Bid Tabulations for the Letting of 2/11/2026 LA DOTD Headquarters

Proposal:H.014643.6
Parish:St. Bernard
Routes:LA 39
Description:LA 39: W. JUDGE PEREZ DR. ENHANCEMENTS
Type Construction:GRADING, SHARED USE PATH, SIDEWALKS, AND RELATED WORK.
Estimated Construction Cost:$1,439,394.29
Rank License BidderConstruction Bid
135678BEVERLY CONSTRUCTION CO. LLC$1,093,835.40
276669Alonso LLC$1,105,584.50
306276Barriere Construction Co., LLC$1,198,011.81
459972Pivotal Engineering, LLC$1,199,058.70
568424Procivil, LLC$1,279,157.00
648896Command Construction Industries LLC$1,294,703.25
714914Kass Bros. Inc.$1,310,445.40
849356KORT's CONSTRUCTION SERVICES, INC.$1,349,896.70
924901Hard Rock Construction LLC$1,427,705.30
1064262FMF GROUP LLC$1,451,027.93
117483921 Construction, L.L.C.$1,477,530.75
1255950Brown Industrial Construction, LLC$1,499,422.15
1302179Boh Bros. Construction Co., LLC.$1,523,996.00
1436961Cycle Construction Co. L.L.C.$1,546,722.60
1534263LA Contracting Enterprise, L.L.C.$1,593,000.00


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
BEVERLY CONSTRUCTION CO. LLC
- 2 -
Alonso LLC
- 3 -
Barriere Construction Co., LLC
- 4 -
Pivotal Engineering, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-01-00100Removal of Structures and Obstructions 1     LUMP3,000.003,000.005,000.005,000.005,250.005,250.005,000.005,000.00
0002202-02-02000Removal of Asphalt Drives 78     SQYD17.001,326.0040.003,120.0017.001,326.0025.001,950.00
0003202-02-06100Removal of Concrete Walks and Drives 3,438     SQYD18.0061,884.0020.0068,760.0017.0058,446.0015.0051,570.00
0004202-02-06140Removal of Curbs (Concrete) 445.2   LNFT6.002,671.2010.004,452.0012.005,342.4013.005,787.60
0006202-03-38000Relocation of Sign 8     EACH50.00400.00350.002,800.00200.001,600.00350.002,800.00
0007202-03-38020Relocation of Sign Pole See Spec Book8     EACH215.001,720.00350.002,800.00200.001,600.00350.002,800.00
0008203-01-00100General Excavation 378     CUYD85.0032,130.0035.0013,230.0060.0022,680.0045.0017,010.00
0009203-03-00100Embankment 227     CUYD95.0021,565.0060.0013,620.0085.0019,295.0085.0019,295.00
0010204-06-00100Temporary Silt Fencing 8,654     LNFT2.7523,798.503.5030,289.002.4020,769.603.0025,962.00
0011401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 100     CUYD58.005,800.00105.0010,500.00100.0010,000.00115.0011,500.00
0012702-04-00100Adjusting Manholes 16     EACH1,100.0017,600.002,000.0032,000.001,690.0027,040.002,000.0032,000.00
