Proposal:H.008220.6
Parish:Plaquemines
Routes:LA 406
Description:LA 406: ROUNDABOUT AT FE HEBERT
Type Construction:CLEARING AND GRUBBING, GRADING, MILLING ASPHALT CONCRETE, DRAINAGE STRUCTURES, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$4,443,599.17
| Rank | License | Bidder | Construction Bid |
| 1 | 49356 | KORT's CONSTRUCTION SERVICES, INC. | $3,191,956.30 |
| 2 | 35678 | BEVERLY CONSTRUCTION CO. LLC | $3,328,323.47 |
| 3 | 68237 | GULF STATES SERVICES, LLC | $3,394,564.18 |
| 4 | 06276 | Barriere Construction Co., LLC | $3,405,487.80 |
| 5 | 48896 | Command Construction Industries LLC | $3,571,588.15 |
| 6 | 34263 | LA Contracting Enterprise, L.L.C. | $3,947,126.18 |
| 7 | 24901 | Hard Rock Construction LLC | $4,201,777.20 |
| 8 | 28190 | Buck Town Contractors & Co. | $4,389,705.80 |
| 9 | 02179 | Boh Bros. Construction Co., LLC. | $4,797,303.89 |
| 10 | 36961 | Cycle Construction Co. L.L.C. | $4,896,606.74 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - KORT's CONSTRUCTION SERVICES, INC. | - 2 - BEVERLY CONSTRUCTION CO. LLC | - 3 - GULF STATES SERVICES, LLC | - 4 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.55 | LUMP | 15,000.00 | 15,000.00 | 35,000.00 | 35,000.00 | 5,000.00 | 5,000.00 | 12,000.00 | 12,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 26,000.00 | 26,000.00 | 26,500.00 | 26,500.00 | 3,100.00 | 3,100.00 | | 0003 | 202-02-00010 | Removal of Utility Manholes | 1 | EACH | 1,250.00 | 1,250.00 | 900.00 | 900.00 | 2,000.00 | 2,000.00 | 760.00 | 760.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 1,564.9 | SQYD | 25.00 | 39,122.50 | 24.00 | 37,557.60 | 25.00 | 39,122.50 | 14.00 | 21,908.60 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,086 | SQYD | 20.00 | 21,720.00 | 14.00 | 15,204.00 | 25.00 | 27,150.00 | 19.00 | 20,634.00 | | 0006 | 202-02-06140 | Removal of Curbs (Concrete) | 354.2 | LNFT | 15.00 | 5,313.00 | 6.00 | 2,125.20 | 16.00 | 5,667.20 | 3.00 | 1,062.60 | | 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,657 | SQYD | 25.00 | 41,425.00 | 15.00 | 24,855.00 | 25.00 | 41,425.00 | 12.00 | 19,884.00 | | 0008 | 202-02-38240 | Removal of Signs and Supports | 12 | EACH | 100.00 | 1,200.00 | 15.00 | 180.00 | 25.00 | 300.00 | 27.00 | 324.00 | | 0009 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 25,000.00 | 25,000.00 | 5,000.00 | 5,000.00 | 4,000.00 | 4,000.00 | 5,530.00 | 5,530.00 | | 0010 | 203-01-00100 | General Excavation | 5,056 | CUYD | 22.00 | 111,232.00 | 17.50 | 88,480.00 | 26.50 | 133,984.00 | 24.00 | 121,344.00 | | 0011 | 203-03-00100 | Embankment | 5,499 | CUYD | 30.00 | 164,970.00 | 27.00 | 148,473.00 | 37.50 | 206,212.50 | 30.00 | 164,970.00 | | 0012 | 203-04-00200 | Nonplastic Embankment (Sand) | 2,630 | CUYD | 30.00 | 78,900.00 | 31.00 | 81,530.00 | 45.00 | 118,350.00 | 36.00 | 94,680.00 | | 0013 | 203-08-00100 | Geotextile Fabric | 6,178 | SQYD | 1.50 | 9,267.00 | 1.35 | 8,340.30 | 1.50 | 9,267.00 | 1.80 | 11,120.40 | | 0014 | 204-02-00100 | Temporary Hay Bales | 24 | EACH | 30.00 | 720.00 | 25.00 | 600.00 | 25.00 | 600.00 | 66.00 | 1,584.00 | | 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 18 | EACH | 315.00 | 5,670.00 | 155.00 | 2,790.00 | 155.00 | 2,790.00 | 160.00 | 2,880.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 2,946 | LNFT | 3.00 | 8,838.00 | 2.50 | 7,365.00 | 2.75 | 8,101.50 | 2.50 | 7,365.00 | | 0017 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 5,258.4 | SQYD | 26.00 | 136,718.40 | 41.00 | 215,594.40 | 32.50 | 170,898.00 | 26.00 | 136,718.40 | | 0018 | 401-01-00100 | Aggregate Surface Course (Net Section) | 24.5 | CUYD | 105.00 | 2,572.50 | 55.00 | 1,347.50 | 125.00 | 3,062.50 | 230.00 | 5,635.00 | | 0019 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 128.6 | CUYD | 105.00 | 13,503.00 | 55.00 | 7,073.00 | 1.00 | 128.60 | 190.00 | 24,434.00 | | 0020 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 613 | SQYD | 45.00 | 27,585.00 | 75.00 | 45,975.00 | 1.00 | 613.00 | 22.00 | 13,486.