.00 | 10,752.00 | 10.00 | 7,680.00 | 10.00 | 7,680.00 | 5.60 | 4,300.80 | | 0034 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 1,280 | LNFT | 10.00 | 12,800.00 | 2.00 | 2,560.00 | 4.00 | 5,120.00 | 7.24 | 9,267.20 | | 0035 | 701-05-01048 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 48 | LNFT | 180.00 | 8,640.00 | 100.00 | 4,800.00 | 100.00 | 4,800.00 | 112.58 | 5,403.84 | | 0036 | 701-05-01067 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 210 | LNFT | 120.00 | 25,200.00 | 145.00 | 30,450.00 | 110.00 | 23,100.00 | 137.25 | 28,822.50 | | 0037 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 312 | LNFT | 25.00 | 7,800.00 | 100.00 | 31,200.00 | 25.00 | 7,800.00 | 27.75 | 8,658.00 | | 0038 | 702-08-00100 | Side Drain Safety End (Type 1) | 5 | EACH | 9,000.00 | 45,000.00 | 2,500.00 | 12,500.00 | 4,800.00 | 24,000.00 | 5,328.00 | 26,640.00 | | 0039 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 687.5 | LNFT | 31.00 | 21,312.50 | 31.00 | 21,312.50 | 30.00 | 20,625.00 | 45.00 | 30,937.50 | | 0040 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 400 | LNFT | 118.00 | 47,200.00 | 117.00 | 46,800.00 | 117.00 | 46,800.00 | 129.87 | 51,948.00 | | 0041 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 16 | EACH | 3,100.00 | 49,600.00 | 3,000.00 | 48,000.00 | 3,000.00 | 48,000.00 | 3,330.00 | 53,280.00 | | 0042 | 705-01-00100 | Barbed Wire Fence | 2,244 | LNFT | 16.00 | 35,904.00 | 7.20 | 16,156.80 | 7.00 | 15,708.00 | 7.94 | 17,817.36 | | 0043 | 705-04-00100 | Single Swinging Driveway Gates | 2 | EACH | 2,100.00 | 4,200.00 | 300.00 | 600.00 | 300.00 | 600.00 | 333.00 | 666.00 | | 0044 | 708-01-00100 | Right-of-Way Monument | 45 | EACH | 625.00 | 28,125.00 | 400.00 | 18,000.00 | 600.00 | 27,000.00 | 666.00 | 29,970.00 | | 0045 | 708-02-00100 | Right-of-Way Monument Witness Post | 45 | EACH | 225.00 | 10,125.00 | 200.00 | 9,000.00 | 200.00 | 9,000.00 | 222.00 | 9,990.00 | | 0046 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,783 | SQYD | 120.00 | 213,960.00 | 100.00 | 178,300.00 | 110.00 | 196,130.00 | 122.10 | 217,704.30 | | 0047 | 711-04-00100 | Geotextile Fabric | 1,783 | SQYD | 4.00 | 7,132.00 | 4.00 | 7,132.00 | 4.00 | 7,132.00 | 6.03 | 10,751.49 | | 0048 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | 230,000.00 | 230,000.00 | 105,727.50 | 105,727.50 | | 0049 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.218 | MILE | 1,200.00 | 6,261.60 | 1,500.00 | 7,827.00 | 1,200.00 | 6,261.60 | 1,665.00 | 8,687.97 | | 0050 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 348 | EACH | 6.00 | 2,088.00 | 6.00 | 2,088.00 | 6.00 | 2,088.00 | 6.66 | 2,317.68 | | 0051 | 716-01-00100 | Mulch (Vegetative) | 24.1 | TON | 960.00 | 23,136.00 | 750.00 | 18,075.00 | 750.00 | 18,075.00 | 832.50 | 20,063.25 | | 0052 | 717-01-00100 | Seeding | 363 | LB | 21.00 | 7,623.00 | 18.00 | 6,534.00 | 18.00 | 6,534.00 | 19.98 | 7,252.74 | | 0053 | 718-01-00100 | Fertilizer | 12,049 | LB | 0.80 | 9,639.20 | 0.80 | 9,639.20 | 0.80 | 9,639.20 | 0.83 | 10,000.67 | | 0054 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 388 | SQYD | 2.25 | 873.00 | 2.00 | 776.00 | 2.00 | 776.00 | 2.11 | 818.68 | | 0055 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 3,801 | SQYD | 2.25 | 8,552.25 | 2.10 | 7,982.10 | 2.20 | 8,362.20 | 2.33 | 8,856.33 | | 0056 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 644 | SQYD | 2.25 | 1,449.00 | 2.75 | 1,771.00 | 2.75 | 1,771.00 | 3.05 | 1,964.20 | | 0057 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 55,000.00 | 55,000.00 | 100,234.17 | 100,234.17 | | 0058 | 724-01-00100 | Rumble Strips (Centerline) | 0.497 | MILE | 1,000.00 | 497.00 | 350.00 | 173.95 | 1,000.00 | 497.00 | 560.00 | 278.32 | | 0059 | 725-01-00100 | Temporary Detour Roads | 19,992.5 | SQYD | 125.00 | 2,499,062.50 | 150.00 | 2,998,875.00 | 110.00 | 2,199,175.00 | 131.02 | 2,619,417.35 | | 0060 | 726-01-00100 | Bedding Material | 337.8 | CUYD | 160.00 | 54,048.00 | 200.00 | 67,560.00 | 100.00 | 33,780.00 | 189.00 | 63,844.20 | | 0061 | 727-01-00100 | Mobilization | 1 | LUMP | 1,200,000.00 | 1,200,000.00 | 1,499,700.00 | 1,499,700.00 | 1,500,000.00 | 1,500,000.00 | 1,492,737.17 | 1,492,737.17 | | 0062 | 729-01-00100 | Sign (Type A) | 94.7 | SQFT | 36.00 | 3,409.20 | 35.00 | 3,314.50 | 35.00 | 3,314.50 | 33.30 | 3,153.51 | | 0063 | 729-01-00200 | Mounting of Sign (Type A) | 15 | EACH | 26.00 | 390.00 | 25.00 | 375.00 | 225.00 | 3,375.00 | 27.75 | 416.25 | | 0064 | 729-16-00200 | Object Marker Assembly (Type 2) | 1 | EACH | 76.00 | 76.00 | 75.00 | 75.00 | 75.00 | 75.00 | 222.00 | 222.00 | | 0065 | 729-16-00300 | Object Marker Assembly (Type 3) | 20 | EACH | 86.00 | 1,720.00 | 100.00 | 2,000.00 | 85.00 | 1,700.00 | 194.25 | 3,885.00 | | 0066 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 14 | EACH | 176.00 | 2,464.00 | 175.00 | 2,450.00 | 175.00 | 2,450.00 | 111.00 | 1,554.00 | | 0067 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 607 | EACH | 13.00 | 7,891.00 | 9.00 | 5,463.00 | 12.00 | 7,284.00 | 9.99 | 6,063.93 | | 0068 | 731-02-00100 | Reflectorized Raised Pavement Markers | 224 | EACH | 7.00 | 1,568.00 | 6.00 | 1,344.00 | 6.00 | 1,344.00 | 6.66 | 1,491.84 | | 0069 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.874 | MILE | 6,000.00 | 23,244.00 | 4,800.00 | 18,595.20 | 5,850.00 | 22,662.90 | 5,330.00 | 20,648.42 | | 0070 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.904 | MILE | 3,000.00 | 2,712.00 | 1,500.00 | 1,356.00 | 2,900.00 | 2,621.60 | 1,665.00 | 1,505.16 | | 0071 | 732-05-00100 | Removal of Existing Markings | 0.512 | MILE | 9,500.00 | 4,864.00 | 6,000.00 | 3,072.00 | 9,500.00 | 4,864.00 | 6,660.00 | 3,409.92 | | 0072 | 735-01-00100 | Mailboxes | 3 | EACH | 26.00 | 78.00 | 25.00 | 75.00 | 25.00 | 75.00 | 49.95 | 149.85 | | 0073 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 255.00 | 765.00 | 250.00 | 750.00 | 250.00 | 750.00 | 194.25 | 582.75 | | 0074 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 300,000.00 | 300,000.00 | 200,000.00 | 200,000.00 | 198,764.09 | 198,764.09 | | 0075 | 804-01-00400 | Precast Concrete Piles (18") | 5,816 | LNFT | 166.00 | 965,456.00 | 180.00 | 1,046,880.00 | 200.00 | 1,163,200.00 | 180.09 | 1,047,403.44 | | 0076 | 805-01-00100 | Class A1 Concrete (Slab Span) | 607.81 | CUYD | 1,200.00 | 729,372.00 | 400.00 | 243,124.00 | 1,600.00 | 972,496.00 | 1,832.00 | 1,113,507.92 | | 0077 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 186.95 | CUYD | 2,000.00 | 373,900.00 | 350.00 | 65,432.50 | 2,600.00 | 486,070.00 | 3,068.00 | 573,562.60 | | 0078 | 805-15-01400 | Reinforced Concrete Box Culverts (Precast) (8' x 6') | 480 | LNFT | 1,000.00 | 480,000.00 | 1,300.00 | 624,000.00 | 1,500.00 | 720,000.00 | 1,207.17 | 579,441.60 | | 0079 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall QUANTITY OF STEEL = 2,659.84 LB, QUANTITY OF CONCRETE = 31.00 CUYD | 2 | EACH | 80,000.00 | 160,000.00 | 112,000.00 | 224,000.00 | 50,000.00 | 100,000.00 | 87,058.99 | 174,117.98 | | 0080 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 5,262 | SQFT | 2.50 | 13,155.00 | 2.00 | 10,524.00 | 1.30 | 6,840.60 | 6.86 | 36,097.32 | | 0081 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 5,262 | SQFT | 3.00 | 15,786.00 | 2.00 | 10,524.00 | 2.00 | 10,524.00 | 6.86 | 36,097.32 | | 0082 | 806-01-00100 | Deformed Reinforcing Steel | 144,185 | LB | 1.00 | 144,185.00 | 3.75 | 540,693.75 | 1.50 | 216,277.50 | 1.50 | 216,277.50 | | 0083 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 