Search


Bid Tabulations for the Letting of 3/11/2026 LA DOTD Headquarters

Proposal:H.015347.6
Parish:Franklin
Routes:LA 130, LA 4
Description:LA 4 AND LA 130 ASPHALT OVERLAYS
Type Construction:MILLING ASPHALT CONCRETE, ASPHALT SURFACE TREATMENT, PAVEMENT PATCHMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,899,390.95
Rank License BidderConstruction Bid
112312Gilchrist Construction Company, LLC$2,999,361.95
205789D & J CONSTRUCTION CO., LLC$3,196,757.90
312487Diamond B Construction Co., L.L.C.$3,208,488.81


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Gilchrist Construction Company, LLC
- 2 -
D & J CONSTRUCTION CO., LLC
- 3 -
Diamond B Construction Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-02-00010Removal of SPECIALTY MAILBOX4     EACH1,000.004,000.00750.003,000.003,500.0014,000.00
0002202-02-14500Removal of Guard Rail 638     LNFT14.008,932.0025.0015,950.0015.009,570.00
0003202-02-32100Removal of Pipe (Cross Drain) (Cross Drain) 36" CMP, 24" CMP249     LNFT37.009,213.0040.009,960.0022.005,478.00
0004202-02-32180Removal of Pipe Headwalls 1     EACH1,600.001,600.002,000.002,000.007,500.007,500.00
0005203-01-00100General Excavation 47     CUYD100.004,700.0035.001,645.00300.0014,100.00
0006203-07-00100Borrow (Vehicular Measurement) 599     CUYD80.0047,920.0065.0038,935.0042.0025,158.00
0007204-02-00100Temporary Hay Bales 48     EACH35.001,680.0030.001,440.0025.001,200.00
0008401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 757     CUYD65.0049,205.0095.0071,915.00195.00147,615.00
0009502-01-00100Asphalt Concrete 6,493.3   TON155.001,006,461.50195.001,266,193.50165.001,071,394.50
0010502-01-00200Asphalt Concrete, Drives, Turnouts and Miscellaneous 1,489.7   TON100.00148,970.00265.00394,770.50260.00387,322.00
0011507-01-00100Asphalt Material (CRS-2P Emulsion) 7,937     GAL4.5035,716.506.0047,622.004.5035,716.50
0012507-02-00300Aggregate (S3) 25,603     SQYD2.2557,606.753.0076,809.002.0051,206.00
0013509-01-00100Milling Asphalt Pavement 57,496     SQYD5.00287,480.004.00229,984.005.00287,480.00
0014509-02-00100Contractor Retained Reclaimed Asphalt Pavement -2,396     CUYD1.00-2,396.001.00-2,396.001.00-2,396.00
0015510-01-00400Pavement Patching (24" Minimum Thickness) 682     SQYD315.00214,830.00400.00272,800.00275.00187,550.00
0016701-01-01001Cross Drain Pipe (24" RCP) 156     LNFT300.0046,800.00300.0046,800.00310.0048,360.00
0017701-01-01041Cross Drain Pipe (36" RCP) 144     LNFT400.0057,600.00400.0057,600.00385.0055,440.00
0018701-17-00100Trench Excavation Safety Protection (Depth >5 feet) 150     LNFT6.00900.006.00900.0015.002,250.00
0019704-01-01000Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 100     LNFT82.008,200.00100.0010,000.0080.008,000.00
0020704-01-01020Guard Rail (Single Thrie Beam) (6'-3" post spacing) 188     LNFT135.0025,380.00150.0028,200.00135.0025,380.00
0021704-03-00200Blocked Out Guard Rail - 31", (6'-3" Post Spacing) 137.5   LNFT37.005,087.5040.005,500.0035.004,812.50
0022704-07-00200Guard Rail Transitions (Double Thrie Beam) 100     LNFT137.0013,700.00155.0015,500.00140.0014,000.00
0023704-10-00120Guard Rail End Treatment, MASH, (TL-3 Flared) 8     EACH3,800.0030,400.004,000.0032,000.004,000.0032,000.00
0024711-01-04000Riprap (55 lb, 18" Thick) 44     SQYD200.008,800.00175.007,700.00175.007,700.00
0025711-04-00100Geotextile Fabric 44     SQYD3.00132.006.00264.0010.00440.00
0026713-01-00100Temporary Signs and Barricades 1     LUMP188,000.00188,000.00100,000.00100,000.00112,000.00112,000.00