0013702-04-00200Adjusting Catch Basins 4     EACH1,500.006,000.004,000.0016,000.002,480.009,920.002,000.008,000.00
0014706-02-00300Concrete Drive (8" Thick) 1,974.5   SQYD82.00161,909.00100.00197,450.00110.00217,195.0092.00181,654.00
0015706-03-00200Incidental Concrete Paving (5" Thick) 65.5   SQYD135.008,842.5080.005,240.0073.004,781.5070.004,585.00
0016706-04-00110Curb Ramps Type 143.6   SQYD195.008,502.00265.0011,554.00175.007,630.00241.0010,507.60
0017706-04-00110Curb Ramps Type 353.8   SQYD235.0012,643.00200.0010,760.00175.009,415.00241.0012,965.80
0018706-04-00110Curb Ramps Type 7539.7   SQYD170.0091,749.00240.00129,528.00175.0094,447.50241.00130,067.70
0019707-01-00100Concrete Curb 299.1   LNFT28.008,374.8025.007,477.5061.0018,245.1050.0014,955.00
0020708-01-00100Right-of-Way Monument 21     EACH750.0015,750.00600.0012,600.00790.0016,590.00600.0012,600.00
0021713-01-00100Temporary Signs and Barricades 1     LUMP16,000.0016,000.0025,000.0025,000.0038,800.0038,800.0017,500.0017,500.00
0022714-01-00600Slab Sodding (St. Augustine) 2,422     SQYD10.0024,220.0014.0033,908.0010.0024,220.0012.0029,064.00
0023727-01-00100Mobilization 1     LUMP77,000.0077,000.0030,000.0030,000.0063,000.0063,000.0035,000.0035,000.00
0024729-01-00100Sign (Type A) 17.6   SQFT26.00457.6055.00968.0039.00686.4050.00880.00
0025729-22-00100Square Tubing Post with 2-1/4" Anchor 3     EACH260.00780.00300.00900.00370.001,110.00350.001,050.00
0026732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 1,033     LNFT13.0013,429.0015.0015,495.0014.0014,462.0020.0020,660.00
0027732-03-02012Plastic Pavement Striping (Dotted Line)(4" W)(3' L)(Thermo 90 mil) 1.007 MILE2,400.002,416.804,000.004,028.002,530.002,547.715,000.005,035.00
0028739-01-00100Hydro-Seeding 0.77  ACRE5,200.004,004.005,000.003,850.005,880.004,527.604,500.003,465.00
0029740-01-00100Construction Layout 1     LUMP6,500.006,500.004,000.004,000.0015,200.0015,200.005,000.005,000.00
0030741-29-00100Relocate Fire Hydrant 2     EACH5,500.0011,000.005,000.0010,000.003,480.006,960.006,000.0012,000.00
0031741-35-00100Adjust Valve or Meter Box 1     EACH325.00325.002,100.002,100.002,020.002,020.00500.00500.00
0032NS-706-00440Shared-Use Path (Portland Cement Concrete) (6" Thick) 5,987     SQYD74.00443,038.0065.00389,155.0075.00449,025.0085.00508,895.00
0033TS-700-02085Removable Steel Bollard 6     EACH1,500.009,000.001,500.009,000.003,980.0023,880.001,500.009,000.00
             