760 | LNFT | 275.00 | 209,000.00 | 300.00 | 228,000.00 | 200.00 | 152,000.00 | 238.65 | 181,374.00 | | 0084 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 10,240 | SQFT | 125.00 | 1,280,000.00 | 125.00 | 1,280,000.00 | 100.00 | 1,024,000.00 | 113.12 | 1,158,348.80 | | 0085 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 475 | SFIN | 100.00 | 47,500.00 | 120.00 | 57,000.00 | 100.00 | 47,500.00 | 114.01 | 54,154.75 | | 0086 | 815-03-00300 | Joint Seal (Poured) | 736 | LNFT | 20.00 | 14,720.00 | 15.00 | 11,040.00 | 12.00 | 8,832.00 | 27.15 | 19,982.40 | | 0087 | 817-01-00100 | Temporary Detour Bridge (Concrete) | 5,333 | SQFT | 165.00 | 879,945.00 | 137.00 | 730,621.00 | 155.00 | 826,615.00 | 373.59 | 1,992,355.47 | | 0088 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 20 | EACH | 8,000.00 | 160,000.00 | 7,200.00 | 144,000.00 | 7,500.00 | 150,000.00 | 9,153.17 | 183,063.40 | | 0089 | TS-741-00100 | Fire Hydrant Assembly | 1 | EACH | 11,500.00 | 11,500.00 | 12,500.00 | 12,500.00 | 10,000.00 | 10,000.00 | 12,487.50 | 12,487.50 | | 0090 | TS-741-10044 | Abandonment of Existing Water Mains | 1 | LNFT | 2,600.00 | 2,600.00 | 4,400.00 | 4,400.00 | 12,000.00 | 12,000.00 | 4,773.00 | 4,773.00 | | 0091 | TS-741-11202 | Ductile Iron Fittings | 0.2 | TON | 39,000.00 | 7,800.00 | 70,000.00 | 14,000.00 | 20,000.00 | 4,000.00 | 71,606.10 | 14,321.22 | | 0092 | TS-741-37071 | Water Pipe (Open Cut) (6" CL160 PVC Water Main) | 400 | LNFT | 51.00 | 20,400.00 | 31.00 | 12,400.00 | 50.00 | 20,000.00 | 34.41 | 13,764.00 | | 0093 | TS-741-37071 | Water Pipe (Open Cut) (8" CL160 PVC Water Main) | 400 | LNFT | 80.00 | 32,000.00 | 40.00 | 16,000.00 | 65.00 | 26,000.00 | 41.07 | 16,428.00 | | 0094 | TS-741-37072 | Water Pipe (Directional Drill) (6" DR11, HDPE Water Main) | 550 | LNFT | 52.00 | 28,600.00 | 65.00 | 35,750.00 | 90.00 | 49,500.00 | 71.04 | 39,072.00 | | 0095 | TS-741-37072 | Water Pipe (Directional Drill) (8" DR11, HDPE Water Main) | 550 | LNFT | 81.00 | 44,550.00 | 91.00 | 50,050.00 | 110.00 | 60,500.00 | 99.90 | 54,945.00 | | 0096 | TS-741-60036 | Gate Valve with Pad, Box, and Sign 6" | 2 | EACH | 1,600.00 | 3,200.00 | 3,000.00 | 6,000.00 | 2,000.00 | 4,000.00 | 3,330.00 | 6,660.00 | | 0097 | TS-741-60036 | Gate Valve with Pad, Box, and Sign 8" | 2 | EACH | 3,500.00 | 7,000.00 | 3,500.00 | 7,000.00 | 3,000.00 | 6,000.00 | 4,218.00 | 8,436.00 | | 0098 | TS-741-60038 | Water Service Assemblies 4" Blow Off Assembly | 2 | EACH | 4,800.00 | 9,600.00 | 7,200.00 | 14,400.00 | 4,500.00 | 9,000.00 | 7,770.00 | 15,540.00 | | 0099 | TS-741-60038 | Water Service Assemblies Leak Test Assembly | 2 | EACH | 4,400.00 | 8,800.00 | 3,100.00 | 6,200.00 | 1,500.00 | 3,000.00 | 3,330.00 | 6,660.00 | | 0100 | TS-741-60038 | Water Service Assemblies Sample Tap Assembly | 2 | EACH | 1,500.00 | 3,000.00 | 4,900.00 | 9,800.00 | 2,500.00 | 5,000.00 | 5,217.00 | 10,434.00 | | 0101 | TS-741-60039 | Water Service Pipe (1" HDPE) | 120 | LNFT | 16.00 | 1,920.00 | 1.00 | 120.00 | 20.00 | 2,400.00 | 2.22 | 266.40 | | 0102 | TS-741-60040 | Connect Water Main to Existing Water Main 6"x6" Connection | 2 | EACH | 7,100.00 | 14,200.00 | 6,750.00 | 13,500.00 | 10,000.00 | 20,000.00 | 7,437.00 | 14,874.00 | | 0103 | TS-741-60040 | Connect Water Main to Existing Water Main 8"x8" Connection | 2 | EACH | 8,000.00 | 16,000.00 | 7,200.00 | 14,400.00 | 11,000.00 | 22,000.00 | 7,770.00 | 15,540.00 | | 0104 | TS-741-60042 | Interconnecting Water Service Lines | 2 | EACH | 350.00 | 700.00 | 1,800.00 | 3,600.00 | 1,200.00 | 2,400.00 | 1,776.00 | 3,552.00 | | 0105 | TS-741-60044 | Testing and Disinfection of Water Mains | 1,900 | LNFT | 3.00 | 5,700.00 | 2.50 | 4,750.00 | 1.00 | 1,900.00 | 2.78 | 5,282.00 | | 