Proposal:H.015841.6
Parish:Calcasieu
Routes:US 171
Description:US 171: US 90 - MOELING
Type Construction:CLEANING AND RESEALING PAVEMENT JOINTS, PAVEMENT PATCHING, AND RELATED WORK.
Estimated Construction Cost:$909,402.88
| Rank | License | Bidder | Construction Bid |
| 1 | 30774 | Progressive Construction Co., LLC | $932,215.18 |
| 2 | 39001 | JD's Rebar & Construction, Inc. | $956,871.08 |
| 3 | 52306 | SIEMA CONSTRUCTION, LLC | $1,119,716.48 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Progressive Construction Co., LLC | - 2 - JD's Rebar & Construction, Inc. | - 3 - SIEMA CONSTRUCTION, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions REMOVAL OF ABANDOND TIMBER SIGNAL POLE AT STA. 56+68. | 1 | LUMP | 5,000.00 | 5,000.00 | 11,514.66 | 11,514.66 | 1,800.00 | 1,800.00 | | 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 238 | LNFT | 50.00 | 11,900.00 | 21.39 | 5,090.82 | 37.00 | 8,806.00 | | 0003 | 202-02-06102 | Removal of Incidental Concrete Paving | 115 | SQYD | 50.00 | 5,750.00 | 26.56 | 3,054.40 | 44.00 | 5,060.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 1,044 | LNFT | 16.50 | 17,226.00 | 15.60 | 16,286.40 | 20.00 | 20,880.00 | | 0005 | 601-05-00100 | Saw Cutting Portland Cement Concrete Pavement | 359 | INLF | 8.00 | 2,872.00 | 8.51 | 3,055.09 | 2.00 | 718.00 | | 0006 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 15,730 | LNFT | 6.00 | 94,380.00 | 6.04 | 95,009.20 | 7.00 | 110,110.00 | | 0007 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 12,325 | LNFT | 6.00 | 73,950.00 | 8.80 | 108,460.00 | 7.00 | 86,275.00 | | 0008 | 602-03-00100 | Cleaning and Sealing Random Cracks | 686 | LNFT | 10.00 | 6,860.00 | 42.46 | 29,127.56 | 7.00 | 4,802.00 | | 0009 | 602-05-01220 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (10-1/2" Thick) | 66.5 | SQYD | 559.00 | 37,173.50 | 680.69 | 45,265.89 | 540.00 | 35,910.00 | | 0010 | 602-05-02220 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (10-1/2" Thick) | 195 | SQYD | 337.00 | 65,715.00 | 315.97 | 61,614.15 | 375.00 | 73,125.00 | | 0011 | 602-05-03220 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (10-1/2" Thick) | 120 | SQYD | 369.00 | 44,280.00 | 437.18 | 52,461.60 | 335.00 | 40,200.00 | | 0012 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 725 | LNFT | 43.00 | 31,175.00 | 47.70 | 34,582.50 | 39.00 | 28,275.00 | | 0013 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 43.2 | LNFT | 181.00 | 7,819.20 | 216.83 | 9,367.06 | 245.00 | 10,584.00 | | 0014 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 112.5 | LNFT | 106.00 | 11,925.00 | 113.84 | 12,807.00 | 92.00 | 10,350.00 | | 0015 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 225 | LNFT | 169.00 | 38,025.00 | 184.31 | 41,469.75 | 157.00 | 35,325.00 | | 0016 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 5,062.00 | 20,248.00 | 5,529.19 | 22,116.76 | 4,745.00 | 18,980.00 | | 0017 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 175.00 | 525.00 | 5,529.19 | 16,587.57 | 4,285.00 | 12,855.00 | | 0018 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 1,065 | SQYD | 150.00 | 159,750.00 | 99.61 | 106,084.65 | 140.00 | 149,100.00 | | 0019 | 707-01-00100 | Concrete Curb | 27 | LNFT | 100.00 | 2,700.00 | 184.01 | 4,968.27 | 142.00 | 3,834.00 | | 0020 | 707-03-00100 | Combination Concrete Curb and Gutter | 238 | LNFT | 150.00 | 35,700.00 | 81.55 | 19,408.90 | 44.00 | 10,472.00 | | 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 39,029.55 | 39,029.55 | 200,000.00 | 200,000.00 | | 0022 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,211 | LNFT | 0.40 | 884.40 | 0.54 | 1,193.94 | 0.40 | 884.40 | | 0023 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 567 | LNFT | 0.60 | 340.20 | 0.87 | 493.29 | 0.65 | 368.55 | | 0024 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.4 | MILE | 200.00 | 880.00 | 1,246.78 | 5,485.83 | 2,880.00 | 12,672.00 | | 0025 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.2 | MILE | 1,000.00 | 2,200.00 | 1,084.15 | 2,385.13 | 1,046.00 | 2,301.20 | | 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 4.272 | MILE | 1,312.00 | 5,604.86 | 1,300.38 | 5,555.22 | 1,374.00 | 5,869.73 | | 0027 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 14 | EACH | 31.00 | 434.00 | 32.52 | 455.28 | 33.00 | 462.00 | | 0028 | 727-01-00100 | Mobilization | 1 | LUMP | 93,000.00 | 93,000.00 | 81,311.55 | 81,311.55 | 110,000.00 | 110,000.00 | | 0029 | 729-16-00300 | Object Marker Assembly (Type 3) | 7 | EACH | 175.00 | 1,225.00 | 212.77 | 1,489.39 | 111.00 | 777.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,080 | EACH | 6.00 | 12,480.00 | 7.59 | 15,787.20 | 7.00 | 14,560.00 | | 0031 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 2,211 | LNFT | 3.00 | 6,633.00 | 3.79 | 8,379.69 | 4.00 | 8,844.00 | | 0032 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 295 | LNFT | 16.00 | 4,720.00 | 17.35 | 5,118.25 | 17.00 | 5,015.00 | | 0033 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 272 | LNFT | 17.50 | 4,760.00 | 19.51 | 5,306.72 | 19.00 | 5,168.00 | | 0034 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 100 | LNFT | 2.50 | 250.00 | 3.25 | 325.00 | 3.00 | 300.00 | | 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 4.272 | MILE | 6,563.00 | 28,037.14 | 7,585.52 | 32,405.34 | 6,900.00 | 29,476.80 | | 0036 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.2 | MILE | 11,875.00 | 2,375.00 | 11,925.70 | 2,385.14 | 12,500.00 | 2,500.00 | | 0037 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 2.2 | MILE | 11,875.00 | 26,125.00 | 11,383.62 | 25,043.96 | 12,500.00 | 27,500.00 | | 0038 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 14 | EACH | 344.00 | 4,816.00 | 390.30 | 5,464.20 | 360.00 | 5,040.00 | | 0039 | 732-05-00100 | Removal of Existing Markings | 0.939 | MILE | 10,625.00 | 9,976.88 | 10,737.63 | 10,082.63 | 11,200.00 | 10,516.80 | | 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 14,500.00 | 14,500.00 | 10,841.54 | 10,841.54 | 10,000.00 | 10,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 932,215.18 | | 956,871.08 | | 1,119,716.48 |
|