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 3,674.1 | TON | 161.00 | 591,530.10 | 142.00 | 521,722.20 | 165.00 | 606,226.50 | 140.00 | 514,374.00 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 40 | TON | 650.00 | 26,000.00 | 540.00 | 21,600.00 | 410.00 | 16,400.00 | 390.00 | 15,600.00 | | 0023 | 509-01-00100 | Milling Asphalt Pavement | 3,338 | SQYD | 9.00 | 30,042.00 | 8.25 | 27,538.50 | 8.00 | 26,704.00 | 6.80 | 22,698.40 | | 0024 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -185 | CUYD | 0.01 | -1.85 | 0.01 | -1.85 | 1.00 | -185.00 | 0.10 | -18.50 | | 0025 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 170 | SQYD | 250.00 | 42,500.00 | 155.00 | 26,350.00 | 170.00 | 28,900.00 | 120.00 | 20,400.00 | | 0026 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) 11" | 561.3 | SQYD | 150.00 | 84,195.00 | 140.00 | 78,582.00 | 165.00 | 92,614.50 | 130.00 | 72,969.00 | | 0027 | 701-02-01100 | Cross Drain Pipe Arch (54" Equiv. RCPA) | 378 | LNFT | 350.00 | 132,300.00 | 435.00 | 164,430.00 | 355.00 | 134,190.00 | 385.00 | 145,530.00 | | 0028 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 208 | LNFT | 425.00 | 88,400.00 | 525.00 | 109,200.00 | 450.00 | 93,600.00 | 500.00 | 104,000.00 | | 0029 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 364 | LNFT | 75.00 | 27,300.00 | 113.00 | 41,132.00 | 125.00 | 45,500.00 | 130.00 | 47,320.00 | | 0030 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 272 | LNFT | 110.00 | 29,920.00 | 117.00 | 31,824.00 | 155.00 | 42,160.00 | 150.00 | 40,800.00 | | 0031 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 450 | LNFT | 160.00 | 72,000.00 | 160.00 | 72,000.00 | 225.00 | 101,250.00 | 220.00 | 99,000.00 | | 0032 | 701-15-00100 | Concrete Collar | 1 | EACH | 2,700.00 | 2,700.00 | 2,500.00 | 2,500.00 | 3,800.00 | 3,800.00 | 1,880.00 | 1,880.00 | | 0033 | 701-16-01060 | Plastic Pipe (Extension) (24" RPVCP) | 5 | LNFT | 275.00 | 1,375.00 | 310.00 | 1,550.00 | 200.00 | 1,000.00 | 560.00 | 2,800.00 | | 0034 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 1,672 | LNFT | 5.00 | 8,360.00 | 3.50 | 5,852.00 | 0.10 | 167.20 | 0.10 | 167.20 | | 0035 | 702-03-00100 | Catch Basins (CB-01) | 12 | EACH | 7,800.00 | 93,600.00 | 4,200.00 | 50,400.00 | 5,900.00 | 70,800.00 | 4,970.00 | 59,640.00 | | 0036 | 702-03-00500 | Catch Basins (CB-06) | 11 | EACH | 9,700.00 | 106,700.00 | 4,700.00 | 51,700.00 | 9,000.00 | 99,000.00 | 5,550.00 | 61,050.00 | | 0037 | 706-02-00200 | Concrete Drive (6" Thick) | 974.6 | SQYD | 85.00 | 82,841.00 | 70.00 | 68,222.00 | 90.00 | 87,714.00 | 100.00 | 97,460.00 | | 0038 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) 5" | 740.1 | SQYD | 90.00 | 66,609.00 | 75.00 | 55,507.50 | 105.00 | 77,710.50 | 96.00 | 71,049.60 | | 0039 | 707-01-00100 | Concrete Curb | 1,825.2 | LNFT | 19.00 | 34,678.80 | 25.00 | 45,630.00 | 34.00 | 62,056.80 | 40.00 | 73,008.00 | | 0040 | 707-03-00100 | Combination Concrete Curb and Gutter | 2,820 | LNFT | 36.00 | 101,520.00 | 40.00 | 112,800.00 | 45.00 | 126,900.00 | 42.00 | 118,440.00 | | 0041 | 708-01-00100 | Right-of-Way Monument | 16 | EACH | 800.00 | 12,800.00 | 675.00 | 10,800.00 | 650.00 | 10,400.00 | 710.00 | 11,360.00 | | 0042 | 710-01-00100 | Flowable Fill | 8 | CUYD | 280.00 | 2,240.00 | 625.00 | 5,000.00 | 550.00 | 4,400.00 | 1,200.00 | 9,600.00 | | 0043 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 138,000.00 | 138,000.00 | 110,000.00 | 110,000.00 | 173,000.00 | 173,000.00 | | 0044 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 298 | LNFT | 0.50 | 149.00 | 0.40 | 119.20 | 0.36 | 107.28 | 0.40 | 119.20 | | 0045 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 430 | LNFT | 1.50 | 645.00 | 1.10 | 473.00 | 1.00 | 430.00 | 1.10 | 473.00 | | 0046 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.056 | MILE | 1,000.00 | 56.00 | 445.00 | 24.92 | 1,100.00 | 61.60 | 700.00 | 39.20 | | 0047 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.197 | MILE | 1,200.00 | 9,836.40 | 1,050.00 | 8,606.85 | 1,100.00 | 9,016.70 | 1,100.00 | 9,016.70 | | 0048 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 18 | EACH | 8.00 | 144.00 | 7.50 | 135.00 | 7.00 | 126.00 | 7.70 | 138.60 | | 0049 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 993 | SQYD | 2.00 | 1,986.00 | 1.50 | 1,489.50 | 1.50 | 1,489.50 | 2.20 | 2,184.60 | | 0050 | 724-01-00100 | Rumble Strips (Centerline) | 0.018 | MILE | 6,700.00 | 120.60 | 250,000.00 | 4,500.00 | 50,000.00 | 900.00 | 213,000.00 | 3,834.00 | | 0051 | 725-01-00100 | Temporary Detour Roads | 338 | SQYD | 175.00 | 59,150.00 | 165.00 | 55,770.00 | 115.00 | 38,870.00 | 94.00 | 31,772.00 | | 0052 | 726-01-00100 | Bedding Material | 196.2 | CUYD | 125.00 | 24,525.00 | 105.00 | 20,601.00 | 1.00 | 196.20 | 110.00 | 21,582.00 | | 0053 | 727-01-00100 | Mobilization | 1 | LUMP | 185,000.00 | 185,000.00 | 315,000.00 | 315,000.00 | 245,000.00 | 245,000.00 | 330,000.00 | 330,000.00 | | 0054 | 729-01-00100 | Sign (Type A) | 320 | SQFT | 35.00 | 11,200.00 | 16.00 | 5,120.00 | 18.00 | 5,760.00 | 33.00 | 10,560.00 | | 0055 | 729-02-00100 | Sign (Type B) | 41.3 | SQFT | 55.00 | 2,271.50 | 16.00 | 660.80 | 18.00 | 743.40 | 49.00 | 2,023.70 | | 0056 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 4 | EACH | 180.00 | 720.00 | 260.00 | 1,040.00 | 275.00 | 1,100.00 | 160.00 | 640.00 | | 0057 | 731-02-00100 | Reflectorized Raised Pavement Markers | 114 | EACH | 8.00 | 912.00 | 7.25 | 826.50 | 8.00 | 912.00 | 7.70 | 877.80 | | 0058 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 439 | LNFT | 4.00 | 1,756.00 | 3.75 | 1,646.25 | 3.50 | 1,536.50 | 3.80 | 1,668.20 | | 0059 | 732-01-05400 | Plastic Pavement Striping (Dotted Line)(24" W)(2' L)(Thermo 125 mil) | 191 | LNFT | 15.00 | 2,865.00 | 12.50 | 2,387.50 | 12.00 | 2,292.00 | 13.00 | 2,483.00 | | 0060 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.294 | MILE | 5,500.00 | 7,117.00 | 4,600.00 | 5,952.40 | 4,500.00 | 5,823.00 | 5,000.00 | 6,470.00 | | 0061 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 365.00 | 730.00 | 325.00 | 650.00 | 300.00 | 600.00 | 330.00 | 660.00 | | 0062 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 2 | EACH | 600.00 | 1,200.00 | 525.00 | 1,050.00 | 500.00 | 1,000.00 | 550.00 | 1,100.00 | | 0063 | 739-01-00100 | Hydro-Seeding | 3.77 | ACRE | 3,400.00 | 12,818.00 | 2,800.00 | 10,556.00 | 2,800.00 | 10,556.00 | 3,010.00 | 11,347.70 | | 0064 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 65,000.00 | 65,000.00 | 27,000.00 | 27,000.00 | 45,000.00 | 45,000.00 | | 0065 | NS-300-00060 | Geogrid | 5,258 | SQYD | 1.50 | 7,887.00 | 1.25 | 6,572.50 | 1.50 | 7,887.00 | 1.60 | 8,412.80 | | 0066 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 143 | LNFT | 21.00 | 3,003.00 | 5.50 | 786.50 | 6.50 | 929.50 | 21.00 | 3,003.00 | | 0067 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 444 | LNFT | 22.00 | 9,768.00 | 5.50 | 2,442.00 | 6.50 | 2,886.00 | 21.00 | 9,324.00 | | 0068 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 22,880 | INLF | 1.00 | 22,880.00 | 1.00 | 22,880.00 | 0.70 | 16,016.00 | 0.72 | 16,473.60 | | 0069 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 7,587 | INLF | 1.25 | 9,483.75 | 1.00 | 7,587.00 | 1.00 | 7,587.00 | 1.20 | 9,104.40 | | 0070 | NS-602-00001 | Milling Concrete Pavement | 528.6 | SQYD | 36.00 | 19,029.60 | 32.00 | 16,915.20 | 22.00 | 11,629.20 | 21.00 | 11,100.60 | | 0071 | NS-702-00101 | Paved Gutter Drain (Single) | 10 | EACH | 4,000.00 | 40,000.00 | 4,000.00 | 40,000.00 | 7,000.00 | 70,000.00 | 5,780.00 | 57,800.00 | | 0072 | NS-702-00102 | Paved Gutter Drain (Double) | 1 | EACH | 6,500.00 | 6,500.00 | 7,400.00 | 7,400.00 | 8,000.00 | 8,000.00 | 10,700.00 | 10,700.00 | | 0073 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad | 31 | EACH | 1,400.00 | 43,400.00 | 1,050.00 | 32,550.00 | 1,000.00 | 31,000.00 | 1,260.00 | 39,060.00 | | 0074 | NS-729-00030 | Breakaway Square Tubing Sign Support (Wet Concrete) | 10 | EACH | 975.00 | 9,750.00 | 265.00 | 2,650.00 | 275.00 | 2,750.00 | 880.00 | 8,800.00 | | 0075 | TS-741-01100 | Water Main (8" PVC) (PVC/C-900 Pipe) | 20 | LNFT | 50.00 | 1,000.00 | 220.00 | 4,400.00 | 199.00 | 3,980.00 | 97.00 | 1,940.00 | | 0076 | TS-741-01110 | Water Main (12" PVC) (PVC/C-900 Pipe) | 75 | LNFT | 84.00 | 6,300.00 | 240.00 | 18,000.00 | 149.00 | 11,175.00 | 95.00 | 7,125.00 | | 0077 | TS-741-02092 | Water Main (8") (HDPE Pipe) (DR 17) | 187 | LNFT | 100.00 | 18,700.00 | 140.00 | 26,180.00 | 89.00 | 16,643.00 | 150.00 | 28,050.00 | | 0078 | TS-741-02093 | Water Main (12") (HDPE Pipe) (DR 17) | 286 | LNFT | 115.00 | 32,890.00 | 175.00 | 50,050.00 | 124.00 | 35,464.00 | 180.00 | 51,480.00 | | 0079 | TS-741-10004 | New 6" Valve | 2 | EACH | 3,300.00 | 6,600.00 | 3,400.00 | 6,800.00 | 2,440.00 | 4,880.00 | 1,800.00 | 3,600.00 | | 0080 | TS-741-10005 | New 8" Valve | 2 | EACH | 3,900.00 | 7,800.00 | 3,900.00 | 7,800.00 | 3,280.00 | 6,560.00 | 2,380.00 | 4,760.00 | | 0081 | TS-741-37056 | Check Valve | 1 | EACH | 4,500.00 | 4,500.00 | 4,900.00 | 4,900.00 | 6,900.00 | 6,900.00 | 2,480.00 | 2,480.00 | | 0082 | TS-741-60014 | Field Hydrostatic and Leakage Test of Water Mains | 1 | LUMP | 15,500.00 | 15,500.00 | 4,500.00 | 4,500.00 | 1,800.00 | 1,800.00 | 5,180.00 | 5,180.00 | | 0083 | TS-741-60040 | Connect Water Main to Existing Water Main | 3 | EACH | 2,260.00 | 6,780.00 | 2,200.00 | 6,600.00 | 5,500.00 | 16,500.00 | 8,140.00 | 24,420.00 | | 0084 | TS-741-60044 | Testing and Disinfection of Water Mains | 568 | LNFT | 20.00 | 11,360.00 | 3.25 | 1,846.00 | 4.00 | 2,272.00 | 6.00 | 3,408.00 | | 0085 | TS-741-70110 | Pipe Restraints (6") | 4 | EACH | 110.00 | 440.00 | 215.00 | 860.00 | 330.00 | 1,320.00 | 370.00 | 1,480.00 | | 0086 | TS-741-70112 | Pipe Restraints (8") | 4 | EACH | 135.00 | 540.00 | 300.00 | 1,200.00 | 400.00 | 1,600.00 | 420.00 | 1,680.00 | | 0087 | TS-741-70114 | Pipe Restraints (12") | 8 | EACH | 160.00 | 1,280.00 | 320.00 | 2,560.00 | 770.00 | 6,160.00 | 590.00 | 4,720.00 | | 0088 | TS-742-01042 | Testing of Force Mains | 1 | LUMP | 11,000.00 | 11,000.00 | 4,500.00 | 4,500.00 | 2,380.00 | 2,380.00 | 5,180.00 | 5,180.00 | | 0089 | TS-742-10002 | Install Sewer Manhole | 1 | EACH | 7,800.00 | 7,800.00 | 7,000.00 | 7,000.00 | 11,990.00 | 11,990.00 | 9,030.00 | 9,030.00 | | 0090 | TS-742-60005 | Connect Sewer Force Main to Existing Sewer Force Main | 4 | EACH | 2,300.00 | 9,200.00 | 6,000.00 | 24,000.00 | 4,400.00 | 17,600.00 | 8,670.00 | 34,680.00 | | 0091 | TS-742-60007 | Field Hydrostatic and Leakage Test of Sewer Force Mains | 1 | LUMP | 3,100.00 | 3,100.00 | 4,500.00 | 4,500.00 | 1,600.00 | 1,600.00 | 7,770.00 | 7,770.00 | | 0092 | TS-742-60011 | Air Release/Vacuum Valve (2") | 2 | EACH | 11,500.00 | 23,000.00 | 7,300.00 | 14,600.00 | 5,800.00 | 11,600.00 | 7,630.00 | 15,260.00 | | 0093 | TS-742-60026 | Sewer Force Main (6") (HDPE PIPE) (DR 17) | 315 | LNFT | 87.00 | 27,405.00 | 100.00 | 31,500.00 | 74.00 | 23,310.00 | 110.00 | 34,650.00 | | 0094 | TS-742-60027 | Sewer Force Main (8") (HDPE PIPE) (DR 17) | 443 | LNFT | 95.00 | 42,085.00 | 125.00 | 55,375.00 | 89.00 | 39,427.00 | 140.00 | 62,020.00 | | 0095 | TS-822-09178 | Underground Marker Tape Tape | 758 | LNFT | 1.00 | 758.00 | 4.00 | 3,032.00 | 1.00 | 758.00 | 0.50 | 379.00 | | 0096 | TS-741-10028 | New 12" Valve | 2 | EACH | 8,200.00 | 16,400.00 | 5,000.00 | 10,000.00 | 5,980.00 | 11,960.00 | 4,440.00 | 8,880.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,191,956.30 | | 3,328,323.47 | | 3,394,564.18 | | 3,405,487.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Command Construction Industries LLC | - 6 - LA Contracting Enterprise, L.L.C. | - 7 - Hard Rock Construction LLC | - 8 - Buck Town Contractors & Co. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.55 | LUMP | 50,000.00 | 50,000.00 | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | 54,000.00 | 54,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 50,000.00 | 50,000.00 | 40,000.00 | 40,000.00 | 26,000.00 | 26,000.00 | 32,000.00 | 32,000.00 | | 0003 | 202-02-00010 | Removal of Utility Manholes | 1 | EACH | 500.00 | 500.00 | 17,000.00 | 17,000.00 | 765.00 | 765.00 | 900.00 | 900.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 1,564.9 | SQYD | 15.00 | 23,473.50 | 25.00 | 39,122.50 | 42.00 | 65,725.80 | 25.00 | 39,122.50 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,086 | SQYD | 15.00 | 16,290.00 | 25.00 | 27,150.00 | 25.00 | 27,150.00 | 13.00 | 14,118.00 | | 0006 | 202-02-06140 | Removal of Curbs (Concrete) | 354.2 | LNFT | 5.00 | 1,771.00 | 20.00 | 7,084.00 | 14.00 | 4,958.80 | 9.00 | 3,187.80 | | 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,657 | SQYD | 15.00 | 24,855.00 | 24.00 | 39,768.00 | 21.00 | 34,797.00 | 16.00 | 26,512.00 | | 0008 | 202-02-38240 | Removal of Signs and Supports | 12 | EACH | 25.00 | 300.00 | 18.00 | 216.00 | 29.00 | 348.00 | 100.00 | 1,200.00 | | 0009 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 5,000.00 | 5,000.00 | 7,300.00 | 7,300.00 | 7,900.00 | 7,900.00 | 5,800.00 | 5,800.00 | | 0010 | 203-01-00100 | General Excavation | 5,056 | CUYD | 25.00 | 126,400.00 | 20.00 | 101,120.00 | 30.00 | 151,680.00 | 25.00 | 126,400.00 | | 0011 | 203-03-00100 | Embankment | 5,499 | CUYD | 25.00 | 137,475.00 | 56.00 | 307,944.00 | 30.00 | 164,970.00 | 68.00 | 373,932.00 | | 0012 | 203-04-00200 | Nonplastic Embankment (Sand) | 2,630 | CUYD | 40.00 | 105,200.00 | 44.00 | 115,720.00 | 65.00 | 170,950.00 | 38.00 | 99,940.00 | | 0013 | 203-08-00100 | Geotextile Fabric | 6,178 | SQYD | 2.00 | 12,356.00 | 6.25 | 38,612.50 | 1.50 | 9,267.00 | 2.00 | 12,356.00 | | 0014 | 204-02-00100 | Temporary Hay Bales | 24 | EACH | 25.00 | 600.00 | 28.00 | 672.00 | 26.00 | 624.00 | 30.00 | 720.00 | | 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 18 | EACH | 250.00 | 4,500.00 | 179.00 | 3,222.00 | 168.00 | 3,024.00 | 100.00 | 1,800.