0106 | TS-741-60045 | Cleanup, Maintenance, and Final Restoration of Water Mains | 1,900 | LNFT | 11.00 | 20,900.00 | 2.50 | 4,750.00 | 1.00 | 1,900.00 | 2.78 | 5,282.00 | | 0107 | TS-741-60046 | PE x PVC Connections 6" | 2 | EACH | 740.00 | 1,480.00 | 3,000.00 | 6,000.00 | 500.00 | 1,000.00 | 3,108.00 | 6,216.00 | | 0108 | TS-741-60046 | PE x PVC Connections 8" PE x PVC Connections | 2 | EACH | 925.00 | 1,850.00 | 3,000.00 | 6,000.00 | 750.00 | 1,500.00 | 3,330.00 | 6,660.00 | | 0109 | TS-742-01024 | Cleanup, Maintenance and Final Restoration 1800 LF | 1 | LS | 20,000.00 | 20,000.00 | 7,000.00 | 7,000.00 | 6,000.00 | 6,000.00 | 7,548.00 | 7,548.00 | | 0110 | TS-742-01042 | Testing of Force Mains | 1,800 | LNFT | 3.00 | 5,400.00 | 3.00 | 5,400.00 | 3.00 | 5,400.00 | 3.33 | 5,994.00 | | 0111 | TS-742-37023 | Connections to Existing Manholes & Lines 3" PE x PVC Connections | 2 | EACH | 550.00 | 1,100.00 | 7,300.00 | 14,600.00 | 3,000.00 | 6,000.00 | 8,103.00 | 16,206.00 | | 0112 | TS-742-37023 | Connections to Existing Manholes & Lines Manhole x Force Main Connection | 1 | EACH | 2,800.00 | 2,800.00 | 7,500.00 | 7,500.00 | 2,500.00 | 2,500.00 | 8,103.00 | 8,103.00 | | 0113 | TS-742-61009 | Sanitary Sewer Pipe 1-1/4" Sch. 40 PVC Sewer Force Main (open cut) | 200 | LNFT | 16.00 | 3,200.00 | 30.00 | 6,000.00 | 20.00 | 4,000.00 | 32.19 | 6,438.00 | | 0114 | TS-742-61009 | Sanitary Sewer Pipe 3" SDR26 PVC Sewer Force Main (open cut) | 630 | LNFT | 18.00 | 11,340.00 | 22.00 | 13,860.00 | 30.00 | 18,900.00 | 23.31 | 14,685.30 | | 0115 | TS-742-61012 | Pipe Installation (Jack and Bore) 3" SDR26 PVC Sewer Force Main (jack & bore) | 70 | LNFT | 25.00 | 1,750.00 | 96.00 | 6,720.00 | 50.00 | 3,500.00 | 105.45 | 7,381.50 | | 0116 | TS-742-61013 | Pipe Installation (Directional Drill) 1-1/4" DR11, HDPE Sewer Force Main (dir. drill) | 50 | LNFT | 25.00 | 1,250.00 | 135.00 | 6,750.00 | 50.00 | 2,500.00 | 148.74 | 7,437.00 | | 0117 | TS-742-61013 | Pipe Installation (Directional Drill) 3" DR11, HDPE Sewer Force Main (dir. drill) | 850 | LNFT | 30.00 | 25,500.00 | 40.00 | 34,000.00 | 50.00 | 42,500.00 | 36.63 | 31,135.50 | | 0118 | TS-821-00542 | Simplex Lift Station | 4 | EACH | 26,000.00 | 104,000.00 | 63,000.00 | 252,000.00 | 28,000.00 | 112,000.00 | 68,542.50 | 274,170.00 | | 0119 | TS-MSC-00361 | Connecting Gas Main to Existing Gas Main 2" x 1-1/2" Gas Connection | 1 | EACH | 17,000.00 | 17,000.00 | 33,000.00 | 33,000.00 | 6,000.00 | 6,000.00 | 45,492.24 | 45,492.24 | | 0120 | TS-MSC-00361 | Connecting Gas Main to Existing Gas Main 2" x 2" Gas Connection | 1 | EACH | 17,000.00 | 17,000.00 | 32,000.00 | 32,000.00 | 6,000.00 | 6,000.00 | 45,879.26 | 45,879.26 | | 0121 | TS-MSC-00361 | Connecting Gas Main to Existing Gas Main Gas Service Interconnection | 2 | EACH | 5,000.00 | 10,000.00 | 7,600.00 | 15,200.00 | 1,500.00 | 3,000.00 | 7,623.70 | 15,247.40 | | 0122 | TS-MSC-00362 | Connecting Existing Gas Service Lines to Gas Mains (3/4" HDPE) | 120 | EACH | 21.00 | 2,520.00 | 2.00 | 240.00 | 900.00 | 108,000.00 | 1,458.54 | 175,024.80 | | 0123 | TS-MSC-00412 | Gas Pipe (Open Cut) 2" DR11, HDPE Gas Main (Open Cut) | 400 | LF | 41.00 | 16,400.00 | 22.00 | 8,800.00 | 40.00 | 16,000.00 | 22.20 | 8,880.00 | | 0124 | TS-MSC-00413 | Gas Pipe (Directional Drill) 2" DR11, HDPE Gas Main (Dir. Drill) | 550 | LF | 46.00 | 25,300.00 | 27.00 | 14,850.00 | 40.00 | 22,000.00 | 28.86 | 15,873.00 | | 0125 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 80 | EACH | 680.00 | 54,400.00 | 860.00 | 68,800.00 | 1,000.00 | 80,000.00 | 2,174.05 | 173,924.