  CONTRACTOR TOTAL   1,093,835.40 1,105,584.50 1,198,011.81 1,199,058.70



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 5 -
Procivil, LLC
- 6 -
Command Construction Industries LLC
- 7 -
Kass Bros. Inc.
- 8 -
KORT's CONSTRUCTION SERVICES, INC.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-01-00100Removal of Structures and Obstructions 1     LUMP3,000.003,000.0050,000.0050,000.005,000.005,000.0015,000.0015,000.00
0002202-02-02000Removal of Asphalt Drives 78     SQYD20.001,560.0025.001,950.0023.001,794.0032.002,496.00
0003202-02-06100Removal of Concrete Walks and Drives 3,438     SQYD10.0034,380.0025.0085,950.0024.0082,512.0028.0096,264.00
0004202-02-06140Removal of Curbs (Concrete) 445.2   LNFT5.002,226.005.002,226.0021.009,349.2010.004,452.00
0006202-03-38000Relocation of Sign 8     EACH150.001,200.00100.00800.0055.00440.0045.00360.00
0007202-03-38020Relocation of Sign Pole See Spec Book8     EACH150.001,200.00100.00800.00600.004,800.00190.001,520.00
0008203-01-00100General Excavation 378     CUYD50.0018,900.0010.003,780.0070.0026,460.0075.0028,350.00
0009203-03-00100Embankment 227     CUYD50.0011,350.0010.002,270.0088.0019,976.0090.0020,430.00
0010204-06-00100Temporary Silt Fencing 8,654     LNFT0.504,327.005.0043,270.000.706,057.803.0025,962.00
0011401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 100     CUYD75.007,500.00100.0010,000.0060.006,000.0098.009,800.00
0012702-04-00100Adjusting Manholes 16     EACH3,000.0048,000.00500.008,000.00550.008,800.001,500.0024,000.00
0013702-04-00200Adjusting Catch Basins 4     EACH3,000.0012,000.002,000.008,000.00600.002,400.002,150.008,600.00
0014706-02-00300Concrete Drive (8" Thick) 1,974.5   SQYD120.00236,940.00125.00246,812.50121.00238,914.5098.00193,501.00
0015706-03-00200Incidental Concrete Paving (5" Thick) 65.5   SQYD130.008,515.00100.006,550.00140.009,170.0078.005,109.00
0016706-04-00110Curb Ramps Type 143.6   SQYD250.0010,900.00175.007,630.00130.005,668.00175.007,630.00
0017706-04-00110Curb Ramps Type 353.8   SQYD250.0013,450.00175.009,415.00205.0011,029.00275.0014,795.00
0018706-04-00110Curb Ramps Type 7539.7   SQYD250.00134,925.00175.0094,447.50205.00110,638.50340.00183,498.00
0019707-01-00100Concrete Curb 299.1   LNFT30.008,973.0025.007,477.5032.009,571.2021.006,281.10
0020708-01-00100Right-of-Way Monument 21     EACH700.0014,700.00750.0015,750.00450.009,450.00875.0018,375.00
0021713-01-00100Temporary Signs and Barricades 1     LUMP30,000.0030,000.0050,000.0050,000.0060,000.0060,000.00120,000.00120,000.00
0022714-01-00600Slab Sodding (St. Augustine) 2,422     SQYD12.0029,064.0010.0024,220.0010.0024,220.0011.0026,642.00
0023727-01-00100Mobilization 1     LUMP75,000.0075,000.00125,000.00125,000.0052,000.0052,000.0030,000.0030,000.00
0024729-01-00100Sign (Type A) 17.6   SQFT35.00616.0015.00264.0026.00457.6050.00880.00
0025729-22-00100Square Tubing Post with 2-1/4" Anchor 3     EACH300.00900.00200.00600.00260.00780.00245.00735.00
0026732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 1,033     LNFT15.0015,495.0015.0015,495.0019.0019,627.0014.0014,462.00
0027732-03-02012Plastic Pavement Striping (Dotted Line)(4" W)(3' L)(Thermo 90 mil) 1.007 MILE3,000.003,021.002,250.002,265.752,300.002,316.102,800.002,819.60
0028739-01-00100Hydro-Seeding 0.77  ACRE6,000.004,620.007,000.005,390.005,200.004,004.003,000.002,310.00
0029740-01-00100Construction Layout 1     LUMP25,000.0025,000.0025,000.0025,000.0011,000.0011,000.009,000.009,000.00
0030741-29-00100Relocate Fire Hydrant 2     EACH3,000.006,000.005,000.0010,000.004,000.008,000.009,000.0018,000.00
0031741-35-00100Adjust Valve or Meter Box 1     EACH500.00500.00250.00250.00200.00200.00600.00600.00
0032NS-706-00440Shared-Use Path (Portland Cement Concrete) (6" Thick) 5,987     SQYD85.00508,895.0070.00419,090.0091.50547,810.5075.00449,025.00
0033TS-700-02085Removable Steel Bollard 6     EACH1,000.006,000.002,000.0012,000.002,000.0012,000.001,500.009,000.00
             