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 2,946 | LNFT | 5.00 | 14,730.00 | 3.00 | 8,838.00 | 3.00 | 8,838.00 | 1.00 | 2,946.00 | | 0017 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 5,258.4 | SQYD | 30.00 | 157,752.00 | 41.00 | 215,594.40 | 52.00 | 273,436.80 | 35.00 | 184,044.00 | | 0018 | 401-01-00100 | Aggregate Surface Course (Net Section) | 24.5 | CUYD | 200.00 | 4,900.00 | 198.00 | 4,851.00 | 225.00 | 5,512.50 | 65.00 | 1,592.50 | | 0019 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 128.6 | CUYD | 25.00 | 3,215.00 | 191.00 | 24,562.60 | 154.00 | 19,804.40 | 78.00 | 10,030.80 | | 0020 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 613 | SQYD | 1.00 | 613.00 | 83.00 | 50,879.00 | 82.00 | 50,266.00 | 110.00 | 67,430.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 3,674.1 | TON | 200.00 | 734,820.00 | 169.00 | 620,922.90 | 145.00 | 532,744.50 | 161.00 | 591,530.10 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 40 | TON | 200.00 | 8,000.00 | 635.00 | 25,400.00 | 600.00 | 24,000.00 | 620.00 | 24,800.00 | | 0023 | 509-01-00100 | Milling Asphalt Pavement | 3,338 | SQYD | 10.00 | 33,380.00 | 10.00 | 33,380.00 | 9.00 | 30,042.00 | 9.00 | 30,042.00 | | 0024 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -185 | CUYD | 0.01 | -1.85 | 0.01 | -1.85 | 0.01 | -1.85 | 0.01 | -1.85 | | 0025 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 170 | SQYD | 175.00 | 29,750.00 | 193.00 | 32,810.00 | 248.00 | 42,160.00 | 175.00 | 29,750.00 | | 0026 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) 11" | 561.3 | SQYD | 175.00 | 98,227.50 | 180.00 | 101,034.00 | 161.00 | 90,369.30 | 170.00 | 95,421.00 | | 0027 | 701-02-01100 | Cross Drain Pipe Arch (54" Equiv. RCPA) | 378 | LNFT | 450.00 | 170,100.00 | 437.00 | 165,186.00 | 517.00 | 195,426.00 | 490.00 | 185,220.00 | | 0028 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 208 | LNFT | 600.00 | 124,800.00 | 500.00 | 104,000.00 | 735.00 | 152,880.00 | 555.00 | 115,440.00 | | 0029 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 364 | LNFT | 150.00 | 54,600.00 | 76.00 | 27,664.00 | 180.00 | 65,520.00 | 150.00 | 54,600.00 | | 0030 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 272 | LNFT | 200.00 | 54,400.00 | 140.00 | 38,080.00 | 250.00 | 68,000.00 | 162.00 | 44,064.00 | | 0031 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 450 | LNFT | 250.00 | 112,500.00 | 192.00 | 86,400.00 | 347.00 | 156,150.00 | 280.00 | 126,000.00 | | 0032 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 | 2,900.00 | 2,900.00 | 1,500.00 | 1,500.00 | | 0033 | 701-16-01060 | Plastic Pipe (Extension) (24" RPVCP) | 5 | LNFT | 250.00 | 1,250.00 | 275.00 | 1,375.00 | 450.00 | 2,250.00 | 165.00 | 825.00 | | 0034 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 1,672 | LNFT | 1.00 | 1,672.00 | 16.00 | 26,752.00 | 10.00 | 16,720.00 | 9.00 | 15,048.00 | | 0035 | 702-03-00100 | Catch Basins (CB-01) | 12 | EACH | 7,500.00 | 90,000.00 | 5,600.00 | 67,200.00 | 6,000.00 | 72,000.00 | 4,900.00 | 58,800.00 | | 0036 | 702-03-00500 | Catch Basins (CB-06) | 11 | EACH | 10,000.00 | 110,000.00 | 6,750.00 | 74,250.00 | 8,200.00 | 90,200.00 | 13,600.00 | 149,600.00 | | 0037 | 706-02-00200 | Concrete Drive (6" Thick) | 974.6 | SQYD | 70.00 | 68,222.00 | 87.00 | 84,790.20 | 98.00 | 95,510.80 | 130.00 | 126,698.00 | | 0038 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) 5" | 740.1 | SQYD | 70.00 | 51,807.00 | 106.00 | 78,450.60 | 122.00 | 90,292.20 | 105.00 | 77,710.50 | | 0039 | 707-01-00100 | Concrete Curb | 1,825.2 | LNFT | 20.00 | 36,504.00 | 22.00 | 40,154.40 | 29.00 | 52,930.80 | 35.00 | 63,882.00 | | 0040 | 707-03-00100 | Combination Concrete