Proposal:H.015877.6
Parish:Jefferson Davis, Vermilion
Routes:LA 14
Description:LA 14: LA 380 - MERMENTAU BRIDGE
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, PAVEMENT WIDENING, ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,007,715.08
| Rank | License | Bidder | Construction Bid |
| 1 | 33663 | Glenn Lege Construction LLC | $2,296,092.91 |
| 2 | 00183 | R. E. Heidt Construction Co., LLC | $2,450,586.87 |
| 3 | 34356 | Prairie Contractors LLC | $3,002,303.22 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Glenn Lege Construction LLC | - 2 - R. E. Heidt Construction Co., LLC | - 3 - Prairie Contractors LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 200 | LNFT | 27.57 | 5,514.00 | 75.75 | 15,150.00 | 50.00 | 10,000.00 | | 0002 | 202-02-06102 | Removal of Incidental Concrete Paving | 2.5 | SQYD | 45.96 | 114.90 | 454.50 | 1,136.25 | 1,000.00 | 2,500.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 492.5 | LNFT | 10.45 | 5,146.63 | 13.64 | 6,717.70 | 16.00 | 7,880.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 54 | CUYD | 103.73 | 5,601.42 | 350.00 | 18,900.00 | 200.00 | 10,800.00 | | 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 232.30 | 929.20 | 202.00 | 808.00 | 200.00 | 800.00 | | 0006 | 204-06-00100 | Temporary Silt Fencing | 2,670 | LNFT | 2.49 | 6,648.30 | 2.18 | 5,820.60 | 2.15 | 5,740.50 | | 0007 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 185 | CUYD | 151.00 | 27,935.00 | 168.00 | 31,080.00 | 10.00 | 1,850.00 | | 0008 | 502-01-00100 | Asphalt Concrete | 4,340.9 | TON | 131.03 | 568,788.13 | 130.00 | 564,317.00 | 125.00 | 542,612.50 | | 0009 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,769.9 | TON | 160.74 | 284,493.73 | 216.00 | 382,298.40 | 200.00 | 353,980.00 | | 0010 | 509-01-00100 | Milling Asphalt Pavement | 32,329 | SQYD | 2.53 | 81,792.37 | 5.50 | 177,809.50 | 5.25 | 169,727.25 | | 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,215 | CUYD | 0.01 | -12.15 | 0.01 | -12.15 | 0.01 | -12.15 | | 0012 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 329 | SQYD | 233.03 | 76,666.87 | 195.00 | 64,155.00 | 300.00 | 98,700.00 | | 0013 | 510-02-00100 | Pavement Widening 14" MINIMUM THICKNESS | 1,634.2 | SQYD | 169.34 | 276,735.43 | 150.00 | 245,130.00 | 182.00 | 297,424.40 | | 0014 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 3,000 | INLF | 1.75 | 5,250.00 | 1.52 | 4,560.00 | 4.00 | 12,000.00 | | 0015 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 1,996 | LNFT | 4.83 | 9,640.68 | 4.21 | 8,403.16 | 6.50 | 12,974.00 | | 0016 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 1,387 | LNFT | 5.02 | 6,962.74 | 4.37 | 6,061.19 | 9.00 | 12,483.00 | | 0017 | 602-03-00100 | Cleaning and Sealing Random Cracks | 2,245 | LNFT | 8.27 | 18,566.15 | 7.20 | 16,164.00 | 10.00 | 22,450.00 | | 0018 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 61.8 | SQYD | 168.36 | 10,404.65 | 409.05 | 25,279.29 | 662.00 | 40,911.60 | | 0019 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 140.1 | SQYD | 165.56 | 23,194.96 | 358.55 | 50,232.86 | 485.00 | 67,948.50 | | 0020 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 741 | SQYD | 164.11 | 121,605.51 | 315.12 | 233,503.92 | 335.00 | 248,235.00 | | 0021 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 225 | LNFT | 34.55 | 7,773.75 | 35.35 | 7,953.75 | 45.00 | 10,125.00 | | 0022 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 87.11 | 4,355.50 | 87.87 | 