Proposal:H.014465.6-R2
Parish:Vermilion
Routes:LA 82
Description:LA 82: VERMILION RIVER MB RH(PERRY)(HBI)
Type Construction:PRECAST CONCRETE PILES, STEEL PILES, STRUCTURAL METALWORK, MOVABLE BRIDGE REHABILITATION, BRIDGE CLEANING AND PAINTING, AND RELATED WORK.
Estimated Construction Cost:$21,255,066.53
| Rank | License | Bidder | Construction Bid |
| 1 | 26435 | C.E.C., Inc. | $21,904,506.31 |
| 2 | 59114 | SOUTHERN ROAD & BRIDGE, LLC | $26,269,013.30 |
| 3 | 00009 | Coastal Contractors, LLC | $27,139,619.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - C.E.C., Inc. | - 2 - SOUTHERN ROAD & BRIDGE, LLC | - 3 - Coastal Contractors, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.6 | LUMP | 70,000.00 | 70,000.00 | 150,000.00 | 150,000.00 | 90,000.00 | 90,000.00 | | 0002 | 202-02-00050 | Removal of APPROACH SPAN STRUCTURAL STEEL | 1 | LUMP | 190,000.00 | 190,000.00 | 200,000.00 | 200,000.00 | 500,000.00 | 500,000.00 | | 0003 | 202-02-00050 | Removal of LIFT SPAN SOLE PLATES AND SHOES (LEAD COATED) | 1 | LUMP | 11,000.00 | 11,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | | 0004 | 202-02-00050 | Removal of LIFT SPAN STRUCTURAL STEEL (LEAD COATED) | 1 | LUMP | 65,000.00 | 65,000.00 | 75,000.00 | 75,000.00 | 200,000.00 | 200,000.00 | | 0005 | 202-02-00050 | Removal of MACHINERY PLATFORM STRUCTURAL STEEL (LEAD COATED) | 1 | LUMP | 23,000.00 | 23,000.00 | 55,000.00 | 55,000.00 | 75,000.00 | 75,000.00 | | 0006 | 202-02-00050 | Removal of PORTAL BRACING STRUCTURAL STEEL (LEAD COATED) | 1 | LUMP | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | | 0007 | 202-02-10000 | Removal of Existing Steel Grid Deck | 1 | LUMP | 50,000.00 | 50,000.00 | 75,000.00 | 75,000.00 | 75,000.00 | 75,000.00 | | 0008 | 202-02-12300 | Removal of Fender System | 1 | EACH | 475,000.00 | 475,000.00 | 600,000.00 | 600,000.00 | 600,000.00 | 600,000.00 | | 0009 | 202-02-30000 | Removal of Operators House | 1 | EACH | 40,000.00 | 40,000.00 | 125,000.00 | 125,000.00 | 50,000.00 | 50,000.00 | | 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 19,400.00 | 19,400.00 | 50,000.00 | 50,000.00 | 40,000.00 | 40,000.00 | | 0011 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 2 | EACH | 770.00 | 1,540.00 | 3,500.00 | 7,000.00 | 2,000.00 | 4,000.00 | | 0012 | 204-06-00100 | Temporary Silt Fencing | 952 | LNFT | 3.60 | 3,427.20 | 6.00 | 5,712.00 | 6.00 | 5,712.00 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 124.7 | TON | 330.00 | 41,151.00 | 344.00 | 42,896.80 | 430.00 | 53,621.00 | | 0014 | 703-03-00100 | Perforated Pipe Underdrains | 75 | LNFT | 120.00 | 9,000.00 | 88.00 | 6,600.00 | 70.00 | 5,250.00 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 50 | LNFT | 40.00 | 2,000.00 | 55.00 | 2,750.00 | 48.00 | 2,400.00 | | 0016 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 60 | LNFT | 92.00 | 5,520.00 | 175.00 | 10,500.00 | 75.00 | 4,500.00 | | 0017 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 138.00 | 13,800.00 | 225.00 | 22,500.00 | 180.00 | 18,000.00 | | 0018 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 1 | EACH | 4,120.00 | 4,120.00 | 4,850.00 | 4,850.00 | 5,200.00 | 5,200.00 | | 0019 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 3 | EACH | 4,560.00 | 13,680.00 | 4,850.00 | 14,550.00 | 5,600.00 | 16,800.00 | | 0020 | 711-01-02080 | Riprap (10 lb, 24" Thick) | 376 | SQYD | 250.00 | 94,000.00 | 333.00 | 125,208.00 | 325.00 | 122,200.00 | | 0021 | 711-04-00100 | Geotextile Fabric | 376 | SQYD | 8.00 | 3,008.00 | 5.00 | 1,880.00 | 12.00 | 4,512.00 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 175,000.00 | 175,000.00 | 200,000.00 | 200,000.00 | 125,000.00 | 125,000.00 | | 0023 | 713-11-00100 | Portable Changeable Message Signs | 5 | EACH | 8,700.00 | 43,500.00 | 5,000.00 | 25,000.00 | 32,000.00 | 160,000.00 | | 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 2,100,000.00 | 2,100,000.00 | 2,000,000.00 | 2,000,000.00 | 2,700,000.00 | 2,700,000.00 | | 0025 | 729-06-00102 | Sign (Overhead Mounted)(Furnish and Install) | 56 | SQFT | 150.00 | 8,400.00 | 100.00 | 5,600.00 | 105.00 | 5,880.00 | | 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 20 | EACH | 12.00 | 240.00 | 65.00 | 1,300.00 | 35.00 | 700.00 | | 0027 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.292 | MILE | 11,820.00 | 3,451.44 | 30,000.00 | 8,760.00 | 15,500.00 | 4,526.00 | | 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 48,500.00 | 48,500.00 | 175,000.00 | 175,000.00 | | 0029 | 804-01-00200 | Precast Concrete Piles (14") | 213 | LNFT | 285.00 | 60,705.00 | 480.00 | 102,240.00 | 450.00 | 95,850.00 | | 0030 | 804-01-00400 | Precast Concrete Piles (18") | 1,280 | LNFT | 245.00 | 313,600.00 | 495.00 | 633,600.00 | 350.00 | 448,000.00 | | 0031 | 804-01-00600 | Precast Concrete Piles (24") | 700 | LNFT | 380.00 | 266,000.00 | 505.00 | 353,500.00 | 500.00 | 350,000.00 | | 0032 | 804-03-01800 | Steel Piles (24" Pipe) | 8,492 | LNFT | 295.00 | 2,505,140.00 | 650.00 | 5,519,800.00 | 675.00 | 5,732,100.00 | | 0033 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 45,000.00 | 45,000.00 | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 | | 0034 | 804-18-00100 | Vibration Monitoring | 60 | DAY | 1,000.00 | 60,000.00 | 2,200.00 | 132,000.00 | 1,700.00 | 102,000.00 | | 0035 | 805-01-00200 | Class A1 Concrete (Deck) | 205.17 | CUYD | 2,950.00 | 605,251.50 | 3,400.00 | 697,578.00 | 4,200.00 | 861,714.00 | | 0036 | 805-01-00900 | Class A1 Concrete (GENERATOR PLATFORM) | 25.93 | CUYD | 4,600.00 | 119,278.00 | 4,200.00 | 108,906.00 | 4,300.00 | 111,499.00 | | 0037 | 805-01-00900 | Class A1 Concrete (MOVABLE TRAFFIC BARRIER PILE CAP) | 10.71 | CUYD | 4,200.00 | 44,982.00 | 5,450.00 | 58,369.50 | 4,400.00 | 47,124.00 | | 0038 | 805-01-00900 | Class A1 Concrete (OPERATOR'S HOUSE FIRST FLOOR SLAB) | 48.65 | CUYD | 4,000.00 | 194,600.00 | 4,500.00 | 218,925.00 | 4,300.00 | 209,195.00 | | 0039 | 805-01-00900 | Class A1 Concrete (TRAFFIC GATE FOUNDATION) | 11.6 | CUYD | 3,000.00 | 34,800.00 | 6,500.00 | 75,400.00 | 4,000.00 | 46,400.00 | | 0040 | 805-01-00900 | Class A1 Concrete (WALKWAY TO OPERATOR'S HOUSE) | 26.52 | CUYD | 8,300.00 | 220,116.00 | 4,500.00 | 119,340.00 | 4,900.00 | 129,948.00 | | 0041 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) (OPERATOR'S HOUSE) | 437 | SQFT | 20.00 | 8,740.00 | 6.00 | 2,622.00 | 4.50 | 1,966.50 | | 0042 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) (CLASS 3 SPECIAL FINISH)(OPERATOR'S HOUSE) | 437 | SQFT | 15.00 | 6,555.00 | 6.00 | 2,622.00 | 25.00 | 10,925.00 | | 0043 | 806-01-00100 | Deformed Reinforcing Steel (APPROACH SPANS) | 96,400 | LB | 1.70 | 163,880.00 | 2.20 | 212,080.00 | 3.00 | 289,200.00 | | 0044 | 806-01-00100 | Deformed Reinforcing Steel (GENERATOR PLATFORM) | 7,687 | LB | 1.98 | 15,220.26 | 2.00 | 15,374.00 | 3.00 | 23,061.00 | | 0045 | 806-01-00100 | Deformed Reinforcing Steel (MOVABLE TRAFFIC BARRIER PILE CAP) | 1,203 | LB | 2.77 | 3,332.31 | 3.00 | 3,609.00 | 3.00 | 3,609.00 | | 0046 | 806-01-00100 | Deformed Reinforcing Steel (OPERATOR'S HOUSE FIRST FLOOR SLAB) | 16,418 | LB | 1.90 | 31,194.20 | 2.00 | 32,836.00 | 3.00 | 49,254.00 | | 0047 | 806-01-00100 | Deformed Reinforcing Steel (TRAFFIC GATE FOUNDATION) | 1,288 | LB | 2.60 | 3,348.80 | 4.00 | 5,152.00 | 3.00 | 3,864.00 | | 0048 | 806-01-00100 | Deformed Reinforcing Steel (WALKWAY TO OPERATOR'S HOUSE) | 4,052 | LB | 0.30 | 1,215.60 | 4.00 | 16,208.00 | 4.50 | 18,234.00 | | 0049 | 807-01-00200 | Structural Metalwork (Grade 50) | 167,811 | LUMP | 1,580,000.00 | 1,580,000.00 | 1,400,000.00 | 1,400,000.00 | 1,370,000.00 | 1,370,000.00 | | 0050 | 807-03-00100 | Structural Metalwork (Access System) | 6,950 | LUMP | 200,000.00 | 200,000.00 | 185,000.00 | 185,000.00 | 135,000.00 | 135,000.00 | | 0051 | 807-04-00100 | Structural Metalwork (FENDER ACCESS) | 164,300 | LUMP | 1,530,000.00 | 1,530,000.00 | 325,000.00 | 325,000.00 | 365,000.00 | 365,000.00 | | 0052 | 808-01-00300 | Steel Grid Flooring (LIFT SPAN) | 1,805 | SQFT | 270.00 | 487,350.00 | 245.00 | 442,225.00 | 260.00 | 469,300.00 | | 0053 | 810-04-00100 | Hand Railing (FENDER WALKWAY, AND ACCESS SYSTEM) | 495 | LNFT | 295.00 | 146,025.00 | 350.00 | 173,250.00 | 315.00 | 155,925.00 | | 0054 | 810-04-00100 | Hand Railing (GENERATOR PLATFORM) | 107 | LNFT | 375.00 | 40,125.00 | 360.00 | 38,520.00 | 430.00 | 46,010.00 | | 0055 | 810-04-00100 | Hand Railing (MACHINERY TOWER PLATFORM WITH TOE PLATE) | 320 | LNFT | 360.00 | 115,200.00 | 250.00 | 80,000.00 | 315.00 | 100,800.00 | | 0056 | 810-04-00100 | Hand Railing (MOVABLE TRAFFIC BARRIERS AND MAIN PIER) | 144 | LNFT | 540.00 | 77,760.00 | 350.00 | 50,400.00 | 240.00 | 34,560.00 | | 0057 | 810-04-00100 | Hand Railing (WALKWAY TO OPERATOR'S HOUSE) | 346 | LNFT | 325.00 | 112,450.00 | 250.00 | 86,500.00 | 265.00 | 91,690.00 | | 0058 | 811-01-00100 | Cleaning and Painting Lift Span and Approaches | 71,875 | LUMP | 1,750,000.00 | 1,750,000.00 | 1,850,000.00 | 1,850,000.00 | 1,680,000.00 | 