Proposal:H.015347.6
Parish:Franklin
Routes:LA 130, LA 4
Description:LA 4 AND LA 130 ASPHALT OVERLAYS
Type Construction:MILLING ASPHALT CONCRETE, ASPHALT SURFACE TREATMENT, PAVEMENT PATCHMENT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,899,390.95
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | Gilchrist Construction Company, LLC | $2,999,361.95 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $3,196,757.90 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $3,208,488.81 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Gilchrist Construction Company, LLC | - 2 - D & J CONSTRUCTION CO., LLC | - 3 - Diamond B Construction Co., L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of SPECIALTY MAILBOX | 4 | EACH | 1,000.00 | 4,000.00 | 750.00 | 3,000.00 | 3,500.00 | 14,000.00 | | 0002 | 202-02-14500 | Removal of Guard Rail | 638 | LNFT | 14.00 | 8,932.00 | 25.00 | 15,950.00 | 15.00 | 9,570.00 | | 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (Cross Drain) 36" CMP, 24" CMP | 249 | LNFT | 37.00 | 9,213.00 | 40.00 | 9,960.00 | 22.00 | 5,478.00 | | 0004 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 1,600.00 | 1,600.00 | 2,000.00 | 2,000.00 | 7,500.00 | 7,500.00 | | 0005 | 203-01-00100 | General Excavation | 47 | CUYD | 100.00 | 4,700.00 | 35.00 | 1,645.00 | 300.00 | 14,100.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 599 | CUYD | 80.00 | 47,920.00 | 65.00 | 38,935.00 | 42.00 | 25,158.00 | | 0007 | 204-02-00100 | Temporary Hay Bales | 48 | EACH | 35.00 | 1,680.00 | 30.00 | 1,440.00 | 25.00 | 1,200.00 | | 0008 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 757 | CUYD | 65.00 | 49,205.00 | 95.00 | 71,915.00 | 195.00 | 147,615.00 | | 0009 | 502-01-00100 | Asphalt Concrete | 6,493.3 | TON | 155.00 | 1,006,461.50 | 195.00 | 1,266,193.50 | 165.00 | 1,071,394.50 | | 0010 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,489.7 | TON | 100.00 | 148,970.00 | 265.00 | 394,770.50 | 260.00 | 387,322.00 | | 0011 | 507-01-00100 | Asphalt Material (CRS-2P Emulsion) | 7,937 | GAL | 4.50 | 35,716.50 | 6.00 | 47,622.00 | 4.50 | 35,716.50 | | 0012 | 507-02-00300 | Aggregate (S3) | 25,603 | SQYD | 2.25 | 57,606.75 | 3.00 | 76,809.00 | 2.00 | 51,206.00 | | 0013 | 509-01-00100 | Milling Asphalt Pavement | 57,496 | SQYD | 5.00 | 287,480.00 | 4.00 | 229,984.00 | 5.00 | 287,480.00 | | 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,396 | CUYD | 1.00 | -2,396.00 | 1.00 | -2,396.00 | 1.00 | -2,396.00 | | 0015 | 510-01-00400 | Pavement Patching (24" Minimum Thickness) | 682 | SQYD | 315.00 | 214,830.00 | 400.00 | 272,800.00 | 275.00 | 187,550.00 | | 0016 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 156 | LNFT | 300.00 | 46,800.00 | 300.00 | 46,800.00 | 310.00 | 48,360.00 | | 0017 | 701-01-01041 | Cross Drain Pipe (36" RCP) | 144 | LNFT | 400.00 | 57,600.00 | 400.00 | 57,600.00 | 385.00 | 55,440.00 | | 0018 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 150 | LNFT | 6.00 | 900.00 | 6.00 | 900.00 | 15.00 | 2,250.00 | | 0019 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 100 | LNFT | 82.00 | 8,200.00 | 100.00 | 10,000.00 | 80.00 | 8,000.00 | | 0020 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 188 | LNFT | 135.00 | 25,380.00 | 150.00 | 28,200.00 | 135.00 | 25,380.00 | | 0021 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 137.5 | LNFT | 37.00 | 5,087.50 | 40.00 | 5,500.00 | 35.00 | 4,812.50 | | 0022 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 137.00 | 13,700.00 | 155.00 | 15,500.00 | 140.00 | 14,000.00 | | 0023 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 8 | EACH | 3,800.00 | 30,400.00 | 4,000.00 | 32,000.00 | 4,000.00 | 32,000.00 | | 0024 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 44 | SQYD | 200.00 | 8,800.00 | 175.00 | 7,700.00 | 175.00 | 7,700.00 | | 0025 | 711-04-00100 | Geotextile Fabric | 44 | SQYD | 3.00 | 132.00 | 6.00 | 264.00 | 10.00 | 440.00 | | 0026 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 188,000.00 | 188,000.00 | 100,000.00 | 100,000.00 | 112,000.00 | 112,000.00 | | 0027 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 