  CONTRACTOR TOTAL   1,279,157.00 1,294,703.25 1,310,445.40 1,349,896.70



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 9 -
Hard Rock Construction LLC
- 10 -
FMF GROUP LLC
- 11 -
21 Construction, L.L.C.
- 12 -
Brown Industrial Construction, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-01-00100Removal of Structures and Obstructions 1     LUMP3,000.003,000.0020,039.2920,039.2950,000.0050,000.009,500.009,500.00
0002202-02-02000Removal of Asphalt Drives 78     SQYD26.002,028.0047.043,669.2026.002,028.0035.002,730.00
0003202-02-06100Removal of Concrete Walks and Drives 3,438     SQYD23.0079,074.0029.68102,026.0930.00103,140.0020.0068,760.00
0004202-02-06140Removal of Curbs (Concrete) 445.2   LNFT51.0022,705.2011.255,009.8411.004,897.2012.005,342.40
0006202-03-38000Relocation of Sign 8     EACH39.00312.0055.41443.28200.001,600.0035.00280.00
0007202-03-38020Relocation of Sign Pole See Spec Book8     EACH168.001,344.0069.26554.101,500.0012,000.00150.001,200.00
0008203-01-00100General Excavation 378     CUYD25.009,450.0032.6712,348.1330.0011,340.0040.0015,120.00
0009203-03-00100Embankment 227     CUYD26.005,902.0099.7722,648.2440.009,080.00100.0022,700.00
0010204-06-00100Temporary Silt Fencing 8,654     LNFT2.5021,635.003.1226,991.832.7523,798.503.5030,289.00
0011401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 100     CUYD137.0013,700.0072.627,261.60165.0016,500.00110.0011,000.00
0012702-04-00100Adjusting Manholes 16     EACH1,800.0028,800.00767.3512,277.541,150.0018,400.002,500.0040,000.00
0013702-04-00200Adjusting Catch Basins 4     EACH1,800.007,200.003,194.9812,779.941,650.006,600.006,000.0024,000.00
0014706-02-00300Concrete Drive (8" Thick) 1,974.5   SQYD114.00225,093.00149.67295,525.39140.00276,430.00160.00315,920.00
0015706-03-00200Incidental Concrete Paving (5" Thick) 65.5   SQYD292.0019,126.0079.675,218.32185.0012,117.50200.0013,100.00
0016706-04-00110Curb Ramps Type 143.6   SQYD322.0014,039.20160.376,992.04225.009,810.00175.007,630.00
0017706-04-00110Curb Ramps Type 353.8   SQYD370.0019,906.00160.378,627.80225.0012,105.00245.0013,181.00
0018706-04-00110Curb Ramps Type 7539.7   SQYD306.00165,148.20160.3786,550.61225.00121,432.50190.00102,543.00
0019707-01-00100Concrete Curb 299.1   LNFT22.006,580.2021.396,396.8540.0011,964.0060.0017,946.00
0020708-01-00100Right-of-Way Monument 21     EACH728.0015,288.0055.411,163.61775.0016,275.00700.0014,700.00
0021713-01-00100Temporary Signs and Barricades 1     LUMP21,000.0021,000.0051,234.5251,234.5255,000.0055,000.0083,000.0083,000.00
0022714-01-00600Slab Sodding (St. Augustine) 2,422     SQYD12.0029,064.0013.1331,805.7011.0026,642.0010.0024,220.00
0023727-01-00100Mobilization 1     LUMP132,000.00132,000.0018,099.5618,099.5660,000.0060,000.00135,000.00135,000.00
0024729-01-00100Sign (Type A) 17.6   SQFT45.00792.0034.63609.5138.00668.8040.00704.00
0025729-22-00100Square Tubing Post with 2-1/4" Anchor 3     EACH218.00654.00346.311,038.93375.001,125.00195.00585.00
0026732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 1,033     LNFT13.0013,429.0016.6217,171.5620.0020,660.0012.0012,396.00
0027732-03-02012Plastic Pavement Striping (Dotted Line)(4" W)(3' L)(Thermo 90 mil) 1.007 MILE2,500.002,517.503,116.793,138.612,750.002,769.252,250.002,265.75
0028739-01-00100Hydro-Seeding 0.77  ACRE2,800.002,156.006,847.905,272.886,500.005,005.005,000.003,850.00
0029740-01-00100Construction Layout 1     LUMP7,800.007,800.0018,571.9518,571.9525,000.0025,000.0020,000.0020,000.00
0030741-29-00100Relocate Fire Hydrant 2     EACH9,000.0018,000.009,004.0718,008.138,650.0017,300.005,000.0010,000.00
0031741-35-00100Adjust Valve or Meter Box 1     EACH506.00506.003,463.103,463.10500.00500.00500.00500.00
0032NS-706-00440Shared-Use Path (Portland Cement Concrete) (6" Thick) 5,987     SQYD88.00526,856.00106.41637,070.6889.00532,843.0080.00478,960.00
0033TS-700-02085Removable Steel Bollard 6     EACH2,100.0012,600.001,503.189,019.101,750.0010,500.002,000.0012,000.00
             