4,393.50 | 105.00 | 5,250.00 | | 0023 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 139.38 | 13,938.00 | 136.35 | 13,635.00 | 170.00 | 17,000.00 | | 0024 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,239.48 | 16,957.92 | 4,141.00 | 16,564.00 | 5,250.00 | 21,000.00 | | 0025 | 707-01-00100 | Concrete Curb | 54 | LNFT | 39.39 | 2,127.06 | 151.50 | 8,181.00 | 200.00 | 10,800.00 | | 0026 | 707-03-00100 | Combination Concrete Curb and Gutter | 200 | LNFT | 57.12 | 11,424.00 | 101.00 | 20,200.00 | 110.00 | 22,000.00 | | 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 183,457.61 | 183,457.61 | 100,000.00 | 100,000.00 | 290,000.00 | 290,000.00 | | 0028 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 144 | LNFT | 0.59 | 84.96 | 0.51 | 73.44 | 0.01 | 1.44 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.183 | MILE | 1,116.05 | 3,552.39 | 820.00 | 2,610.06 | 6,500.00 | 20,689.50 | | 0030 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.296 | MILE | 987.28 | 3,254.07 | 858.50 | 2,829.62 | 1.00 | 3.30 | | 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 9.382 | MILE | 1,277.65 | 11,986.91 | 1,111.00 | 10,423.40 | 1.00 | 9.38 | | 0032 | 724-01-00100 | Rumble Strips (Centerline) | 0.43 | MILE | 1,161.50 | 499.45 | 1,515.00 | 651.45 | 2,000.00 | 860.00 | | 0033 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.86 | MILE | 1,161.50 | 998.89 | 1,515.00 | 1,302.90 | 2,000.00 | 1,720.00 | | 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 213,202.31 | 213,202.31 | 260,000.00 | 260,000.00 | 290,000.00 | 290,000.00 | | 0035 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 98.73 | 394.92 | 141.40 | 565.60 | 175.00 | 700.00 | | 0036 | 731-02-00100 | Reflectorized Raised Pavement Markers | 331 | EACH | 5.81 | 1,923.11 | 5.05 | 1,671.55 | 6.50 | 2,151.50 | | 0037 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 120 | LNFT | 13.94 | 1,672.80 | 12.12 | 1,454.40 | 15.00 | 1,800.00 | | 0038 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 1,551 | LNFT | 1.33 | 2,062.83 | 1.17 | 1,814.67 | 1.50 | 2,326.50 | | 0039 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.418 | MILE | 6,272.10 | 33,982.24 | 5,454.00 | 29,549.77 | 7,000.00 | 37,926.00 | | 0040 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.456 | MILE | 3,252.20 | 4,735.20 | 2,828.00 | 4,117.57 | 3,500.00 | 5,096.00 | | 0041 | 732-05-00100 | Removal of Existing Markings | 0.16 | MILE | 8,711.25 | 1,393.80 | 7,575.00 | 1,212.00 | 10,000.00 | 1,600.00 | | 0042 | 735-01-00100 | Mailboxes | 76 | EACH | 32.52 | 2,471.52 | 1.01 | 76.76 | 10.00 | 760.00 | | 0043 | 735-02-00100 | Mailbox Supports (Single) | 68 | EACH | 261.34 | 17,771.12 | 262.60 | 17,856.80 | 325.00 | 22,100.00 | | 0044 | 735-03-00100 | Mailbox Supports (Double) | 4 | EACH | 319.41 | 1,277.64 | 303.00 | 1,212.00 | 375.00 | 1,500.00 | | 0045 | 739-01-00100 | Hydro-Seeding | 1.07 | ACRE | 3,310.28 | 3,542.00 | 4,191.50 | 4,484.91 | 5,000.00 | 5,350.00 | | 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 116,463.10 | 116,463.10 | 8,000.00 | 8,000.00 | 220,000.00 | 220,000.00 | | 0047 | NS-401-00100 | Hot-Mix Asphalt Aggregate Surface Course | 346 | TON | 180.41 | 62,421.86 | 130.00 | 44,980.00 | 160.00 | 55,360.00 | | 0048 | NS-602-00001 | Milling Concrete Pavement | 177 | SQYD | 205.59 | 36,389.43 | 154.00 | 27,258.00 | 210.00 | 37,170.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,296,092.91 | | 2,450,586.87 | | 3,002,303.22 |
|