1,680,000.00 | | 0059 | 818-04-00100 | Reinforced Plastic Composite Marine Timber (6"x12") | 1,881 | LNFT | 200.00 | 376,200.00 | 350.00 | 658,350.00 | 290.00 | 545,490.00 | | 0060 | 820-02-00100 | Temporary Operation & Maintenance of Movable Span | 100 | DAY | 840.00 | 84,000.00 | 1,000.00 | 100,000.00 | 500.00 | 50,000.00 | | 0061 | 820-03-00100 | Weighing and Balancing of Movable Span | 1 | LUMP | 110,000.00 | 110,000.00 | 25,000.00 | 25,000.00 | 165,000.00 | 165,000.00 | | 0062 | 830-01-00100 | Bridge Superstructure Repair (APPROACH SPAN) | 10 | EACH | 20,000.00 | 200,000.00 | 25,000.00 | 250,000.00 | 8,200.00 | 82,000.00 | | 0063 | 830-01-00100 | Bridge Superstructure Repair (CLEANING AND PAINTING COUNTERWEIGHTS) | 2 | EACH | 33,600.00 | 67,200.00 | 100,000.00 | 200,000.00 | 15,000.00 | 30,000.00 | | 0064 | 830-01-00100 | Bridge Superstructure Repair (LIFT GIRDER SHOES, PLATES & SOLE PLATES) | 4 | EACH | 14,000.00 | 56,000.00 | 15,000.00 | 60,000.00 | 18,000.00 | 72,000.00 | | 0065 | 830-01-00100 | Bridge Superstructure Repair (LIFT SPAN) | 1 | EACH | 275,000.00 | 275,000.00 | 350,000.00 | 350,000.00 | 376,000.00 | 376,000.00 | | 0066 | 830-01-00100 | Bridge Superstructure Repair (PORTAL BRACING) | 2 | EACH | 250,000.00 | 500,000.00 | 350,000.00 | 700,000.00 | 267,000.00 | 534,000.00 | | 0067 | 830-01-00100 | Bridge Superstructure Repair (TOWER DRIVE MACHINERY DECK) | 1 | EACH | 225,000.00 | 225,000.00 | 350,000.00 | 350,000.00 | 275,000.00 | 275,000.00 | | 0068 | 830-01-00100 | Bridge Superstructure Repair [BRIDGE RAILING] | 1 | EACH | 310,000.00 | 310,000.00 | 280,000.00 | 280,000.00 | 770,000.00 | 770,000.00 | | 0069 | 830-02-00100 | Bridge Substructure Repair (CLEANING EXISTING CONCRETE SURFACES) | 14 | EACH | 3,500.00 | 49,000.00 | 6,500.00 | 91,000.00 | 9,900.00 | 138,600.00 | | 0070 | 830-02-00100 | Bridge Substructure Repair (PIER MODIFICATION) | 2 | EACH | 60,000.00 | 120,000.00 | 150,000.00 | 300,000.00 | 102,000.00 | 204,000.00 | | 0071 | NS-818-00001 | Navigation Clearance Gauge (Mounted) | 2 | EACH | 10,000.00 | 20,000.00 | 7,500.00 | 15,000.00 | 3,500.00 | 7,000.00 | | 0072 | TS-821-02100 | Vertical Lift Bridge Machinery | 1 | LUMP | 2,125,000.00 | 2,125,000.00 | 1,950,000.00 | 1,950,000.00 | 2,300,000.00 | 2,300,000.00 | | 0073 | TS-821-06100 | Coating of New Movable Bridge Machinery | 1 | LUMP | 30,000.00 | 30,000.00 | 50,000.00 | 50,000.00 | 15,000.00 | 15,000.00 | | 0074 | TS-821-06200 | Coating of Existing Movable Bridge Machinery | 1 | LUMP | 30,000.00 | 30,000.00 | 95,000.00 | 95,000.00 | 60,000.00 | 60,000.00 | | 0075 | TS-822-09100 | Electrical System (BRIDGE) | 1 | LUMP | 2,250,000.00 | 2,250,000.00 | 2,950,000.00 | 2,950,000.00 | 2,200,000.00 | 2,200,000.00 | | 0076 | TS-823-01100 | Bridge Operator's House New Construction | 1 | LUMP | 800,000.00 | 800,000.00 | 950,000.00 | 950,000.00 | 1,200,000.00 | 1,200,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 21,904,506.31 | | 26,269,013.30 | | 27,139,619.50 |
|