  CONTRACTOR TOTAL   1,427,705.30 1,451,027.93 1,477,530.75 1,499,422.15



Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 13 -
Boh Bros. Construction Co., LLC.
- 14 -
Cycle Construction Co. L.L.C.
- 15 -
LA Contracting Enterprise, L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001202-01-00100Removal of Structures and Obstructions 1     LUMP6,000.006,000.00100,000.00100,000.007,000.007,000.00
0002202-02-02000Removal of Asphalt Drives 78     SQYD18.001,404.0030.002,340.0015.001,170.00
0003202-02-06100Removal of Concrete Walks and Drives 3,438     SQYD10.0034,380.0022.0075,636.0026.0089,388.00
0004202-02-06140Removal of Curbs (Concrete) 445.2   LNFT15.006,678.0020.008,904.003.001,335.60
0006202-03-38000Relocation of Sign 8     EACH200.001,600.0040.00320.001.008.00
0007202-03-38020Relocation of Sign Pole See Spec Book8     EACH200.001,600.00175.001,400.001.008.00
0008203-01-00100General Excavation 378     CUYD52.0019,656.0029.0010,962.00150.0056,700.00
0009203-03-00100Embankment 227     CUYD94.0021,338.0039.008,853.00147.0033,369.00
0010204-06-00100Temporary Silt Fencing 8,654     LNFT3.0025,962.004.0034,616.000.0186.54
0011401-02-00100Aggregate Surface Course (Adjusted Vehicular Measurement) 100     CUYD160.0016,000.00175.0017,500.00198.0019,800.00
0012702-04-00100Adjusting Manholes 16     EACH1,400.0022,400.002,300.0036,800.001,700.0027,200.00
0013702-04-00200Adjusting Catch Basins 4     EACH1,400.005,600.002,900.0011,600.006,900.0027,600.00
0014706-02-00300Concrete Drive (8" Thick) 1,974.5   SQYD150.00296,175.0092.00181,654.00106.00209,297.00
0015706-03-00200Incidental Concrete Paving (5" Thick) 65.5   SQYD135.008,842.50103.006,746.50340.0022,270.00
0016706-04-00110Curb Ramps Type 143.6   SQYD300.0013,080.00125.005,450.00275.0011,990.00
0017706-04-00110Curb Ramps Type 353.8   SQYD320.0017,216.00125.006,725.00275.0014,795.00
0018706-04-00110Curb Ramps Type 7539.7   SQYD340.00183,498.00125.0067,462.50275.00148,417.50
0019707-01-00100Concrete Curb 299.1   LNFT50.0014,955.0019.005,682.9076.0022,731.60
0020708-01-00100Right-of-Way Monument 21     EACH135.002,835.00450.009,450.00850.0017,850.00
0021713-01-00100Temporary Signs and Barricades 1     LUMP45,000.0045,000.0085,000.0085,000.0072,000.0072,000.00
0022714-01-00600Slab Sodding (St. Augustine) 2,422     SQYD11.0026,642.0017.0041,174.0017.0041,174.00
0023727-01-00100Mobilization 1     LUMP33,000.0033,000.00215,000.00215,000.0082,916.8682,916.86
0024729-01-00100Sign (Type A) 17.6   SQFT40.00704.0046.00809.6030.00528.00
0025729-22-00100Square Tubing Post with 2-1/4" Anchor 3     EACH370.001,110.00225.00675.00300.00900.00
0026732-01-02080Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 1,033     LNFT13.0013,429.0014.0014,462.0022.0022,726.00
0027732-03-02012Plastic Pavement Striping (Dotted Line)(4" W)(3' L)(Thermo 90 mil) 1.007 MILE2,500.002,517.502,300.002,316.102,700.002,718.90
0028739-01-00100Hydro-Seeding 0.77  ACRE5,600.004,312.005,700.004,389.006,000.004,620.00
0029740-01-00100Construction Layout 1     LUMP45,000.0045,000.0055,000.0055,000.0020,000.0020,000.00
0030741-29-00100Relocate Fire Hydrant 2     EACH8,500.0017,000.006,400.0012,800.008,700.0017,400.00
0031741-35-00100Adjust Valve or Meter Box 1     EACH570.00570.00600.00600.002,700.002,700.00
0032NS-706-00440Shared-Use Path (Portland Cement Concrete) (6" Thick) 5,987     SQYD106.00634,622.0085.00508,895.00100.00598,700.00
0033TS-700-02085Removable Steel Bollard 6     EACH145.00870.002,250.0013,500.002,600.0015,600.00
           
  CONTRACTOR TOTAL   1,523,996.00 1,546,722.60 1,593,000.00