Proposal:H.015562.6
Parish:Jefferson
Description:VETERANS MEMORIAL BLVD: LA 49 - ROOSEVELT
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, CURB RAMPS, LOOP DETECTORS, AND RELATED WORK.
Estimated Construction Cost:$1,052,568.39
| Rank | License | Bidder | Construction Bid |
| 1 | 00046 | Barber Bros. Contracting Co., L.L.C | $1,143,737.50 |
| 2 | 06276 | Barriere Construction Co., LLC | $1,274,109.25 |
| 3 | 73475 | Madden Gulf Coast, LLC | $1,611,626.42 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $1,682,190.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Barber Bros. Contracting Co., L.L.C | - 2 - Barriere Construction Co., LLC | - 3 - Madden Gulf Coast, LLC | - 4 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 367.9 | LNFT | 20.00 | 7,358.00 | 23.50 | 8,645.65 | 50.00 | 18,395.00 | 25.00 | 9,197.50 | | 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 325 | SQYD | 40.00 | 13,000.00 | 32.00 | 10,400.00 | 50.00 | 16,250.00 | 35.00 | 11,375.00 | | 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 122 | LNFT | 15.00 | 1,830.00 | 23.50 | 2,867.00 | 50.00 | 6,100.00 | 25.00 | 3,050.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 28 | CUYD | 125.00 | 3,500.00 | 260.00 | 7,280.00 | 200.00 | 5,600.00 | 250.00 | 7,000.00 | | 0005 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 78.9 | TON | 175.00 | 13,807.50 | 305.00 | 24,064.50 | 500.00 | 39,450.00 | 400.00 | 31,560.00 | | 0006 | 502-04-00100 | Asphalt Concrete (SMA) Wearing Course 2" Thick | 2,506.1 | TON | 175.00 | 438,567.50 | 205.00 | 513,750.50 | 225.00 | 563,872.50 | 225.00 | 563,872.50 | | 0007 | 509-01-00100 | Milling Asphalt Pavement | 23,499 | SQYD | 6.50 | 152,743.50 | 7.00 | 164,493.00 | 6.00 | 140,994.00 | 8.00 | 187,992.00 | | 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,306 | CUYD | 0.00 | 0.00 | 0.01 | -13.06 | 0.01 | -13.06 | 0.10 | -130.60 | | 0009 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 50 | SQYD | 225.00 | 11,250.00 | 300.00 | 15,000.00 | 380.00 | 19,000.00 | 400.00 | 20,000.00 | | 0010 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 8,000.00 | 8,000.00 | 5,000.00 | 5,000.00 | 90.00 | 90.00 | 6,000.00 | 6,000.00 | | 0011 | 706-04-00110 | Curb Ramps Type 1 | 29.4 | SQYD | 240.00 | 7,056.00 | 310.00 | 9,114.00 | 250.00 | 7,350.00 | 325.00 | 9,555.00 | | 0012 | 706-04-00110 | Curb Ramps Type 3 | 18.6 | SQYD | 300.00 | 5,580.00 | 310.00 | 5,766.00 | 375.00 | 6,975.00 | 325.00 | 6,045.00 | | 0013 | 706-04-00110 | Curb Ramps Type 7 | 183.5 | SQYD | 210.00 | 38,535.00 | 310.00 | 56,885.00 | 250.00 | 45,875.00 | 325.00 | 59,637.50 | | 0014 | 707-01-00100 | Concrete Curb | 26.2 | LNFT | 45.00 | 1,179.00 | 60.00 | 1,572.00 | 33.00 | 864.60 | 50.00 | 1,310.00 | | 0015 | 707-03-00100 | Combination Concrete Curb and Gutter 6" Barrier | 200.8 | LNFT | 65.00 | 13,052.00 | 75.00 | 15,060.00 | 45.00 | 9,036.00 | 75.00 | 15,060.00 | | 0016 | 707-03-00100 | Combination Concrete Curb and Gutter 8" Barrier | 167.1 | LNFT | 70.00 | 11,697.00 | 75.00 | 12,532.50 | 50.00 | 8,355.00 | 75.00 | 12,532.50 | | 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 126,000.00 | 126,000.00 | 435,000.00 | 435,000.00 | 375,000.00 | 375,000.00 | | 0018 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 3,230 | LNFT | 0.20 | 646.00 | 0.20 | 646.00 | 0.20 | 646.00 | 0.25 | 807.50 | | 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.32 | MILE | 300.00 | 996.00 | 329.00 | 1,092.28 | 350.00 | 1,162.00 | 500.00 | 1,660.00 | | 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.928 | MILE | 800.00 | 2,342.40 | 800.00 | 2,342.40 | 800.00 | 2,342.40 | 1,000.00 | 2,928.00 | | 0021 