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 14,550,442.15 | | 14,997,797.90 | | 15,356,389.82 | | 16,809,658.85 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Denley Brown Contractors, LLC | - 6 - Louisiana Bridge, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 8 | LUMP | 1,700,000.00 | 1,700,000.00 | 680,000.00 | 680,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 78,000.00 | 78,000.00 | | 0003 | 202-02-00010 | Removal of Fence Gate | 3 | EACH | 450.00 | 1,350.00 | 1,300.00 | 3,900.00 | | 0004 | 202-02-02000 | Removal of Asphalt Drives | 99 | SQYD | 8.00 | 792.00 | 12.00 | 1,188.00 | | 0005 | 202-02-03030 | Removal of Pavement Structure | 11,108.6 | SQYD | 8.00 | 88,868.80 | 11.00 | 122,194.60 | | 0006 | 202-02-04501 | Removal of Bridge STR. NO. 052500680202471 | 3,167 | LUMP | 250,000.00 | 250,000.00 | 55,000.00 | 55,000.00 | | 0007 | 202-02-04501 | Removal of Bridge STR. NO. 052500680202561 | 2,137 | LUMP | 250,000.00 | 250,000.00 | 36,000.00 | 36,000.00 | | 0008 | 202-02-04501 | Removal of Bridge STR. NO. 052500680206581 | 2,145 | LUMP | 250,000.00 | 250,000.00 | 36,000.00 | 36,000.00 | | 0009 | 202-02-04501 | Removal of Bridge STR. NO. 052500680302631 | 2,137 | LUMP | 250,000.00 | 250,000.00 | 36,000.00 | 36,000.00 | | 0010 | 202-02-04501 | Removal of Bridge Structure No. 052500680300451 (39' x 25.9' Treated Timber Trestle Bridge) | 1,010 | LUMP | 250,000.00 | 250,000.00 | 36,000.00 | 36,000.00 | | 0011 | 202-02-12000 | Removal of Fence | 3,200 | LNFT | 3.00 | 9,600.00 | 5.00 | 16,000.00 | | 0012 | 202-02-12020 | Removal of Fence (Chain Link) | 436 | LNFT | 4.00 | 1,744.00 | 5.00 | 2,180.00 | | 0013 | 202-02-14500 | Removal of Guard Rail | 1,731.3 | LNFT | 12.00 | 20,775.60 | 12.00 | 20,775.60 | | 0014 | 202-02-38240 | Removal of Signs and Supports | 39 | EACH | 50.00 | 1,950.00 | 190.00 | 7,410.00 | | 0015 | 203-01-00100 | General Excavation | 6,254 | CUYD | 15.00 | 93,810.00 | 16.00 | 100,064.00 | | 0016 | 203-02-00100 | Drainage Excavation | 360 | CUYD | 25.00 | 9,000.00 | 32.00 | 11,520.00 | | 0017 | 203-03-00100 | Embankment | 12,055 | CUYD | 20.00 | 241,100.00 | 28.00 | 337,540.00 | | 0018 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 56 | EACH | 130.00 | 7,280.00 | 228.00 | 12,768.00 | | 0019 | 204-06-00100 | Temporary Silt Fencing | 14,950 | LNFT | 4.00 | 59,800.00 | 4.00 | 59,800.00 | | 0020 | 302-02-12060 | Class II Base Course (12" Thick) (Crushed Stone, Recycled Portland Cement Concrete, Blended Calcium Sulfate) | 12,113.1 | SQYD | 52.00 | 629,881.20 | 74.00 | 896,369.40 | | 0021 | 302-03-00100 | Base Drain Outlet | 30 | EACH | 1,000.00 | 30,000.00 | 450.00 | 13,500.00 | | 0022 | 304-01-00100 | Lime | 42.94 | TON | 300.00 | 12,882.00 | 415.00 | 17,820.10 | | 0023 | 304-05-00100 | Lime Treatment (Type E) | 3,032 | SQYD | 8.00 | 24,256.00 | 16.25 | 49,270.00 | | 0024 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 78 | CUYD | 160.00 | 12,480.00 | 130.00 | 10,140.00 | | 0025 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 251.2 | CUYD | 170.00 | 42,704.00 | 225.00 | 56,520.00 | | 0026 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 353 | SQYD | 120.00 | 42,360.00 | 75.00 | 26,475.00 | | 0027 | 502-01-00100 | Asphalt Concrete | 3,308.1 | TON | 250.00 | 827,025.00 | 290.00 | 959,349.00 | | 0028 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 602.8 | TON | 275.00 | 165,770.00 | 280.00 | 168,784.00 | | 0029 | 509-01-00100 | Milling Asphalt Pavement | 452 | SQYD | 15.00 | 6,780.00 | 19.00 | 8,588.00 | | 0030 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -28 | CUYD | 1.00 | -28.00 | 1.00 | -28.00 | | 0031 | 510-01-00255 | Pavement Patching (15 inch Minimum Thickness) | 328 | SQYD | 230.00 | 75,440.00 | 454.00 | 148,912.00 | | 0032 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 1,344 | INLF | 4.00 | 5,376.00 | 3.00 | 4,032.00 | | 0033 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 