Proposal:H.014872.6
Parish:Union
Routes:LA 3281, LA 348
Description:LA 348 AND LA 3281: REPAIRS
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, IN-PLACE CEMENT STABILIZED BASE COURSE, ASPHALT CONCRETE, OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,619,687.64
| Rank | License | Bidder | Construction Bid |
| 1 | 12487 | Diamond B Construction Co., L.L.C. | $3,932,982.56 |
| 2 | 05789 | D & J CONSTRUCTION CO., LLC | $4,502,193.87 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Diamond B Construction Co., L.L.C. | - 2 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.025 | LUMP | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | | 0002 | 201-01-00200 | Clearing and Grubbing (Selective) | 6.316 | LUMP | 85,000.00 | 85,000.00 | 100,000.00 | 100,000.00 | | 0003 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 35,000.00 | 35,000.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 245 | SQYD | 25.00 | 6,125.00 | 35.00 | 8,575.00 | | 0005 | 202-02-06102 | Removal of Incidental Concrete Paving | 375 | SQYD | 45.00 | 16,875.00 | 15.00 | 5,625.00 | | 0006 | 202-02-14500 | Removal of Guard Rail | 490 | LNFT | 14.00 | 6,860.00 | 30.00 | 14,700.00 | | 0007 | 202-02-32180 | Removal of Pipe Headwalls | 2 | EACH | 15,000.00 | 30,000.00 | 2,500.00 | 5,000.00 | | 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,243 | CUYD | 55.00 | 68,365.00 | 50.00 | 62,150.00 | | 0009 | 203-10-00100 | Cleaning Existing Ditches | 100 | LNFT | 20.00 | 2,000.00 | 10.00 | 1,000.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 552 | LNFT | 9.00 | 4,968.00 | 6.00 | 3,312.00 | | 0011 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 5,446 | SQYD | 20.00 | 108,920.00 | 30.00 | 163,380.00 | | 0012 | 303-02-00100 | Removal of Existing Patches | 50 | SQYD | 56.00 | 2,800.00 | 25.00 | 1,250.00 | | 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,544 | CUYD | 205.00 | 316,520.00 | 200.00 | 308,800.00 | | 0014 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 77.2 | CUYD | 150.00 | 11,580.00 | 150.00 | 11,580.00 | | 0015 | 502-01-00100 | Asphalt Concrete | 11,149.7 | TON | 168.00 | 1,873,149.60 | 195.00 | 2,174,191.50 | | 0016 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 796.9 | TON | 275.00 | 219,147.50 | 195.00 | 155,395.50 | | 0017 | 509-01-00100 | Milling Asphalt Pavement | 2,631.778 | SQYD | 17.00 | 44,740.23 | 15.00 | 39,476.67 | | 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -73 | CUYD | 1.00 | -73.00 | 1.00 | -73.00 | | 0019 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,009 | SQYD | 185.00 | 186,665.00 | 320.00 | 322,880.00 | | 0020 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 60 | LNFT | 300.00 | 18,000.00 | 250.00 | 15,000.00 | | 0021 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 48 | LNFT | 650.00 | 31,200.00 | 700.00 | 33,600.00 | | 0022 | 701-02-02120 | Cross Drain Pipe Arch (42" Equiv. RCPA or 48" Equiv. CMPA) | 48 | LNFT | 400.00 | 19,200.00 | 500.00 | 24,000.00 | | 0023 | 701-02-02240 | Cross Drain Pipe Arch (72" Equiv. RCPA or 84" Equiv. CMPA) | 60 | LNFT | 750.00 | 45,000.00 | 1,000.00 | 60,000.00 | | 0024 | 701-15-00100 | Concrete Collar | 8 | EACH | 2,500.00 | 20,000.00 | 2,500.00 | 20,000.00 | | 0025 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 216 | LNFT | 2.00 | 432.00 | 5.00 | 1,080.00 | | 0026 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 5,500.00 | 5,500.00 | 4,000.00 | 4,000.00 | | 0027 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 311.3 | LNFT | 140.00 | 43,582.00 | 140.00 | 43,582.00 | | 0028 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 81.3 | LNFT | 35.00 | 2,845.50 | 40.00 | 3,252.00 | | 0029 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 1 | EACH | 3,900.00 | 3,900.00 | 4,000.00 | 4,000.00 | | 0030 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 3,900.00 | 11,700.00 | 4,200.00 | 12,600.00 | | 0031 | 706-02-00200 | Concrete Drive (6" Thick) | 244.8 | SQYD | 155.00 | 37,944.00 | 150.00 | 36,720.00 | | 0032 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 91 | SQYD | 175.00 | 15,925.00 | 200.00 | 18,200.00 | | 0033 | 711-01-05000 | Riprap (130 lb, 24" Thick) | 50 | SQYD | 265.00 | 13,250.00 | 275.00 | 13,750.00 | | 0034 | 711-04-00100 | Geotextile Fabric | 141 | SQYD | 10.00 | 1,410.00 | 7.00 | 987.00 | | 0035 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 85,000.00 | 85,000.00 | 160,000.00 | 160,000.00 | | 0036 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 11.17 | MILE | 154.00 | 1,720.18 | 300.00 | 3,351.00 | | 0037 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.519 | MILE | 650.00 | 2,287.35 | 600.00 | 2,111.40 | | 0038 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 40.642 | MILE | 950.00 | 38,609.90 | 900.00 | 36,577.80 | | 0039 | 716-01-00100 | Mulch (Vegetative) | 6 | TON | 950.00 | 5,700.00 | 1,200.00 | 7,200.00 | | 0040 | 717-01-00100 | Seeding | 175 | LB | 16.50 | 2,887.50 | 22.00 | 3,850.00 | | 0041 | 718-01-00100 | Fertilizer | 2,909 | LB | 1.00 | 2,909.00 | 1.00 | 2,909.00 | | 0042 | 726-01-00100 | Bedding Material | 145.6 | CUYD | 190.00 | 27,664.00 | 185.00 | 26,936.00 | | 0043 | 727-01-00100 | Mobilization | 1 | LUMP | 368,000.00 | 368,000.00 | 420,000.00 | 420,000.00 | | 0044 | 729-16-00200 | Object Marker Assembly (Type 2) | 18 | EACH | 120.00 | 2,160.00 | 125.00 | 2,250.00 | | 0045 | 729-16-00300 | Object Marker Assembly (Type 3) | 9 | EACH | 140.00 | 1,260.00 | 145.00 | 1,305.00 | | 0046 | 731-02-00100 | Reflectorized Raised Pavement Markers | 862 | EACH | 6.00 | 5,172.00 | 8.00 | 6,896.00 | | 0047 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 14.058 | MILE | 5,000.00 | 70,290.00 | 6,000.00 | 84,348.00 | | 0048 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.173 | MILE | 1,600.00 | 1,876.80 | 2,000.00 | 2,346.00 | | 0049 | 735-01-00100 | Mailboxes | 15 | EACH | 1.00 | 15.00 | 40.00 | 600.00 | | 0050 | 735-02-00100 | Mailbox Supports (Single) | 13 | EACH | 350.00 | 4,550.00 | 350.00 | 4,550.00 | | 0051 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 350.00 | 350.00 | 450.00 | 450.00 | | 0052 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0053 | 741-35-00100 | Adjust Valve or Meter Box | 1 | EACH | 4,000.00 | 4,000.00 | 3,500.00 | 3,500.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,932,982.56 | | 4,502,193.87 |
|