Proposal:H.016602.6
Parish:Jefferson
Routes:LA 1
Description:LA 1: PLUM LN - CAMINADA BAY BRIDGE
Type Construction:GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$3,624,642.80
| Rank | License | Bidder | Construction Bid |
| 1 | 62139 | Huey P. Stockstill, LLC | $3,394,676.12 |
| 2 | 06276 | Barriere Construction Co., LLC | $3,647,222.00 |
| 3 | 46747 | Triumph Construction, LLC | $4,511,762.44 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $5,187,285.10 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Huey P. Stockstill, LLC | - 2 - Barriere Construction Co., LLC | - 3 - Triumph Construction, LLC | - 4 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 335 | SQYD | 22.00 | 7,370.00 | 36.00 | 12,060.00 | 6.00 | 2,010.00 | 100.00 | 33,500.00 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,781 | SQYD | 40.00 | 71,240.00 | 36.00 | 64,116.00 | 37.00 | 65,897.00 | 45.00 | 80,145.00 | | 0003 | 202-02-06102 | Removal of Incidental Concrete Paving | 199 | SQYD | 30.00 | 5,970.00 | 55.00 | 10,945.00 | 11.00 | 2,189.00 | 50.00 | 9,950.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 150 | LNFT | 33.00 | 4,950.00 | 28.00 | 4,200.00 | 30.00 | 4,500.00 | 30.00 | 4,500.00 | | 0005 | 202-02-32120 | Removal of Pipe (Side Drain) 12" RCP | 107 | LNFT | 125.00 | 13,375.00 | 28.00 | 2,996.00 | 13.00 | 1,391.00 | 150.00 | 16,050.00 | | 0006 | 202-02-32120 | Removal of Pipe (Side Drain) 18" METAL | 14 | LNFT | 125.00 | 1,750.00 | 32.00 | 448.00 | 93.00 | 1,302.00 | 150.00 | 2,100.00 | | 0007 | 202-03-00010 | Relocation TRASH BINS PRIOR TO SWALE CONSTRUCTION | 5 | EACH | 200.00 | 1,000.00 | 100.00 | 500.00 | 122.00 | 610.00 | 750.00 | 3,750.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 75,000.00 | 75,000.00 | 65,000.00 | 65,000.00 | 24,640.00 | 24,640.00 | 250,000.00 | 250,000.00 | | 0009 | 203-07-00100 | Borrow (Vehicular Measurement) | 165 | CUYD | 165.00 | 27,225.00 | 90.00 | 14,850.00 | 124.00 | 20,460.00 | 200.00 | 33,000.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 11,189 | LNFT | 2.25 | 25,175.25 | 2.25 | 25,175.25 | 3.00 | 33,567.00 | 3.00 | 33,567.00 | | 0011 | 302-01-00700 | Class II Base Course (Crushed Stone or Recycled Portland Cement Concrete) | 165.2 | CUYD | 180.00 | 29,736.00 | 250.00 | 41,300.00 | 79.00 | 13,050.80 | 225.00 | 37,170.00 | | 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 101.2 | CUYD | 295.00 | 29,854.00 | 75.00 | 7,590.00 | 79.00 | 7,994.80 | 200.00 | 20,240.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 11,526 | TON | 140.00 | 1,613,640.00 | 155.00 | 1,786,530.00 | 228.00 | 2,627,928.00 | 195.00 | 2,247,570.00 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,461.9 | TON | 270.00 | 394,713.00 | 285.00 | 416,641.50 | 395.00 | 577,450.50 | 325.00 | 475,117.50 | | 0015 | 509-01-00100 | Milling Asphalt Pavement | 5,525 | SQYD | 6.50 | 35,912.50 | 8.50 | 46,962.50 | 23.00 | 127,075.00 | 15.00 | 82,875.00 | | 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -236 | CUYD | 0.01 | -2.36 | 0.01 | -2.36 | 0.06 | -14.16 | 0.05 | -11.80 | | 0017 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 315 | SQYD | 150.00 | 47,250.00 | 225.00 | 70,875.00 | 485.00 | 152,775.00 | 300.00 | 94,500.00 | | 0018 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 2,742 | INLF | 0.30 | 822.60 | 0.90 | 2,467.80 | 2.00 | 5,484.00 | 1.00 | 2,742.00 | | 0019 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 32,768 | INLF | 1.25 | 40,960.00 | 1.00 | 32,768.00 | 1.00 | 32,768.00 | 1.20 | 39,321.60 | | 0020 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 56 | LNFT | 400.00 | 22,400.00 | 335.00 | 18,760.00 | 82.00 | 4,592.00 | 450.00 | 25,200.00 | | 0021 | 701-06-00020 | Side Drain Pipe Arch (18" Equiv. RCPA) | 577 | LNFT | 225.00 | 129,825.00 | 140.00 | 80,780.00 | 66.00 | 38,082.00 | 275.00 | 158,675.00 | | 0022 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) TYPE C GRATE | 3 | EACH | 4,500.00 | 13,500.00 | 3,000.00 | 9,000.00 | 2,264.00 | 6,792.00 | 5,000.00 | 15,000.00 | | 0023 | 702-03-00100 | Catch Basins (CB-01) TYPE C GRATE | 2 | EACH | 7,500.00 | 15,000.00 | 6,500.00 | 13,000.00 | 3,320.00 | 6,640.00 | 7,500.00 | 15,000.00 | | 0024 | 702-04-00100 | Adjusting Manholes | 2 | EACH | 4,500.00 | 9,000.00 | 