Proposal:4400033269
Parish:Madison, Richland
Routes:I-20
Description:I-20: RICHLAND-MADISON OVERLAY @ BRIDGES
Type Construction:ASPHALT CONCRETE OVERLAY, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, FIBERGLASS REINFORCED PAVING MAT, AND RELATED WORK.
Estimated Construction Cost:$1,556,476.50
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $3,868,167.48 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $4,903,198.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02020 | Removal of Asphalt Pavement | 256.7 | SQYD | 110.00 | 28,237.00 | 100.00 | 25,670.00 | | 0002 | 502-01-00100 | Asphalt Concrete | 2,539.9 | TON | 600.00 | 1,523,940.00 | 525.00 | 1,333,447.50 | | 0003 | 509-01-00100 | Milling Asphalt Pavement | 22,960 | SQYD | 38.00 | 872,480.00 | 40.00 | 918,400.00 | | 0004 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -948 | CUYD | 20.00 | -18,960.00 | 10.00 | -9,480.00 | | 0005 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 547 | SQYD | 595.00 | 325,465.00 | 720.00 | 393,840.00 | | 0006 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 255,000.00 | 255,000.00 | 750,000.00 | 750,000.00 | | 0007 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.27 | MILE | 154.00 | 503.58 | 300.00 | 981.00 | | 0008 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.112 | MILE | 700.00 | 2,878.40 | 2,500.00 | 10,280.00 | | 0009 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.23 | MILE | 1,200.00 | 9,876.00 | 5,000.00 | 41,150.00 | | 0010 | 713-11-00100 | Portable Changeable Message Signs | 4 | EACH | 8,000.00 | 32,000.00 | 15,000.00 | 60,000.00 | | 0011 | 727-01-00100 | Mobilization | 1 | LUMP | 340,000.00 | 340,000.00 | 490,000.00 | 490,000.00 | | 0012 | 731-02-00100 | Reflectorized Raised Pavement Markers | 653 | EACH | 6.00 | 3,918.00 | 15.00 | 9,795.00 | | 0013 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.96 | MILE | 4,800.00 | 23,808.00 | 9,000.00 | 44,640.00 | | 0014 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.635 | MILE | 1,200.00 | 1,962.00 | 5,000.00 | 8,175.00 | | 0015 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 0.842 | MILE | 9,500.00 | 7,999.00 | 25,000.00 | 21,050.00 | | 0016 | 732-05-00100 | Removal of Existing Markings | 0.842 | MILE | 10,000.00 | 8,420.00 | 25,000.00 | 21,050.00 | | 0017 | 740-01-00100 | Construction Layout | 1 | LUMP | 33,000.00 | 33,000.00 | 100,000.00 | 100,000.00 | | 0018 | NS-502-04200 | Reinforced Paving Mat for Asphalt Concrete Overlay | 22,960 | SQYD | 17.05 | 391,468.00 | 25.00 | 574,000.00 | | 0019 | NS-502-04210 | Asphalt Tack Coat | 5,510 | GAL | 4.75 | 26,172.50 | 20.00 | 110,200.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,868,167.48 | | 4,903,198.50 |
|