Curb and Gutter | 2,820 | LNFT | 25.00 | 70,500.00 | 45.00 | 126,900.00 | 58.00 | 163,560.00 | 52.00 | 146,640.00 | | 0041 | 708-01-00100 | Right-of-Way Monument | 16 | EACH | 750.00 | 12,000.00 | 800.00 | 12,800.00 | 734.00 | 11,744.00 | 500.00 | 8,000.00 | | 0042 | 710-01-00100 | Flowable Fill | 8 | CUYD | 1,000.00 | 8,000.00 | 1,700.00 | 13,600.00 | 523.00 | 4,184.00 | 100.00 | 800.00 | | 0043 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 111,000.00 | 111,000.00 | 183,000.00 | 183,000.00 | 280,000.00 | 280,000.00 | | 0044 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 298 | LNFT | 0.30 | 89.40 | 0.40 | 119.20 | 0.30 | 89.40 | 0.40 | 119.20 | | 0045 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 430 | LNFT | 1.00 | 430.00 | 1.20 | 516.00 | 1.25 | 537.50 | 1.00 | 430.00 | | 0046 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.056 | MILE | 400.00 | 22.40 | 480.00 | 26.88 | 1,200.00 | 67.20 | 700.00 | 39.20 | | 0047 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.197 | MILE | 1,000.00 | 8,197.00 | 1,335.00 | 10,943.00 | 1,200.00 | 9,836.40 | 1,200.00 | 9,836.40 | | 0048 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 18 | EACH | 7.00 | 126.00 | 8.50 | 153.00 | 8.00 | 144.00 | 8.00 | 144.00 | | 0049 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 993 | SQYD | 2.00 | 1,986.00 | 1.80 | 1,787.40 | 2.00 | 1,986.00 | 2.00 | 1,986.00 | | 0050 | 724-01-00100 | Rumble Strips (Centerline) | 0.018 | MILE | 650.00 | 11.70 | 600.00 | 10.80 | 15,000.00 | 270.00 | 15,800.00 | 284.40 | | 0051 | 725-01-00100 | Temporary Detour Roads | 338 | SQYD | 150.00 | 50,700.00 | 220.00 | 74,360.00 | 170.00 | 57,460.00 | 220.00 | 74,360.00 | | 0052 | 726-01-00100 | Bedding Material | 196.2 | CUYD | 125.00 | 24,525.00 | 155.00 | 30,411.00 | 113.00 | 22,170.60 | 160.00 | 31,392.00 | | 0053 | 727-01-00100 | Mobilization | 1 | LUMP | 350,000.00 | 350,000.00 | 256,000.00 | 256,000.00 | 400,000.00 | 400,000.00 | 430,000.00 | 430,000.00 | | 0054 | 729-01-00100 | Sign (Type A) | 320 | SQFT | 20.00 | 6,400.00 | 18.00 | 5,760.00 | 34.00 | 10,880.00 | 17.50 | 5,600.00 | | 0055 | 729-02-00100 | Sign (Type B) | 41.3 | SQFT | 20.00 | 826.00 | 18.00 | 743.40 | 51.00 | 2,106.30 | 17.50 | 722.75 | | 0056 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 4 | EACH | 300.00 | 1,200.00 | 300.00 | 1,200.00 | 169.00 | 676.00 | 300.00 | 1,200.00 | | 0057 | 731-02-00100 | Reflectorized Raised Pavement Markers | 114 | EACH | 10.00 | 1,140.00 | 8.50 | 969.00 | 8.00 | 912.00 | 8.00 | 912.00 | | 0058 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 439 | LNFT | 4.00 | 1,756.00 | 4.20 | 1,843.80 | 4.00 | 1,756.00 | 4.00 | 1,756.00 | | 0059 | 732-01-05400 | Plastic Pavement Striping (Dotted Line)(24" W)(2' L)(Thermo 125 mil) | 191 | LNFT | 12.00 | 2,292.00 | 14.50 | 2,769.50 | 14.00 | 2,674.00 | 14.00 | 2,674.00 | | 0060 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.294 | MILE | 5,000.00 | 6,470.00 | 6,300.00 | 8,152.20 | 5,100.00 | 6,599.40 | 5,200.00 | 6,728.80 | | 0061 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 500.00 | 1,000.00 | 360.00 | 720.00 | 340.00 | 680.00 | 350.00 | 700.00 | | 0062 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 2 | EACH | 500.00 | 1,000.00 | 600.00 | 1,200.00 | 565.00 | 1,130.00 | 580.00 | 1,160.00 | | 0063 | 739-01-00100 | Hydro-Seeding | 3.77 | ACRE | 3,250.00 | 12,252.50 | 3,300.00 | 12,441.00 | 3,100.00 | 11,687.00 | 3,800.00 | 14,326.00 | | 0064 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 78,000.00 | 78,000.00 | 55,000.00 | 55,000.00 | 60,000.00 | 60,000.00 | | 0065 | NS-300-00060 | Geogrid | 5,258 | SQYD | 2.00 | 10,516.00 | 1.60 | 8,412.80 | 1.15 | 6,046.70 | 2.00 | 10,516.00 | | 0066 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 143 | LNFT | 6.00 | 858.00 | 11.00 | 1,573.00 | 20.00 | 2,860.00 | 25.00 | 3,575.00 | | 0067 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 444 | LNFT | 6.00 | 2,664.00 | 9.00 | 3,996.00 | 20.00 | 8,880.00 | 26.00 | 11,544.00 | | 0068 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 22,880 | INLF | 1.00 | 22,880.00 | 0.80 | 18,304.00 | 0.75 | 17,160.00 | 1.00 | 22,880.00 | | 0069 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 7,587 | INLF | 1.00 | 7,587.00 | 1.25 | 9,483.75 | 1.25 | 9,483.75 | 1.10 | 8,345.70 | | 