Proposal:H.016294.6
Parish:Vernon
Routes:LA 10
Description:LA 10: LA 467-1 TO LOOK OUT RD
Type Construction:CLEARING AND GRUBBING, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$2,248,017.20
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | Gilchrist Construction Company, LLC | $2,179,506.66 |
| 2 | 34356 | Prairie Contractors LLC | $2,411,028.29 |
| 3 | 27239 | Apeck Construction, LLC | $2,433,783.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Gilchrist Construction Company, LLC | - 2 - Prairie Contractors LLC | - 3 - Apeck Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 0.046 | LUMP | 10,000.00 | 10,000.00 | 3,500.00 | 3,500.00 | 3,000.00 | 3,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 6,500.00 | 6,500.00 | 5,500.00 | 5,500.00 | | 0003 | 202-02-04560 | Removal of Bridge Joint (POURED) | 800 | LNFT | 25.00 | 20,000.00 | 15.00 | 12,000.00 | 15.50 | 12,400.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 699.6 | LNFT | 14.00 | 9,794.40 | 16.00 | 11,193.60 | 29.00 | 20,288.40 | | 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 677 | CUYD | 100.00 | 67,700.00 | 63.00 | 42,651.00 | 62.00 | 41,974.00 | | 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 12 | EACH | 160.00 | 1,920.00 | 200.00 | 2,400.00 | 255.00 | 3,060.00 | | 0007 | 204-06-00100 | Temporary Silt Fencing | 1,029 | LNFT | 2.25 | 2,315.25 | 5.00 | 5,145.00 | 7.00 | 7,203.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 573 | CUYD | 50.00 | 28,650.00 | 200.00 | 114,600.00 | 198.00 | 113,454.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 5,721.3 | TON | 144.00 | 823,867.20 | 125.00 | 715,162.50 | 182.00 | 1,041,276.60 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 225.5 | TON | 330.00 | 74,415.00 | 270.00 | 60,885.00 | 204.00 | 46,002.00 | | 0011 | 509-01-00100 | Milling Asphalt Pavement | 24,999 | SQYD | 2.75 | 68,747.25 | 4.25 | 106,245.75 | 2.15 | 53,747.85 | | 0012 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -965 | CUYD | 1.00 | -965.00 | 0.01 | -9.65 | 0.01 | -9.65 | | 0013 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 3,194 | SQYD | 180.00 | 574,920.00 | 233.00 | 744,202.00 | 232.00 | 741,008.00 | | 0014 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 160 | LNFT | 34.00 | 5,440.00 | 12.00 | 1,920.00 | 43.00 | 6,880.00 | | 0015 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 160 | LNFT | 34.00 | 5,440.00 | 8.00 | 1,280.00 | 5.00 | 800.00 | | 0016 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 96 | LNFT | 305.00 | 29,280.00 | 360.00 | 34,560.00 | 340.00 | 32,640.00 | | 0017 | 701-02-02200 | Cross Drain Pipe Arch (54" Equiv. RCPA or 60" Equiv. CMPA) | 56 | LNFT | 475.00 | 26,600.00 | 525.00 | 29,400.00 | 497.00 | 27,832.00 | | 0018 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 152 | LNFT | 11.00 | 1,672.00 | 12.00 | 1,824.00 | 6.00 | 912.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 150 | LNFT | 36.00 | 5,400.00 | 45.00 | 6,750.00 | 35.00 | 5,250.00 | | 0020 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 100 | LNFT | 71.00 | 7,100.00 | 90.00 | 9,000.00 | 80.00 | 8,000.00 | | 0021 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 135.00 | 27,000.00 | 175.00 | 35,000.00 | 140.00 | 28,000.00 | | 0022 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 8 | EACH | 4,100.00 | 32,800.00 | 5,500.00 | 44,000.00 | 4,000.00 | 32,000.00 | | 0023 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 50 | SQYD | 127.00 | 6,350.00 | 150.00 | 7,500.00 | 129.00 | 6,450.00 | | 0024 | 711-04-00100 | Geotextile Fabric | 50 | SQYD | 5.00 | 250.00 | 12.00 | 600.00 | 9.00 | 450.