768 | LNFT | 10.00 | 7,680.00 | 20.00 | 15,360.00 | | 0034 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 1,280 | LNFT | 4.00 | 5,120.00 | 11.00 | 14,080.00 | | 0035 | 701-05-01048 | Side Drain Pipe (18" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 48 | LNFT | 90.00 | 4,320.00 | 110.00 | 5,280.00 | | 0036 | 701-05-01067 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW/CMP) | 210 | LNFT | 100.00 | 21,000.00 | 120.00 | 25,200.00 | | 0037 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 312 | LNFT | 10.00 | 3,120.00 | 20.00 | 6,240.00 | | 0038 | 702-08-00100 | Side Drain Safety End (Type 1) | 5 | EACH | 3,000.00 | 15,000.00 | 4,100.00 | 20,500.00 | | 0039 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 687.5 | LNFT | 35.00 | 24,062.50 | 34.50 | 23,718.75 | | 0040 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 400 | LNFT | 150.00 | 60,000.00 | 135.00 | 54,000.00 | | 0041 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 16 | EACH | 3,000.00 | 48,000.00 | 3,800.00 | 60,800.00 | | 0042 | 705-01-00100 | Barbed Wire Fence | 2,244 | LNFT | 11.00 | 24,684.00 | 10.00 | 22,440.00 | | 0043 | 705-04-00100 | Single Swinging Driveway Gates | 2 | EACH | 1,250.00 | 2,500.00 | 1,000.00 | 2,000.00 | | 0044 | 708-01-00100 | Right-of-Way Monument | 45 | EACH | 600.00 | 27,000.00 | 500.00 | 22,500.00 | | 0045 | 708-02-00100 | Right-of-Way Monument Witness Post | 45 | EACH | 200.00 | 9,000.00 | 500.00 | 22,500.00 | | 0046 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 1,783 | SQYD | 110.00 | 196,130.00 | 100.00 | 178,300.00 | | 0047 | 711-04-00100 | Geotextile Fabric | 1,783 | SQYD | 4.00 | 7,132.00 | 4.00 | 7,132.00 | | 0048 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 120,000.00 | 120,000.00 | 367,000.00 | 367,000.00 | | 0049 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.218 | MILE | 1,500.00 | 7,827.00 | 1,705.00 | 8,896.69 | | 0050 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 348 | EACH | 6.00 | 2,088.00 | 7.00 | 2,436.00 | | 0051 | 716-01-00100 | Mulch (Vegetative) | 24.1 | TON | 1,100.00 | 26,510.00 | 1,400.00 | 33,740.00 | | 0052 | 717-01-00100 | Seeding | 363 | LB | 20.00 | 7,260.00 | 23.00 | 8,349.00 | | 0053 | 718-01-00100 | Fertilizer | 12,049 | LB | 1.00 | 12,049.00 | 2.00 | 24,098.00 | | 0054 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 388 | SQYD | 2.50 | 970.00 | 5.00 | 1,940.00 | | 0055 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 3,801 | SQYD | 2.50 | 9,502.50 | 5.00 | 19,005.00 | | 0056 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 644 | SQYD | 5.00 | 3,220.00 | 5.00 | 3,220.00 | | 0057 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 75,000.00 | 75,000.00 | 20,000.00 | 20,000.00 | | 0058 | 724-01-00100 | Rumble Strips (Centerline) | 0.497 | MILE | 1,000.00 | 497.00 | 1,200.00 | 596.40 | | 0059 | 725-01-00100 | Temporary Detour Roads | 19,992.5 | SQYD | 114.00 | 2,279,145.00 | 211.00 | 4,218,417.50 | | 0060 | 726-01-00100 | Bedding Material | 337.8 | CUYD | 150.00 | 50,670.00 | 180.00 | 60,804.00 | | 0061 | 727-01-00100 | Mobilization | 1 | LUMP | 1,680,000.00 | 1,680,000.00 | 2,015,000.00 | 2,015,000.00 | | 0062 | 729-01-00100 | Sign (Type A) | 94.7 | SQFT | 25.00 | 2,367.50 | 57.00 | 5,397.90 | | 0063 | 729-01-00200 | Mounting of Sign (Type A) | 15 | EACH | 150.00 | 2,250.00 | 200.00 | 3,000.00 | | 0064 | 729-16-00200 | Object Marker Assembly (Type 2) | 1 | EACH | 100.00 | 100.00 | 125.00 | 125.00 | | 0065 | 729-16-00300 | Object Marker Assembly (Type 3) | 20 | EACH | 100.00 | 2,000.00 | 135.00 | 2,700.00 | | 0066 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 14 | EACH | 250.00 | 3,500.00 | 200.00 | 2,800.00 | | 0067 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 