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 115 | SQYD | 18.00 | 2,070.00 | 30.00 | 3,450.00 | 22.90 | 2,633.50 | 35.00 | 4,025.00 | | 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 150,000.00 | 150,000.00 | 126,000.00 | 126,000.00 | 150,000.00 | 150,000.00 | 155,000.00 | 155,000.00 | | 0023 | 731-02-00100 | Reflectorized Raised Pavement Markers | 485 | EACH | 8.00 | 3,880.00 | 7.50 | 3,637.50 | 7.50 | 3,637.50 | 10.00 | 4,850.00 | | 0024 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,615 | LNFT | 4.00 | 6,460.00 | 3.50 | 5,652.50 | 3.50 | 5,652.50 | 5.00 | 8,075.00 | | 0025 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 281 | LNFT | 14.00 | 3,934.00 | 12.50 | 3,512.50 | 1.50 | 421.50 | 15.00 | 4,215.00 | | 0026 | 732-01-05200 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 125 mil) | 2,022 | LNFT | 3.30 | 6,672.60 | 3.00 | 6,066.00 | 3.00 | 6,066.00 | 4.00 | 8,088.00 | | 0027 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.464 | MILE | 5,000.00 | 7,320.00 | 4,600.00 | 6,734.40 | 4,500.00 | 6,588.00 | 6,000.00 | 8,784.00 | | 0028 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.66 | MILE | 1,800.00 | 2,988.00 | 1,700.00 | 2,822.00 | 1,650.00 | 2,739.00 | 2,000.00 | 3,320.00 | | 0029 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 14 | EACH | 330.00 | 4,620.00 | 300.00 | 4,200.00 | 300.00 | 4,200.00 | 450.00 | 6,300.00 | | 0030 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 3 | EACH | 330.00 | 990.00 | 300.00 | 900.00 | 300.00 | 900.00 | 450.00 | 1,350.00 | | 0031 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 415.00 | 830.00 | 375.00 | 750.00 | 375.00 | 750.00 | 500.00 | 1,000.00 | | 0032 | 736-03-00100 | Jacking or Boring | 10 | LNFT | 112.00 | 1,120.00 | 100.00 | 1,000.00 | 101.52 | 1,015.20 | 150.00 | 1,500.00 | | 0033 | 736-09-00100 | Loop Detector | 114 | LNFT | 39.00 | 4,446.00 | 36.00 | 4,104.00 | 35.86 | 4,088.04 | 45.00 | 5,130.00 | | 0034 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 1,700.00 | 1,700.00 | 1,200.00 | 1,200.00 | 1,564.84 | 1,564.84 | 2,000.00 | 2,000.00 | | 0035 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 7 | LNFT | 21.00 | 147.00 | 13.69 | 95.83 | 19.02 | 133.14 | 50.00 | 350.00 | | 0036 | 736-11-00100 | Conduit (1" HDPE, Schedule 80) | 3 | LNFT | 24.00 | 72.00 | 8.00 | 24.00 | 22.52 | 67.56 | 50.00 | 150.00 | | 0037 | 736-12-00004 | Conductor (IMSA 51-7, #14 AWG, 19-Strand) | 10 | LNFT | 12.00 | 120.00 | 6.00 | 60.00 | 10.82 | 108.20 | 20.00 | 200.00 | | 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,000.00 | 18,000.00 | 75,000.00 | 75,000.00 | 52,000.00 | 52,000.00 | 100,000.00 | 100,000.00 | | 0039 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 361 | LNFT | 7.00 | 2,527.00 | 2.75 | 992.75 | 15.00 | 5,415.00 | 10.00 | 3,610.00 | | 0040 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 650 | LNFT | 7.00 | 4,550.00 | 2.75 | 1,787.50 | 15.00 | 9,750.00 | 7.50 | 4,875.00 | | 0041 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 1,046 | LNFT | 1.00 | 1,046.00 | 1.25 | 1,307.50 | 2.00 | 2,092.00 | 2.00 | 2,092.00 | | 0042 | NS-MSC-00080 | Detectable Warning Surface Retrofit for Curb Ramps | 56 | EACH | 450.00 | 25,200.00 | 585.00 | 32,760.00 | 350.00 | 19,600.00 | 400.00 | 22,400.00 | | 0043 | TS-706-03000 | Concrete Pavers Sidewalk (Brick) | 9 | SQYD | 700.00 | 6,300.00 | 455.00 | 4,095.00 | 150.00 | 1,350.00 | 400.00 | 3,600.00 | | 0044 | TS-706-70100 | Concrete Walk 4” Thick (MESH REINFORCED) | 39 | SQYD | 195.00 | 7,605.00 | 140.00 | 5,460.00 | 90.00 | 3,510.00 | 175.00 | 6,825.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,143,737.50 | | 1,274,109.25 | | 1,611,626.42 | | 1,682,190.90 |
|