0027713-02-00300Temporary Pavement Markings (8" Width) 176     LNFT0.60105.600.1526.400.1526.40
0028713-02-00500Temporary Pavement Markings (24" Width) 114     LNFT1.00114.000.5057.000.5562.70
0029713-03-01000Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 9.889 MILE200.001,977.80300.002,966.70154.001,522.91
0030713-03-02000Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 7.04  MILE900.006,336.00600.004,224.00650.004,576.00
0031713-04-01000Temporary Pavement Markings (Solid Line) (4" Width) 28.383 MILE1,100.0031,221.30900.0025,544.70950.0026,963.85
0032713-05-00200Temporary Pavement Legends & Symbols (Arrow - Double) 2     EACH55.00110.0025.0050.0025.0050.00
0033713-05-00220Temporary Pavement Legends & Symbols (Arrow - Left Turn) 2     EACH55.00110.0025.0050.0025.0050.00
0034713-06-00200Temporary Reflectorized Raised Pavement Markers (Tabs) 481     EACH3.001,443.003.001,443.002.501,202.50
0035720-01-01000Erosion Control System (Slope Protection) (Type A) 960     SQYD6.005,760.004.003,840.002.252,160.00
0036724-02-00100Rumble Strips (Shoulder/Edge) 3.636 MILE1,300.004,726.80600.002,181.601,100.003,999.60
0037726-01-00100Bedding Material 130.8   CUYD200.0026,160.00200.0026,160.00200.0026,160.00
0038727-01-00100Mobilization 1     LUMP295,000.00295,000.00200,000.00200,000.00315,000.00315,000.00
0039729-16-00200Object Marker Assembly (Type 2) 8     EACH125.001,000.00120.00960.00120.00960.00
0040729-16-00300Object Marker Assembly (Type 3) 8     EACH135.001,080.00150.001,200.00135.001,080.00
0041731-02-00100Reflectorized Raised Pavement Markers 651     EACH6.003,906.006.003,906.006.003,906.00
0042731-03-00100Removal of Raised Pavement Markers 0.025 MILE100,000.002,500.0020,000.00500.0055,000.001,375.00
0043732-01-01040Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 176     LNFT4.00704.005.00880.005.00880.00
0044732-01-01080Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) 114     LNFT16.001,824.0015.001,710.0015.001,710.00
0045732-02-02000Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 6.677 MILE5,700.0038,058.905,000.0033,385.004,750.0031,715.75
0046732-02-02020Plastic Pavement Striping (Solid Line) (6" Width) (Thermoplastic 90 mil) 4.177 MILE6,700.0027,985.906,000.0025,062.005,100.0021,302.70
0047732-03-02000Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 1.259 MILE3,200.004,028.801,500.001,888.501,250.001,573.75
0048732-03-02020Plastic Pavement Striping (Broken Line) (6" Width) (Thermoplastic 90 mil) 1.631 MILE3,600.005,871.602,000.003,262.001,750.002,854.25
0049732-04-01040Plastic Pavement Legends and Symbols (Arrow - Double) 2     EACH550.001,100.00500.001,000.00400.00800.00
0050732-04-01080Plastic Pavement Legends and Symbols (Arrow - Left Turn) 2     EACH550.001,100.00475.00950.00400.00800.00
0051735-01-00100Mailboxes 37     EACH35.001,295.0030.001,110.001.0037.00
0052735-02-00100Mailbox Supports (Single) 33     EACH300.009,900.00325.0010,725.00300.009,900.00
0053735-03-00100Mailbox Supports (Double) 2     EACH550.001,100.00425.00850.00300.00600.00
0054740-01-00100Construction Layout 1     LUMP50,500.0050,500.0025,000.0025,000.0085,000.0085,000.00
0055805-01-01000Class A1 Concrete (Headwalls) 36" RCP6.08  CUYD6,000.0036,480.005,000.0030,400.003,100.0018,848.00
0056806-01-00100Deformed Reinforcing Steel 389     LB5.001,945.006.002,334.0013.105,095.90
0057NS-719-00002Tree Trimming APPROX. 2.693 ACRES1     LUMP175,000.00175,000.0050,000.0050,000.0085,000.0085,000.00
           
  CONTRACTOR TOTAL   2,999,361.95 3,196,757.90 3,208,488.81