Proposal:H.016300.6
Parish:Allen, Jefferson Davis
Routes:US 165
Description:US 165: LA 101 - .42 MI S OF 1ST AVE
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$7,097,596.55
| Rank | License | Bidder | Construction Bid |
| 1 | 00183 | R. E. Heidt Construction Co., LLC | $6,862,365.01 |
| 2 | 34356 | Prairie Contractors LLC | $7,421,799.92 |
| 3 | 12312 | Gilchrist Construction Company, LLC | $8,095,702.93 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - R. E. Heidt Construction Co., LLC | - 2 - Prairie Contractors LLC | - 3 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 214 | LNFT | 75.75 | 16,210.50 | 40.00 | 8,560.00 | 35.00 | 7,490.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 3,880 | LNFT | 12.12 | 47,025.60 | 15.00 | 58,200.00 | 13.00 | 50,440.00 | | 0003 | 202-02-38300 | Removal of Sign and U-Channel Post | 72 | EACH | 30.30 | 2,181.60 | 35.00 | 2,520.00 | 26.00 | 1,872.00 | | 0004 | 203-03-00100 | Embankment | 618.2 | CUYD | 108.00 | 66,765.60 | 75.00 | 46,365.00 | 100.00 | 61,820.00 | | 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 14 | CUYD | 340.00 | 4,760.00 | 500.00 | 7,000.00 | 300.00 | 4,200.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 34,948.7 | TON | 119.00 | 4,158,895.30 | 121.50 | 4,246,267.05 | 150.00 | 5,242,305.00 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 334.4 | TON | 138.00 | 46,147.20 | 252.00 | 84,268.80 | 250.00 | 83,600.00 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 223,527 | SQYD | 2.95 | 659,404.65 | 3.75 | 838,226.25 | 3.75 | 838,226.25 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -9,879 | CUYD | 0.01 | -98.79 | 0.01 | -98.79 | 1.00 | -9,879.00 | | 0010 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 1,298 | SQYD | 175.00 | 227,150.00 | 270.00 | 350,460.00 | 200.00 | 259,600.00 | | 0011 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 17,133 | LNFT | 3.99 | 68,360.67 | 15.00 | 256,995.00 | 3.70 | 63,392.10 | | 0012 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 20,779 | LNFT | 3.99 | 82,908.21 | 15.00 | 311,685.00 | 3.70 | 76,882.30 | | 0013 | 602-03-00100 | Cleaning and Sealing Random Cracks | 12,673 | LNFT | 5.56 | 70,461.88 | 6.50 | 82,374.50 | 5.25 | 66,533.25 | | 0014 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 153 | SQYD | 378.75 | 57,948.75 | 450.00 | 68,850.00 | 340.00 | 52,020.00 | | 0015 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 195 | SQYD | 353.50 | 68,932.50 | 350.00 | 68,250.00 | 290.00 | 56,550.00 | | 0016 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 139 | SQYD | 328.25 | 45,626.75 | 325.00 | 45,175.00 | 250.00 | 34,750.00 | | 0017 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 4,225 | LNFT | 34.34 | 145,086.50 | 45.00 | 190,125.00 | 35.00 | 147,875.00 | | 0018 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 129 | LNFT | 151.50 | 19,543.50 | 185.00 | 23,865.00 | 155.00 | 19,995.00 | | 0019 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 150 | LNFT | 131.30 | 19,695.00 | 160.00 | 24,000.00 | 132.00 | 19,800.00 | | 0020 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 15 | EACH | 4,040.00 | 60,600.00 | 4,750.00 | 71,250.00 | 4,100.00 | 61,500.00 | | 0021 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 3,787.50 | 11,362.50 | 4,500.00 | 13,500.00 | 3,800.00 | 11,400.00 | | 0022 | 707-03-00100 | Combination Concrete Curb and Gutter | 214 | LNFT | 119.18 | 25,504.52 | 110.00 | 23,540.00 | 95.00 | 20,330.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 160,000.00 | 160,000.00 | 5,000.00 | 5,000.00 | 75,000.00 | 75,000.00 | | 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 210 | LNFT | 1.01 | 212.10 | 0.01 | 2.10 | 0.80 | 168.00 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 42.27 | MILE | 681.75 | 28,817.57 | 1.00 | 42.27 | 500.00 | 21,135.00 | | 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 84.6 | MILE | 984.75 | 83,309.85 | 1.00 | 84.60 | 700.00 | 59,220.00 | | 0027 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 39 | EACH | 1.01 | 39.39 | 0.01 | 0.39 | 20.00 | 780.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 360,000.00 | 360,000.00 | 200,000.00 | 200,000.00 | 500,000.00 | 500,000.00 | | 0029 | 729-01-00100 | Sign (Type A) | 510.75 | SQFT | 25.25 | 12,896.44 | 30.00 | 15,322.50 | 7.50 | 3,830.63 | | 0030 | 729-02-00100 | Sign (Type B) | 655.9 | SQFT | 25.25 | 16,561.48 | 30.00 | 19,677.00 | 8.00 | 5,247.20 | | 0031 | 729-16-00300 | Object Marker Assembly (Type 3) | 18 | EACH | 136.35 | 2,454.30 | 165.00 | 2,970.00 | 140.00 | 2,520.00 | | 0032 | 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 72 | EACH | 151.50 | 10,908.00 | 175.00 | 12,600.00 | 225.00 | 16,200.00 | | 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,255 | EACH | 5.05 | 11,387.75 | 6.25 | 14,093.75 | 5.00 | 11,275.00 | | 0034 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 70 | LNFT | 15.15 | 1,060.50 | 18.00 | 1,260.00 | 11.00 | 770.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 34.18 | MILE | 5,403.50 | 184,691.63 | 6,500.00 | 222,170.00 | 4,600.00 | 157,228.00 | | 0036 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 1.022 | MILE | 14,392.50 | 14,709.14 | 17,000.00 | 17,374.00 | 10,000.00 | 10,220.00 | | 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 17.09 | MILE | 2,828.00 | 48,330.52 | 3,450.00 | 58,960.50 | 1,500.00 | 25,635.00 | | 0038 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.246 | MILE | 4,040.00 | 993.84 | 5,000.00 | 1,230.00 | 2,200.00 | 541.20 | | 0039 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 13 | EACH | 277.75 | 3,610.75 | 325.00 | 4,225.00 | 275.00 | 3,575.00 | | 0040 | 735-01-00100 | Mailboxes | 31 | EACH | 1.01 | 31.31 | 10.00 | 310.00 | 1.00 | 31.00 | | 0041 | 735-02-00100 | Mailbox Supports (Single) | 21 | EACH | 303.00 | 6,363.00 | 350.00 | 7,350.00 | 250.00 | 5,250.00 | | 0042 | 735-03-00100 | Mailbox Supports (Double) | 5 | EACH | 303.00 | 1,515.00 | 350.00 | 1,750.00 | 275.00 | 1,375.00 | | 0043 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 16,000.00 | 16,000.00 | 25,000.00 | 25,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,862,365.01 | | 7,421,799.92 | | 8,095,702.93 |
|