0070 | NS-602-00001 | Milling Concrete Pavement | 528.6 | SQYD | 25.00 | 13,215.00 | 38.00 | 20,086.80 | 34.00 | 17,972.40 | 35.00 | 18,501.00 | | 0071 | NS-702-00101 | Paved Gutter Drain (Single) | 10 | EACH | 4,500.00 | 45,000.00 | 4,800.00 | 48,000.00 | 4,200.00 | 42,000.00 | 6,200.00 | 62,000.00 | | 0072 | NS-702-00102 | Paved Gutter Drain (Double) | 1 | EACH | 6,500.00 | 6,500.00 | 9,000.00 | 9,000.00 | 9,800.00 | 9,800.00 | 8,700.00 | 8,700.00 | | 0073 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad | 31 | EACH | 1,200.00 | 37,200.00 | 1,200.00 | 37,200.00 | 1,300.00 | 40,300.00 | 1,170.00 | 36,270.00 | | 0074 | NS-729-00030 | Breakaway Square Tubing Sign Support (Wet Concrete) | 10 | EACH | 300.00 | 3,000.00 | 300.00 | 3,000.00 | 905.00 | 9,050.00 | 300.00 | 3,000.00 | | 0075 | TS-741-01100 | Water Main (8" PVC) (PVC/C-900 Pipe) | 20 | LNFT | 110.00 | 2,200.00 | 298.00 | 5,960.00 | 225.00 | 4,500.00 | 230.00 | 4,600.00 | | 0076 | TS-741-01110 | Water Main (12" PVC) (PVC/C-900 Pipe) | 75 | LNFT | 190.00 | 14,250.00 | 311.00 | 23,325.00 | 168.00 | 12,600.00 | 175.00 | 13,125.00 | | 0077 | TS-741-02092 | Water Main (8") (HDPE Pipe) (DR 17) | 187 | LNFT | 110.00 | 20,570.00 | 112.00 | 20,944.00 | 100.00 | 18,700.00 | 104.00 | 19,448.00 | | 0078 | TS-741-02093 | Water Main (12") (HDPE Pipe) (DR 17) | 286 | LNFT | 190.00 | 54,340.00 | 141.00 | 40,326.00 | 140.00 | 40,040.00 | 145.00 | 41,470.00 | | 0079 | TS-741-10004 | New 6" Valve | 2 | EACH | 1,000.00 | 2,000.00 | 2,600.00 | 5,200.00 | 3,000.00 | 6,000.00 | 2,850.00 | 5,700.00 | | 0080 | TS-741-10005 | New 8" Valve | 2 | EACH | 4,500.00 | 9,000.00 | 3,300.00 | 6,600.00 | 3,700.00 | 7,400.00 | 3,800.00 | 7,600.00 | | 0081 | TS-741-37056 | Check Valve | 1 | EACH | 8,500.00 | 8,500.00 | 10,000.00 | 10,000.00 | 7,500.00 | 7,500.00 | 8,000.00 | 8,000.00 | | 0082 | TS-741-60014 | Field Hydrostatic and Leakage Test of Water Mains | 1 | LUMP | 1,000.00 | 1,000.00 | 2,750.00 | 2,750.00 | 2,100.00 | 2,100.00 | 2,100.00 | 2,100.00 | | 0083 | TS-741-60040 | Connect Water Main to Existing Water Main | 3 | EACH | 1,000.00 | 3,000.00 | 22,700.00 | 68,100.00 | 6,300.00 | 18,900.00 | 6,400.00 | 19,200.00 | | 0084 | TS-741-60044 | Testing and Disinfection of Water Mains | 568 | LNFT | 1.00 | 568.00 | 8.00 | 4,544.00 | 4.50 | 2,556.00 | 5.00 | 2,840.00 | | 0085 | TS-741-70110 | Pipe Restraints (6") | 4 | EACH | 250.00 | 1,000.00 | 656.00 | 2,624.00 | 373.00 | 1,492.00 | 385.00 | 1,540.00 | | 0086 | TS-741-70112 | Pipe Restraints (8") | 4 | EACH | 300.00 | 1,200.00 | 674.00 | 2,696.00 | 452.00 | 1,808.00 | 465.00 | 1,860.00 | | 0087 | TS-741-70114 | Pipe Restraints (12") | 8 | EACH | 350.00 | 2,800.00 | 890.00 | 7,120.00 | 870.00 | 6,960.00 | 900.00 | 7,200.00 | | 0088 | TS-742-01042 | Testing of Force Mains | 1 | LUMP | 1.00 | 1.00 | 2,400.00 | 2,400.00 | 2,700.00 | 2,700.00 | 2,700.00 | 2,700.00 | | 0089 | TS-742-10002 | Install Sewer Manhole | 1 | EACH | 10,000.00 | 10,000.00 | 36,000.00 | 36,000.00 | 14,000.00 | 14,000.00 | 14,000.00 | 14,000.00 | | 0090 | TS-742-60005 | Connect Sewer Force Main to Existing Sewer Force Main | 4 | EACH | 1,000.00 | 4,000.00 | 4,400.00 | 17,600.00 | 5,000.00 | 20,000.00 | 5,200.00 | 20,800.00 | | 0091 | TS-742-60007 | Field Hydrostatic and Leakage Test of Sewer Force Mains | 1 | LUMP | 1,000.00 | 1,000.00 | 2,400.00 | 2,400.00 | 1,800.00 | 1,800.00 | 1,900.00 | 1,900.00 | | 0092 | TS-742-60011 | Air Release/Vacuum Valve (2") | 2 | EACH | 6,000.00 | 12,000.00 | 11,000.00 | 22,000.00 | 6,800.00 | 13,600.00 | 6,800.00 | 13,600.00 | | 0093 | TS-742-60026 | Sewer Force Main (6") (HDPE PIPE) (DR 17) | 315 | LNFT | 90.00 | 28,350.00 | 70.00 | 22,050.00 | 84.00 | 26,460.00 | 86.00 | 27,090.00 | | 0094 | TS-742-60027 | Sewer Force Main (8") (HDPE PIPE) (DR 17) | 443 | LNFT | 110.00 | 48,730.00 | 118.00 | 52,274.00 | 100.00 | 44,300.00 | 104.00 | 46,072.00 | | 0095 | TS-822-09178 | Underground Marker Tape Tape | 758 | LNFT | 3.00 | 2,274.00 | 0.30 | 227.40 | 1.25 | 947.50 | 1.00 | 758.00 | | 0096 | TS-741-10028 | New 12" Valve | 2 | EACH | 6,500.00 | 13,000.00 | 4,500.00 | 9,000.00 | 6,800.00 | 13,600.00 | 7,000.00 | 14,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,571,588.15 | | 3,947,126.18 | | 4,201,777.20 | | 4,389,705.