1,800.00 | 3,600.00 | 1,330.00 | 2,660.00 | 5,000.00 | 10,000.00 | | 0025 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 6,500.00 | 6,500.00 | 2,600.00 | 2,600.00 | 1,730.00 | 1,730.00 | 7,500.00 | 7,500.00 | | 0026 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 12.6 | LNFT | 33.00 | 415.80 | 38.00 | 478.80 | 115.00 | 1,449.00 | 75.00 | 945.00 | | 0027 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 50 | LNFT | 105.00 | 5,250.00 | 165.00 | 8,250.00 | 169.00 | 8,450.00 | 175.00 | 8,750.00 | | 0028 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 2 | EACH | 3,500.00 | 7,000.00 | 3,250.00 | 6,500.00 | 5,080.00 | 10,160.00 | 5,000.00 | 10,000.00 | | 0029 | 706-02-00300 | Concrete Drive (8" Thick) | 1,781.7 | SQYD | 100.00 | 178,170.00 | 110.00 | 195,987.00 | 99.00 | 176,388.30 | 120.00 | 213,804.00 | | 0030 | 707-01-00100 | Concrete Curb | 27 | LNFT | 35.00 | 945.00 | 51.00 | 1,377.00 | 79.00 | 2,133.00 | 75.00 | 2,025.00 | | 0031 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 136,525.00 | 136,525.00 | 220,000.00 | 220,000.00 | 13,850.00 | 13,850.00 | 550,000.00 | 550,000.00 | | 0032 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.094 | MILE | 175.00 | 891.45 | 285.00 | 1,451.79 | 945.00 | 4,813.83 | 400.00 | 2,037.60 | | 0033 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.189 | MILE | 300.00 | 1,256.70 | 300.00 | 1,256.70 | 1,115.00 | 4,670.74 | 800.00 | 3,351.20 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 10.523 | MILE | 775.00 | 8,155.33 | 775.00 | 8,155.33 | 1,046.00 | 11,007.06 | 1,000.00 | 10,523.00 | | 0035 | 716-01-00100 | Mulch (Vegetative) | 0.6 | TON | 3,500.00 | 2,100.00 | 3,650.00 | 2,190.00 | 7,250.00 | 4,350.00 | 4,500.00 | 2,700.00 | | 0036 | 717-01-00100 | Seeding | 21 | LB | 35.00 | 735.00 | 36.00 | 756.00 | 41.00 | 861.00 | 50.00 | 1,050.00 | | 0037 | 718-01-00100 | Fertilizer | 365 | LB | 1.00 | 365.00 | 1.00 | 365.00 | 3.00 | 1,095.00 | 2.00 | 730.00 | | 0038 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 4.473 | MILE | 700.00 | 3,131.10 | 350.00 | 1,565.55 | 1,261.00 | 5,640.45 | 500.00 | 2,236.50 | | 0039 | 726-01-00100 | Bedding Material | 150.1 | CUYD | 225.00 | 33,772.50 | 130.00 | 19,513.00 | 102.00 | 15,310.20 | 250.00 | 37,525.00 | | 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 320,000.00 | 320,000.00 | 364,000.00 | 364,000.00 | 409,340.00 | 409,340.00 | 475,000.00 | 475,000.00 | | 0041 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 300.00 | 600.00 | 110.00 | 220.00 | 580.00 | 1,160.00 | 200.00 | 400.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 320 | EACH | 7.25 | 2,320.00 | 7.50 | 2,400.00 | 11.00 | 3,520.00 | 8.00 | 2,560.00 | | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.951 | MILE | 5,000.00 | 24,755.00 | 5,500.00 | 27,230.50 | 5,452.00 | 26,992.85 | 6,000.00 | 29,706.00 | | 0044 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.049 | MILE | 1,750.00 | 3,585.75 | 2,000.00 | 4,098.00 | 2,011.00 | 4,120.54 | 1,500.00 | 3,073.50 | | 0045 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 9 | EACH | 450.00 | 4,050.00 | 500.00 | 4,500.00 | 460.00 | 4,140.00 | 400.00 | 3,600.00 | | 0046 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 9 | EACH | 450.00 | 4,050.00 | 500.00 | 4,500.00 | 605.00 | 5,445.00 | 550.00 | 4,950.00 | | 0047 | 732-05-00100 | Removal of Existing Markings | 2.237 | MILE | 4,500.00 | 10,066.50 | 5,000.00 | 11,185.00 | 6,344.00 | 14,191.53 | 6,000.00 | 13,422.00 | | 0048 | 735-01-00100 | Mailboxes | 17 | EACH | 125.00 | 2,125.00 | 28.00 | 476.00 | 58.00 | 986.00 | 30.00 | 510.00 | | 0049 | 735-02-00100 | Mailbox Supports (Single) | 11 | EACH | 125.00 | 1,375.00 | 300.00 | 3,300.00 | 323.00 | 3,553.00 | 325.00 | 3,575.00 | | 0050 | 735-03-00100 | Mailbox Supports (Double) | 3 | EACH | 200.00 | 600.00 | 350.00 | 1,050.00 | 597.00 | 1,791.00 | 450.00 | 1,350.00 | | 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 19,053.64 | 19,053.64 | 13,850.00 | 13,850.00 | 100,000.00 | 100,000.00 | | 0052 | 741-35-00100 | Adjust Valve or Meter Box | 2 | EACH | 135.00 | 270.00 | 2,100.00 | 4,200.00 | 460.00 | 920.00 | 3,000.00 | 6,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,394,676.12 | | 3,647,222.00 | | 4,511,762.44 | | 5,187,285.10 |
|