Proposal:H.016141.6
Parish:St. Martin
Routes:LA 353
Description:LA 353: CYPRESS ISL EXT - LA 31
Type Construction:MILLING ASPHALT CONCRETE, LIME TREATMENT, IN-PLACE CEMENT TREATED SUBGRADE, ASPHALT CONCRETE OVERLAY, ROADWAY REINFORCING MESH (COMPLETE ROAD SYSTEM), AND RELATED WORK.
Estimated Construction Cost:$10,318,100.73
| Rank | License | Bidder | Construction Bid |
| 1 | 06276 | Barriere Construction Co., LLC | $10,313,226.98 |
| 2 | 34356 | Prairie Contractors LLC | $10,421,261.35 |
| 3 | 51821 | Elliott Construction, LLC | $10,591,531.89 |
| 4 | 54928 | Womack And Sons Constr. Group LLC | $10,797,837.18 |
| 5 | 33663 | Glenn Lege Construction LLC | $13,561,371.83 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barriere Construction Co., LLC | - 2 - Prairie Contractors LLC | - 3 - Elliott Construction, LLC | - 4 - Womack And Sons Constr. Group LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 3,150 | SQYD | 3.00 | 9,450.00 | 20.00 | 63,000.00 | 25.00 | 78,750.00 | 35.20 | 110,880.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 391.7 | SQYD | 30.00 | 11,751.00 | 40.00 | 15,668.00 | 35.00 | 13,709.50 | 20.60 | 8,069.02 | | 0003 | 202-02-04560 | Removal of Bridge Joint (Poured Joint Seal) | 204 | LNFT | 18.00 | 3,672.00 | 15.00 | 3,060.00 | 11.00 | 2,244.00 | 12.14 | 2,476.56 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 828 | SQYD | 25.00 | 20,700.00 | 95.00 | 78,660.00 | 40.00 | 33,120.00 | 58.70 | 48,603.60 | | 0005 | 202-02-14500 | Removal of Guard Rail | 505 | LNFT | 9.00 | 4,545.00 | 17.00 | 8,585.00 | 15.00 | 7,575.00 | 17.80 | 8,989.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,531 | CUYD | 40.00 | 61,240.00 | 35.00 | 53,585.00 | 50.00 | 76,550.00 | 26.80 | 41,030.80 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 170.00 | 1,020.00 | 150.00 | 900.00 | 165.00 | 990.00 | 190.80 | 1,144.80 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 738 | LNFT | 3.25 | 2,398.50 | 4.00 | 2,952.00 | 4.50 | 3,321.00 | 5.10 | 3,763.80 | | 0009 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 100,205 | SQYD | 8.00 | 801,640.00 | 13.00 | 1,302,665.00 | 12.00 | 1,202,460.00 | 10.80 | 1,082,214.00 | | 0010 | 303-02-00100 | Removal of Existing Patches | 1,000 | SQYD | 26.00 | 26,000.00 | 58.00 | 58,000.00 | 65.00 | 65,000.00 | 59.60 | 59,600.00 | | 0011 | 304-01-00100 | Lime | 230.15 | TON | 250.00 | 57,537.50 | 420.00 | 96,663.00 | 450.00 | 103,567.50 | 418.00 | 96,202.70 | | 0012 | 304-03-00300 | Lime Treatment (Type C) (10" Thick) | 25,052 | SQYD | 7.00 | 175,364.00 | 6.50 | 162,838.00 | 7.00 | 175,364.00 | 6.42 | 160,833.84 | | 0013 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 100,205 | SQYD | 11.50 | 1,152,357.50 | 12.50 | 1,252,562.50 | 11.50 | 1,152,357.50 | 10.56 | 1,058,164.80 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 3,664 | CUYD | 41.00 | 150,224.00 | 72.00 | 263,808.00 | 65.00 | 238,160.00 | 81.50 | 298,616.00 | | 0015 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 655.8 | CUYD | 35.00 | 22,953.00 | 60.00 | 39,348.00 | 75.00 | 49,185.00 | 30.00 | 19,674.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 31,519 | TON | 146.00 | 4,601,774.00 | 122.00 | 3,845,318.00 | 135.00 | 4,255,065.00 | 152.70 | 4,812,951.30 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,840.4 | TON | 200.00 | 368,080.00 | 205.00 | 377,282.00 | 190.00 | 349,676.00 | 254.40 | 468,197.76 | | 0018 | 509-01-00100 | Milling Asphalt Pavement | 93,982 | SQYD | 3.00 | 281,946.00 | 3.65 | 343,034.30 | 2.75 | 258,450.50 | 5.18 | 486,826.76 | | 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,834 | CUYD | 0.01 | -58.34 | 0.01 | -58.34 | 0.01 | -58.34 | 0.01 | -58.34 | | 0020 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 64 | SQYD | 255.00 | 16,320.00 | 350.00 | 22,400.00 | 235.00 | 15,040.00 | 624.80 | 39,987.20 | | 0021 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 15,724 | INLF | 0.50 | 7,862.00 | 1.50 | 23,586.00 | 1.50 | 23,586.00 | 1.91 | 30,032.84 | | 0022 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 48 | LNFT | 30.00 | 1,440.00 | 15.00 | 720.00 | 15.00 | 720.00 | 113.00 | 5,424.00 | | 0023 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 48 | LNFT | 30.00 | 1,440.00 | 10.00 | 480.00 | 5.50 | 264.00 | 100.00 | 4,800.00 | | 0024 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 32.7 | SQYD | 350.00 | 11,445.00 | 450.00 | 14,715.00 | 250.00 | 8,175.00 | 921.00 | 30,116.70 | | 0025 | 602-12-00100 | Undersealing Pavement | 5 | TON | 4,500.00 | 22,500.00 | 5,000.00 | 25,000.00 | 4,400.00 | 22,000.00 | 5,087.00 | 25,435.00 | | 0026 | 602-14-00100 | Holes | 12 | EACH | 625.00 | 7,500.00 | 700.00 | 8,400.00 | 550.00 | 6,600.00 | 635.00 | 7,620.00 | | 0027 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 8 | LNFT | 425.00 | 3,400.00 | 550.00 | 4,400.00 | 425.00 | 3,400.00 | 540.00 | 4,320.00 | | 0028 | 701-14-00100 | Cleaning Existing Pipes 36" | 961 | LNFT | 45.00 | 43,245.00 | 150.00 | 144,150.00 | 20.00 | 19,220.00 | 12.75 | 12,252.75 | | 0029 | 701-14-00100 | Cleaning Existing Pipes 70" | 126 | LNFT | 60.00 | 7,560.00 | 175.00 | 22,050.00 | 65.00 | 8,190.00 | 93.40 | 11,768.40 | | 0030 | 701-15-00100 | Concrete Collar | 1 | EACH | 4,000.00 | 4,000.00 | 6,000.00 | 6,000.00 | 1,675.00 | 1,675.00 | 12,590.00 | 12,590.00 | | 0031 | 702-04-00001 | Adjusting Miscellaneous Structures (Replace Drainage Grates) | 2 | EACH | 4,000.00 | 8,000.00 | 6,000.00 | 12,000.00 | 1,500.00 | 3,000.00 | 2,995.00 | 5,990.00 | | 0032 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 | 1,100.00 | 1,100.00 | 4,246.00 | 4,246.00 | | 0033 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 4,500.00 | 4,500.00 | 8,000.00 | 8,000.00 | 2,000.00 | 2,000.00 | 34,800.00 | 34,800.00 | | 0034 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 4,900.00 | 4,900.00 | 14,000.00 | 14,000.00 | 4,275.00 | 4,275.00 | 8,075.00 | 8,075.00 | | 0035 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 220 | LNFT | 49.50 | 10,890.00 | 115.00 | 25,300.00 | 55.00 | 12,100.00 | 117.10 | 25,762.00 | | 0036 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 412.5 | LNFT | 32.00 | 13,200.00 | 45.00 | 18,562.50 | 35.00 | 14,437.50 | 38.20 | 15,757.50 | | 0037 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 129.50 | 12,950.00 | 165.00 | 16,500.00 | 145.00 | 14,500.00 | 171.80 | 17,180.00 | | 0038 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 3,300.00 | 13,200.00 | 4,750.00 | 19,000.00 | 3,630.00 | 14,520.00 | 4,706.00 | 18,824.00 | | 0039 | 706-02-00200 | Concrete Drive (6" Thick) | 724.6 | SQYD | 90.00 | 65,214.00 | 265.00 | 192,019.00 | 120.00 | 86,952.00 | 208.40 | 151,006.64 | | 0040 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 50 | SQYD | 185.00 | 9,250.00 | 275.00 | 13,750.00 | 200.00 | 10,000.00 | 164.60 | 8,230.00 | | 0041 | 711-04-00100 | Geotextile Fabric | 50 | SQYD | 5.00 | 250.00 | 15.00 | 750.00 | 15.00 | 750.00 | 16.15 | 807.50 | | 0042 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 355,000.00 | 355,000.00 | 1.00 | 1.00 | 250,000.00 | 250,000.00 | 40,385.00 | 40,385.00 | | 0043 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,408 | LNFT | 0.15 | 211.20 | 0.01 | 14.08 | 1.00 | 1,408.00 | 0.19 | 267.52 | | 0044 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 88 | LNFT | 0.35 | 30.80 | 0.01 | 0.88 | 1.00 | 88.00 | 0.76 | 66.88 | | 0045 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 24.892 | MILE | 500.00 | 12,446.00 | 650.00 | 16,179.80 | 850.00 | 21,158.20 | 636.00 | 15,831.31 | | 0046 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 21.428 | MILE | 200.00 | 4,285.60 | 1.00 | 21.43 | 440.00 | 9,428.32 | 0.01 | 0.21 | | 0047 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 65.768 | MILE | 300.00 | 19,730.40 | 1.00 | 65.77 | 660.00 | 43,406.88 | 0.01 | 0.66 | | 0048 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 8 | EACH | 17.00 | 136.00 | 1.00 | 8.00 | 20.00 | 160.00 | 25.45 | 203.60 | | 0049 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 8 | EACH | 17.00 | 136.00 | 1.00 | 8.00 | 20.00 | 160.00 | 25.45 | 203.60 | | 0050 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 8 | EACH | 17.00 | 136.00 | 1.00 | 8.00 | 20.00 | 160.00 | 25.45 | 203.60 | | 0051 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 17,500.00 | 17,500.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 10,800.00 | 10,800.00 | | 0052 | 724-01-00100 | Rumble Strips (Centerline) | 4.98 | MILE | 1,400.00 | 6,972.00 | 1,250.00 | 6,225.00 | 1,100.00 | 5,478.00 | 369.00 | 1,837.62 | | 0053 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 9.958 | MILE | 840.00 | 8,364.72 | 1,250.00 | 12,447.50 | 1,100.00 | 10,953.80 | 369.00 | 3,674.50 | | 0054 | 726-01-00100 | Bedding Material | 1 | CUYD | 500.00 | 500.00 | 400.00 | 400.00 | 350.00 | 350.00 | 3,855.00 | 3,855.00 | | 0055 | 727-01-00100 | Mobilization | 1 | LUMP | 924,500.00 | 924,500.00 | 800,000.00 | 800,000.00 | 800,000.00 | 800,000.00 | 323,740.00 | 323,740.00 | | 0056 | 729-16-00200 | Object Marker Assembly (Type 2) | 36 | EACH | 75.00 | 2,700.00 | 80.00 | 2,880.00 | 75.00 | 2,700.00 | 82.70 | 2,977.20 | | 0057 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.00 | 340.00 | 160.00 | 640.00 | 95.00 | 380.00 | 178.00 | 712.00 | | 0058 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,013 | EACH | 4.00 | 4,052.00 | 5.00 | 5,065.00 | 4.50 | 4,558.50 | 10.20 | 10,332.60 | | 0059 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 22 | LNFT | 17.00 | 374.00 | 22.00 | 484.00 | 20.00 | 440.00 | 14.00 | 308.00 | | 0060 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16.442 | MILE | 3,900.00 | 64,123.80 | 4,900.00 | 80,565.80 | 4,300.00 | 70,700.60 | 5,343.00 | 87,849.61 | | 0061 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.026 | MILE | 20,000.00 | 520.00 | 25,000.00 | 650.00 | 22,000.00 | 572.00 | 10,176.00 | 264.58 | | 0062 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.357 | MILE | 900.00 | 4,821.30 | 1,125.00 | 6,026.63 | 990.00 | 5,303.43 | 1,400.00 | 7,499.80 | | 0063 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.041 | MILE | 10,000.00 | 410.00 | 12,500.00 | 512.50 | 11,000.00 | 451.00 | 3,370.00 | 138.17 | | 0064 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 300.00 | 600.00 | 375.00 | 750.00 | 350.00 | 700.00 | 350.00 | 700.00 | | 0065 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 300.00 | 600.00 | 375.00 | 750.00 | 350.00 | 700.00 | 350.00 | 700.00 | | 0066 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 450.00 | 900.00 | 562.50 | 1,125.00 | 500.00 | 1,000.00 | 382.00 | 764.00 | | 0067 | 732-05-00100 | Removal of Existing Markings | 0.114 | MILE | 8,000.00 | 912.00 | 10,000.00 | 1,140.00 | 9,000.00 | 1,026.00 | 6,360.00 | 725.04 | | 0068 | 735-01-00100 | Mailboxes | 235 | EACH | 100.00 | 23,500.00 | 10.00 | 2,350.00 | 2.00 | 470.00 | 1.27 | 298.45 | | 0069 | 735-02-00100 | Mailbox Supports (Single) | 209 | EACH | 135.00 | 28,215.00 | 300.00 | 62,700.00 | 275.00 | 57,475.00 | 316.70 | 66,190.30 | | 0070 | 735-03-00100 | Mailbox Supports (Double) | 13 | EACH | 200.00 | 2,600.00 | 350.00 | 4,550.00 | 325.00 | 4,225.00 | 375.00 | 4,875.00 | | 0071 | 739-01-00100 | Hydro-Seeding | 4.4 | ACRE | 2,600.00 | 11,440.00 | 3,500.00 | 15,400.00 | 3,000.00 | 13,200.00 | 3,434.00 | 15,109.60 | | 0072 | 740-01-00100 | Construction Layout | 1 | LUMP | 22,000.00 | 22,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 35,500.00 | 35,500.00 | | 0073 | 815-03-00300 | Joint Seal (Poured) | 204 | LNFT | 75.00 | 15,300.00 | 45.00 | 9,180.00 | 40.00 | 8,160.00 | 12.70 | 2,590.80 | | 0074 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 92,968 | SQYD | 7.50 | 697,260.00 | 7.50 | 697,260.00 | 8.50 | 790,228.00 | 8.70 | 808,821.60 | | 0075 | NS-830-00900 | Epoxy-Urethane Overlay | 3,900 | SQFT | 14.50 | 56,550.00 | 18.00 | 70,200.00 | 25.00 | 97,500.00 | 23.35 | 91,065.00 | | 0076 | NS-MSC-00080 | Detectable Warning Surface Retrofit for Curb Ramps | 4 | EACH | 350.00 | 1,400.00 | 3,500.00 | 14,000.00 | 1,500.00 | 6,000.00 | 4,035.00 | 16,140.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 10,313,226.98 | | 10,421,261.35 | | 10,591,531.89 | | 10,797,837.18 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Glenn Lege Construction LLC | | Unit Price | Total Amount | | 0001 | 202-02-02000 | Removal of Asphalt Drives | 3,150 | SQYD | 25.39 | 79,978.50 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 391.7 | SQYD | 14.44 | 5,656.15 | | 0003 | 202-02-04560 | Removal of Bridge Joint (Poured Joint Seal) | 204 | LNFT | 23.20 | 4,732.80 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 828 | SQYD | 28.39 | 23,506.92 | | 0005 | 202-02-14500 | Removal of Guard Rail | 505 | LNFT | 10.45 | 5,277.25 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,531 | CUYD | 63.90 | 97,830.90 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 232.30 | 1,393.80 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 738 | LNFT | 4.07 | 3,003.66 | | 0009 | 303-01-00200 | In-Place Cement Stabilized Base Course (8-1/2" Thick) | 100,205 | SQYD | 9.20 | 921,886.00 | | 0010 | 303-02-00100 | Removal of Existing Patches | 1,000 | SQYD | 20.45 | 20,450.00 | | 0011 | 304-01-00100 | Lime | 230.15 | TON | 298.16 | 68,621.52 | | 0012 | 304-03-00300 | Lime Treatment (Type C) (10" Thick) | 25,052 | SQYD | 4.84 | 121,251.68 | | 0013 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 100,205 | SQYD | 10.86 | 1,088,226.30 | | 0014 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 3,664 | CUYD | 74.63 | 273,444.32 | | 0015 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 655.8 | CUYD | 143.17 | 93,890.89 | | 0016 | 502-01-00100 | Asphalt Concrete | 31,519 | TON | 177.64 | 5,599,035.16 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,840.4 | TON | 204.47 | 376,306.59 | | 0018 | 509-01-00100 | Milling Asphalt Pavement | 93,982 | SQYD | 2.29 | 215,218.78 | | 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -5,834 | CUYD | 0.01 | -58.34 | | 0020 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 64 | SQYD | 225.84 | 14,453.76 | | 0021 | 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 15,724 | INLF | 1.16 | 18,239.84 | | 0022 | 511-03-00100 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 48 | LNFT | 127.83 | 6,135.84 | | 0023 | 511-04-00100 | Sawcuts in Asphalt Concrete Lifts | 48 | LNFT | 34.09 | 1,636.32 | | 0024 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 32.7 | SQYD | 125.08 | 4,090.12 | | 0025 | 602-12-00100 | Undersealing Pavement | 5 | TON | 5,454.00 | 27,270.00 | | 0026 | 602-14-00100 | Holes | 12 | EACH | 681.75 | 8,181.00 | | 0027 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 8 | LNFT | 241.58 | 1,932.64 | | 0028 | 701-14-00100 | Cleaning Existing Pipes 36" | 961 | LNFT | 102.26 | 98,271.86 | | 0029 | 701-14-00100 | Cleaning Existing Pipes 70" | 126 | LNFT | 102.26 | 12,884.76 | | 0030 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,363.50 | 1,363.50 | | 0031 | 702-04-00001 | Adjusting Miscellaneous Structures (Replace Drainage Grates) | 2 | EACH | 1,874.81 | 3,749.62 | | 0032 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 388.60 | 388.60 | | 0033 | 702-04-00200 | Adjusting Catch Basins | 1 | EACH | 2,386.13 | 2,386.13 | | 0034 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 