176 | LNFT | 0.60 | 105.60 | 0.15 | 26.40 | 0.15 | 26.40 | | 0028 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 114 | LNFT | 1.00 | 114.00 | 0.50 | 57.00 | 0.55 | 62.70 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 9.889 | MILE | 200.00 | 1,977.80 | 300.00 | 2,966.70 | 154.00 | 1,522.91 | | 0030 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.04 | MILE | 900.00 | 6,336.00 | 600.00 | 4,224.00 | 650.00 | 4,576.00 | | 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 28.383 | MILE | 1,100.00 | 31,221.30 | 900.00 | 25,544.70 | 950.00 | 26,963.85 | | 0032 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 2 | EACH | 55.00 | 110.00 | 25.00 | 50.00 | 25.00 | 50.00 | | 0033 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 2 | EACH | 55.00 | 110.00 | 25.00 | 50.00 | 25.00 | 50.00 | | 0034 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 481 | EACH | 3.00 | 1,443.00 | 3.00 | 1,443.00 | 2.50 | 1,202.50 | | 0035 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 960 | SQYD | 6.00 | 5,760.00 | 4.00 | 3,840.00 | 2.25 | 2,160.00 | | 0036 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 3.636 | MILE | 1,300.00 | 4,726.80 | 600.00 | 2,181.60 | 1,100.00 | 3,999.60 | | 0037 | 726-01-00100 | Bedding Material | 130.8 | CUYD | 200.00 | 26,160.00 | 200.00 | 26,160.00 | 200.00 | 26,160.00 | | 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 295,000.00 | 295,000.00 | 200,000.00 | 200,000.00 | 315,000.00 | 315,000.00 | | 0039 | 729-16-00200 | Object Marker Assembly (Type 2) | 8 | EACH | 125.00 | 1,000.00 | 120.00 | 960.00 | 120.00 | 960.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 135.00 | 1,080.00 | 150.00 | 1,200.00 | 135.00 | 1,080.00 | | 0041 | 731-02-00100 | Reflectorized Raised Pavement Markers | 651 | EACH | 6.00 | 3,906.00 | 6.00 | 3,906.00 | 6.00 | 3,906.00 | | 0042 | 731-03-00100 | Removal of Raised Pavement Markers | 0.025 | MILE | 100,000.00 | 2,500.00 | 20,000.00 | 500.00 | 55,000.00 | 1,375.00 | | 0043 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 176 | LNFT | 4.00 | 704.00 | 5.00 | 880.00 | 5.00 | 880.00 | | 0044 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 114 | LNFT | 16.00 | 1,824.00 | 15.00 | 1,710.00 | 15.00 | 1,710.00 | | 0045 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.677 | MILE | 5,700.00 | 38,058.90 | 5,000.00 | 33,385.00 | 4,750.00 | 31,715.75 | | 0046 | 732-02-02020 | Plastic Pavement Striping (Solid Line) (6" Width) (Thermoplastic 90 mil) | 4.177 | MILE | 6,700.00 | 27,985.90 | 6,000.00 | 25,062.00 | 5,100.00 | 21,302.70 | | 0047 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.259 | MILE | 3,200.00 | 4,028.80 | 1,500.00 | 1,888.50 | 1,250.00 | 1,573.75 | | 0048 | 732-03-02020 | Plastic Pavement Striping (Broken Line) (6" Width) (Thermoplastic 90 mil) | 1.631 | MILE | 3,600.00 | 5,871.60 | 2,000.00 | 3,262.00 | 1,750.00 | 2,854.25 | | 0049 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 550.00 | 1,100.00 | 500.00 | 1,000.00 | 400.00 | 800.00 | | 0050 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 550.00 | 1,100.00 | 475.00 | 950.00 | 400.00 | 800.00 | | 0051 | 735-01-00100 | Mailboxes | 37 | EACH | 35.00 | 1,295.00 | 30.00 | 1,110.00 | 1.00 | 37.00 | | 0052 | 735-02-00100 | Mailbox Supports (Single) | 33 | EACH | 300.00 | 9,900.00 | 325.00 | 10,725.00 | 300.00 | 9,900.00 | | 0053 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 550.00 | 1,100.00 | 425.00 | 850.00 | 300.00 | 600.00 | | 0054 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,500.00 | 50,500.00 | 25,000.00 | 25,000.00 | 85,000.00 | 85,000.00 | | 0055 | 805-01-01000 | Class A1 Concrete (Headwalls) 36" RCP | 6.08 | CUYD | 6,000.00 | 36,480.00 | 5,000.00 | 30,400.00 | 3,100.00 | 18,848.00 | | 0056 | 806-01-00100 | Deformed Reinforcing Steel | 389 | LB | 5.00 | 1,945.00 | 6.00 | 2,334.00 | 13.10 | 5,095.90 | | 0057 | NS-719-00002 | Tree Trimming APPROX. 2.693 ACRES | 1 | LUMP | 175,000.00 | 175,000.00 | 50,000.00 | 50,000.00 | 85,000.00 | 85,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,999,361.95 | | 3,196,757.90 | | 3,208,488.81 |
|