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 75,000.00 | 75,000.00 | 14,000.00 | 14,000.00 | | 0026 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 36 | LNFT | 1.00 | 36.00 | 0.01 | 0.36 | 1.00 | 36.00 | | 0027 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.986 | MILE | 150.00 | 747.90 | 650.00 | 3,240.90 | 800.00 | 3,988.80 | | 0028 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.731 | MILE | 675.00 | 1,168.43 | 1.00 | 1.73 | 800.00 | 1,384.80 | | 0029 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 16.983 | MILE | 675.00 | 11,463.53 | 1.00 | 16.98 | 800.00 | 13,586.40 | | 0030 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 6 | EACH | 50.00 | 300.00 | 0.01 | 0.06 | 55.00 | 330.00 | | 0031 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 50.00 | 300.00 | 0.01 | 0.06 | 55.00 | 330.00 | | 0032 | 716-01-00100 | Mulch (Vegetative) | 1.3 | TON | 900.00 | 1,170.00 | 1,750.00 | 2,275.00 | 2,000.00 | 2,600.00 | | 0033 | 717-01-00100 | Seeding | 38 | LB | 26.00 | 988.00 | 40.00 | 1,520.00 | 45.00 | 1,710.00 | | 0034 | 718-01-00100 | Fertilizer | 622 | LB | 1.00 | 622.00 | 1.00 | 622.00 | 1.00 | 622.00 | | 0035 | 726-01-00100 | Bedding Material | 36.3 | CUYD | 160.00 | 5,808.00 | 200.00 | 7,260.00 | 150.00 | 5,445.00 | | 0036 | 727-01-00100 | Mobilization | 1 | LUMP | 164,000.00 | 164,000.00 | 200,000.00 | 200,000.00 | 31,250.00 | 31,250.00 | | 0037 | 729-16-00200 | Object Marker Assembly (Type 2) | 6 | EACH | 120.00 | 720.00 | 150.00 | 900.00 | 100.00 | 600.00 | | 0038 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 140.00 | 1,120.00 | 175.00 | 1,400.00 | 100.00 | 800.00 | | 0039 | 731-02-00100 | Reflectorized Raised Pavement Markers | 592 | EACH | 6.00 | 3,552.00 | 7.00 | 4,144.00 | 5.00 | 2,960.00 | | 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 473 | LNFT | 16.00 | 7,568.00 | 20.00 | 9,460.00 | 17.00 | 8,041.00 | | 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.661 | MILE | 5,600.00 | 31,701.60 | 7,500.00 | 42,457.50 | 6,500.00 | 36,796.50 | | 0042 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.019 | MILE | 7,200.00 | 136.80 | 17,500.00 | 332.50 | 17,000.00 | 323.00 | | 0043 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.577 | MILE | 2,900.00 | 1,673.30 | 4,000.00 | 2,308.00 | 3,300.00 | 1,904.10 | | 0044 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 260.00 | 520.00 | 350.00 | 700.00 | 300.00 | 600.00 | | 0045 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 310.00 | 620.00 | 400.00 | 800.00 | 350.00 | 700.00 | | 0046 | 732-05-00100 | Removal of Existing Markings | 0.072 | MILE | 5,000.00 | 360.00 | 7,500.00 | 540.00 | 5,800.00 | 417.60 | | 0047 | 736-01-00100 | Trenching and Backfilling | 37 | LNFT | 15.00 | 555.00 | 50.00 | 1,850.00 | 60.00 | 2,220.00 | | 0048 | 736-09-00100 | Loop Detector | 140 | LNFT | 81.00 | 11,340.00 | 60.00 | 8,400.00 | 170.00 | 23,800.00 | | 0049 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 1,600.00 | 1,600.00 | 2,750.00 | 2,750.00 | 800.00 | 800.00 | | 0050 | 736-11-00100 | Conduit (1" HDPE, Schedule 80) | 37 | LNFT | 20.00 | 740.00 | 20.00 | 740.00 | 60.00 | 2,220.00 | | 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,000.00 | 18,000.00 | 8,000.00 | 8,000.00 | 11,000.00 | 11,000.00 | | 0052 | 815-03-00300 | Joint Seal (Poured) | 800 | LNFT | 30.00 | 24,000.00 | 50.00 | 40,000.00 | 34.00 | 27,200.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,179,506.66 | | 2,411,028.29 | | 2,433,783.40 |
|