2,672.46 | 2,672.46 | | 0035 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 220 | LNFT | 67.50 | 14,850.00 | | 0036 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 412.5 | LNFT | 43.63 | 17,997.38 | | 0037 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 176.58 | 17,658.00 | | 0038 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 4 | EACH | 4,499.55 | 17,998.20 | | 0039 | 706-02-00200 | Concrete Drive (6" Thick) | 724.6 | SQYD | 91.67 | 66,424.08 | | 0040 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 50 | SQYD | 139.08 | 6,954.00 | | 0041 | 711-04-00100 | Geotextile Fabric | 50 | SQYD | 18.41 | 920.50 | | 0042 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 562,563.74 | 562,563.74 | | 0043 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 1,408 | LNFT | 0.20 | 281.60 | | 0044 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 88 | LNFT | 0.47 | 41.36 | | 0045 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 24.892 | MILE | 409.05 | 10,182.07 | | 0046 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 21.428 | MILE | 545.40 | 11,686.83 | | 0047 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 65.768 | MILE | 818.10 | 53,804.80 | | 0048 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 8 | EACH | 23.18 | 185.44 | | 0049 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 8 | EACH | 23.18 | 185.44 | | 0050 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 8 | EACH | 23.18 | 185.44 | | 0051 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 18,134.55 | 18,134.55 | | 0052 | 724-01-00100 | Rumble Strips (Centerline) | 4.98 | MILE | 1,363.50 | 6,790.23 | | 0053 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 9.958 | MILE | 1,363.50 | 13,577.73 | | 0054 | 726-01-00100 | Bedding Material | 1 | CUYD | 143.17 | 143.17 | | 0055 | 727-01-00100 | Mobilization | 1 | LUMP | 1,144,708.70 | 1,144,708.70 | | 0056 | 729-16-00200 | Object Marker Assembly (Type 2) | 36 | EACH | 102.26 | 3,681.36 | | 0057 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 115.90 | 463.60 | | 0058 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,013 | EACH | 5.45 | 5,520.85 | | 0059 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 22 | LNFT | 23.18 | 509.96 | | 0060 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16.442 | MILE | 5,317.65 | 87,432.80 | | 0061 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.026 | MILE | 27,270.00 | 709.02 | | 0062 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.357 | MILE | 1,227.15 | 6,573.84 | | 0063 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.041 | MILE | 13,635.00 | 559.04 | | 0064 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 409.05 | 818.10 | | 0065 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 409.05 | 818.10 | | 0066 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 613.58 | 1,227.16 | | 0067 | 732-05-00100 | Removal of Existing Markings | 0.114 | MILE | 10,908.00 | 1,243.51 | | 0068 | 735-01-00100 | Mailboxes | 235 | EACH | 34.09 | 8,011.15 | | 0069 | 735-02-00100 | Mailbox Supports (Single) | 209 | EACH | 306.79 | 64,119.11 | | 0070 | 735-03-00100 | Mailbox Supports (Double) | 13 | EACH | 340.88 | 4,431.44 | | 0071 | 739-01-00100 | Hydro-Seeding | 4.4 | ACRE | 3,817.80 | 16,798.32 | | 0072 | 740-01-00100 | Construction Layout | 1 | LUMP | 656,116.20 | 656,116.20 | | 0073 | 815-03-00300 | Joint Seal (Poured) | 204 | LNFT | 13.64 | 2,782.56 | | 0074 | NS-500-00180 | Roadway Reinforcing Mesh (Complete Road System) | 92,968 | SQYD | 14.45 | 1,343,387.60 | | 0075 | NS-830-00900 | Epoxy-Urethane Overlay | 3,900 | SQFT | 47.05 | 183,495.00 | | 0076 | NS-MSC-00080 | Detectable Warning Surface Retrofit for Curb Ramps | 4 | EACH | 1,022.63 | 4,090.52 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 13,561,371.83 |
|