607 | EACH | 10.00 | 6,070.00 | 11.00 | 6,677.00 | | 0068 | 731-02-00100 | Reflectorized Raised Pavement Markers | 224 | EACH | 6.00 | 1,344.00 | 7.00 | 1,568.00 | | 0069 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.874 | MILE | 4,800.00 | 18,595.20 | 5,500.00 | 21,307.00 | | 0070 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.904 | MILE | 1,500.00 | 1,356.00 | 1,700.00 | 1,536.80 | | 0071 | 732-05-00100 | Removal of Existing Markings | 0.512 | MILE | 6,000.00 | 3,072.00 | 3,500.00 | 1,792.00 | | 0072 | 735-01-00100 | Mailboxes | 3 | EACH | 10.00 | 30.00 | 390.00 | 1,170.00 | | 0073 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 250.00 | 750.00 | 390.00 | 1,170.00 | | 0074 | 740-01-00100 | Construction Layout | 1 | LUMP | 180,000.00 | 180,000.00 | 130,000.00 | 130,000.00 | | 0075 | 804-01-00400 | Precast Concrete Piles (18") | 5,816 | LNFT | 160.00 | 930,560.00 | 228.00 | 1,326,048.00 | | 0076 | 805-01-00100 | Class A1 Concrete (Slab Span) | 607.81 | CUYD | 1,200.00 | 729,372.00 | 1,700.00 | 1,033,277.00 | | 0077 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 186.95 | CUYD | 2,100.00 | 392,595.00 | 2,500.00 | 467,375.00 | | 0078 | 805-15-01400 | Reinforced Concrete Box Culverts (Precast) (8' x 6') | 480 | LNFT | 1,400.00 | 672,000.00 | 1,900.00 | 912,000.00 | | 0079 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall QUANTITY OF STEEL = 2,659.84 LB, QUANTITY OF CONCRETE = 31.00 CUYD | 2 | EACH | 75,000.00 | 150,000.00 | 83,500.00 | 167,000.00 | | 0080 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 5,262 | SQFT | 2.00 | 10,524.00 | 4.00 | 21,048.00 | | 0081 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 5,262 | SQFT | 2.50 | 13,155.00 | 4.00 | 21,048.00 | | 0082 | 806-01-00100 | Deformed Reinforcing Steel | 144,185 | LB | 1.50 | 216,277.50 | 1.70 | 245,114.50 | | 0083 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 760 | LNFT | 240.00 | 182,400.00 | 210.00 | 159,600.00 | | 0084 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 10,240 | SQFT | 120.00 | 1,228,800.00 | 132.00 | 1,351,680.00 | | 0085 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 475 | SFIN | 120.00 | 57,000.00 | 270.00 | 128,250.00 | | 0086 | 815-03-00300 | Joint Seal (Poured) | 736 | LNFT | 16.50 | 12,144.00 | 20.00 | 14,720.00 | | 0087 | 817-01-00100 | Temporary Detour Bridge (Concrete) | 5,333 | SQFT | 205.00 | 1,093,265.00 | 278.00 | 1,482,574.00 | | 0088 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 20 | EACH | 6,000.00 | 120,000.00 | 13,000.00 | 260,000.00 | | 0089 | TS-741-00100 | Fire Hydrant Assembly | 1 | EACH | 10,000.00 | 10,000.00 | 14,000.00 | 14,000.00 | | 0090 | TS-741-10044 | Abandonment of Existing Water Mains | 1 | LNFT | 12,000.00 | 12,000.00 | 5,000.00 | 5,000.00 | | 0091 | TS-741-11202 | Ductile Iron Fittings | 0.2 | TON | 20,000.00 | 4,000.00 | 15,000.00 | 3,000.00 | | 0092 | TS-741-37071 | Water Pipe (Open Cut) (6" CL160 PVC Water Main) | 400 | LNFT | 50.00 | 20,000.00 | 36.00 | 14,400.00 | | 0093 | TS-741-37071 | Water Pipe (Open Cut) (8" CL160 PVC Water Main) | 400 | LNFT | 65.00 | 26,000.00 | 42.00 | 16,800.00 | | 0094 | TS-741-37072 | Water Pipe (Directional Drill) (6" DR11, HDPE Water Main) | 550 | LNFT | 90.00 | 49,500.00 | 73.00 | 40,150.00 | | 0095 | TS-741-37072 | Water Pipe (Directional Drill) (8" DR11, HDPE Water Main) | 550 | LNFT | 110.00 | 60,500.00 | 103.00 | 56,650.00 | | 0096 | TS-741-60036 | Gate Valve with Pad, Box, and Sign 6" | 2 | EACH | 2,000.00 | 4,000.00 | 3,400.00 | 6,800.00 | | 0097 | TS-741-60036 | Gate Valve with Pad, Box, and Sign 8" | 2 | EACH | 3,000.00 | 6,000.00 | 4,400.00 | 8,800.00 | | 0098 | TS-741-60038 | Water Service Assemblies 4" Blow Off Assembly | 2 | EACH | 4,500.00 | 9,000.00 | 8,000.00 | 16,000.00 | | 0099 | TS-741-60038 | Water Service Assemblies Leak Test Assembly | 2 | EACH | 1,500.00 | 3,000.00 | 3,400.00 | 6,800.00 | | 0100 | TS-741-60038 | Water Service Assemblies Sample Tap Assembly | 2 | EACH | 2,500.00 | 5,000.00 | 5,400.00 | 10,800.00 | | 0101 | TS-741-60039 | Water Service Pipe (1" HDPE) | 120 | LNFT | 20.00 | 2,400.00 | 3.00 | 360.00 | | 0102 | TS-741-60040 | Connect Water Main to Existing Water Main 6"x6" Connection | 2 | EACH | 10,000.00 | 20,000.00 | 7,600.00 | 15,200.00 | | 0103 | TS-741-60040 | Connect Water Main to Existing Water Main 8"x8" Connection | 2 | EACH | 11,000.00 | 22,000.00 | 8,000.00 | 16,000.00 | | 0104 | TS-741-60042 | Interconnecting Water Service Lines | 2 | EACH | 1,200.00 | 2,400.00 | 3,650.00 | 7,300.00 | | 0105 | TS-741-60044 | Testing and Disinfection of Water Mains | 1,900 | LNFT | 1.00 | 1,900.00 | 4.00 | 7,600.00 | | 0106 | TS-741-60045 | Cleanup, Maintenance, and Final Restoration of Water Mains | 1,900 | LNFT | 1.00 | 1,900.00 | 3.00 | 5,700.00 | | 0107 | TS-741-60046 | PE x PVC Connections 6" | 2 | EACH | 500.00 | 1,000.00 | 3,200.00 | 6,400.00 | | 0108 | TS-741-60046 | PE x PVC Connections 8" PE x PVC Connections | 2 | EACH | 750.00 | 1,500.00 | 3,405.00 | 6,810.00 | | 0109 | TS-742-01024 | Cleanup, Maintenance and Final Restoration 1800 LF | 1 | LS | 6,000.00 | 6,000.00 | 7,800.00 | 7,800.00 | | 0110 | TS-742-01042 | Testing of Force Mains | 1,800 | LNFT | 3.00 | 5,400.00 | 4.00 | 7,200.00 | | 0111 | TS-742-37023 | Connections to Existing Manholes & Lines 3" PE x PVC Connections | 2 | EACH | 3,000.00 | 6,000.00 | 8,300.00 | 16,600.00 | | 0112 | TS-742-37023 | Connections to Existing Manholes & Lines Manhole x Force Main Connection | 1 | EACH | 2,500.00 | 2,500.00 | 8,300.00 | 8,300.00 | | 0113 | TS-742-61009 | Sanitary Sewer Pipe 1-1/4" Sch. 40 PVC Sewer Force Main (open cut) | 200 | LNFT | 20.00 | 4,000.00 | 33.00 | 6,600.00 | | 0114 | TS-742-61009 | Sanitary Sewer Pipe 3" SDR26 PVC Sewer Force Main (open cut) | 630 | LNFT | 30.00 | 18,900.00 | 24.00 | 15,120.00 | | 0115 | TS-742-61012 | Pipe Installation (Jack and Bore) 3" SDR26 PVC Sewer Force Main (jack & bore) | 70 | LNFT | 50.00 | 3,500.00 | 108.00 | 7,560.00 | | 0116 | TS-742-61013 | Pipe Installation (Directional Drill) 1-1/4" DR11, HDPE Sewer Force Main (dir. drill) | 50 | LNFT | 50.00 | 2,500.00 | 152.00 | 7,600.00 | | 0117 | TS-742-61013 | Pipe Installation (Directional Drill) 3" DR11, HDPE Sewer Force Main (dir. drill) | 850 | LNFT | 50.00 | 42,500.00 | 38.00 | 32,300.00 | | 0118 | TS-821-00542 | Simplex Lift Station | 4 | EACH | 28,000.00 | 112,000.00 | 71,000.00 | 284,000.00 | | 0119 | TS-MSC-00361 | Connecting Gas Main to Existing Gas Main 2" x 1-1/2" Gas Connection | 1 | EACH | 6,000.00 | 6,000.00 | 37,000.00 | 37,000.00 | | 0120 | TS-MSC-00361 | Connecting Gas Main to Existing Gas Main 2" x 2" Gas Connection | 1 | EACH | 6,000.00 | 6,000.00 | 36,500.00 | 36,500.00 | | 0121 | TS-MSC-00361 | Connecting Gas Main to Existing Gas Main Gas Service Interconnection | 2 | EACH | 1,500.00 | 3,000.00 | 8,700.00 | 17,400.00 | | 0122 | TS-MSC-00362 | Connecting Existing Gas Service Lines to Gas Mains (3/4" HDPE) | 120 | EACH | 900.00 | 108,000.00 | 1.70 | 204.00 | | 0123 | TS-MSC-00412 | Gas Pipe (Open Cut) 2" DR11, HDPE Gas Main (Open Cut) | 400 | LF | 40.00 | 16,000.00 | 23.00 | 9,200.00 | | 0124 | TS-MSC-00413 | Gas Pipe (Directional Drill) 2" DR11, HDPE Gas Main (Dir. Drill) | 550 | LF | 40.00 | 22,000.00 | 30.00 | 16,500.00 | | 0125 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 80 | EACH | 900.00 | 72,000.00 | 2,800.00 | 224,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 16,838,410.80 | | 20,043,057.24 |
|