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Boh Bros. Construction Co., LLC. | - 10 - Cycle Construction Co. L.L.C. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 4.55 | LUMP | 15,000.00 | 15,000.00 | 24,300.00 | 24,300.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 68,000.00 | 68,000.00 | 97,900.00 | 97,900.00 | | 0003 | 202-02-00010 | Removal of Utility Manholes | 1 | EACH | 1,400.00 | 1,400.00 | 1,543.00 | 1,543.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 1,564.9 | SQYD | 10.00 | 15,649.00 | 25.00 | 39,122.50 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,086 | SQYD | 10.50 | 11,403.00 | 29.00 | 31,494.00 | | 0006 | 202-02-06140 | Removal of Curbs (Concrete) | 354.2 | LNFT | 12.00 | 4,250.40 | 10.00 | 3,542.00 | | 0007 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,657 | SQYD | 10.00 | 16,570.00 | 24.00 | 39,768.00 | | 0008 | 202-02-38240 | Removal of Signs and Supports | 12 | EACH | 17.00 | 204.00 | 17.00 | 204.00 | | 0009 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 5,200.00 | 5,200.00 | 7,200.00 | 7,200.00 | | 0010 | 203-01-00100 | General Excavation | 5,056 | CUYD | 25.00 | 126,400.00 | 22.00 | 111,232.00 | | 0011 | 203-03-00100 | Embankment | 5,499 | CUYD | 60.00 | 329,940.00 | 72.00 | 395,928.00 | | 0012 | 203-04-00200 | Nonplastic Embankment (Sand) | 2,630 | CUYD | 122.00 | 320,860.00 | 30.00 | 78,900.00 | | 0013 | 203-08-00100 | Geotextile Fabric | 6,178 | SQYD | 1.50 | 9,267.00 | 3.00 | 18,534.00 | | 0014 | 204-02-00100 | Temporary Hay Bales | 24 | EACH | 27.00 | 648.00 | 27.00 | 648.00 | | 0015 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 18 | EACH | 165.00 | 2,970.00 | 173.00 | 3,114.00 | | 0016 | 204-06-00100 | Temporary Silt Fencing | 2,946 | LNFT | 3.00 | 8,838.00 | 4.00 | 11,784.00 | | 0017 | 302-02-08070 | Class II Base Course (8" Thick) (Crushed Stone or Recycled Portland Cement Concrete) | 5,258.4 | SQYD | 36.00 | 189,302.40 | 24.00 | 126,201.60 | | 0018 | 401-01-00100 | Aggregate Surface Course (Net Section) | 24.5 | CUYD | 160.00 | 3,920.00 | 154.00 | 3,773.00 | | 0019 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 128.6 | CUYD | 155.00 | 19,933.00 | 138.00 | 17,746.80 | | 0020 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 613 | SQYD | 155.00 | 95,015.00 | 73.00 | 44,749.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 3,674.1 | TON | 235.00 | 863,413.50 | 160.00 | 587,856.00 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 40 | TON | 600.00 | 24,000.00 | 614.00 | 24,560.00 | | 0023 | 509-01-00100 | Milling Asphalt Pavement | 3,338 | SQYD | 11.00 | 36,718.00 | 10.00 | 33,380.00 | | 0024 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -185 | CUYD | 0.01 | -1.85 | 0.01 | -1.85 | | 0025 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 170 | SQYD | 280.00 | 47,600.00 | 213.00 | 36,210.00 | | 0026 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) 11" | 561.3 | SQYD | 167.00 | 93,737.10 | 215.00 | 120,679.50 | | 0027 | 701-02-01100 | Cross Drain Pipe Arch (54" Equiv. RCPA) | 378 | LNFT | 675.00 | 255,150.00 | 673.00 | 254,394.00 | | 0028 | 701-02-01120 | Cross Drain Pipe Arch (60" Equiv. RCPA) | 208 | LNFT | 1,055.00 | 219,440.00 | 992.00 | 206,336.00 | | 0029 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 364 | LNFT | 150.00 | 54,600.00 | 216.00 | 78,624.00 | | 0030 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 272 | LNFT | 175.00 | 47,600.00 | 283.00 | 76,976.00 | | 0031 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 450 | LNFT | 265.00 | 119,250.00 | 386.00 | 173,700.00 | | 0032 | 701-15-00100 | Concrete Collar | 1 | EACH | 4,800.00 | 4,800.00 | 5,275.00 | 5,275.00 | | 0033 | 701-16-01060 | Plastic Pipe (Extension) (24" RPVCP) | 5 | LNFT | 410.00 | 2,050.00 | 918.00 | 4,590.00 | | 0034 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 1,672 | LNFT | 35.00 | 58,520.00 | 1.00 | 1,672.00 | | 0035 | 702-03-00100 | Catch Basins (CB-01) | 12 | EACH | 7,600.00 | 91,200.00 | 7,665.00 | 91,980.00 | | 0036 | 702-03-00500 | Catch Basins (CB-06) | 11 | EACH | 11,555.00 | 127,105.00 | 9,840.00 | 108,240.00 | | 0037 | 706-02-00200 | Concrete Drive (6" Thick) | 974.6 | SQYD | 125.00 | 121,825.00 | 110.00 | 107,206.00 | | 0038 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) 5" | 740.1 | SQYD | 110.00 | 81,411.00 | 133.00 | 98,433.30 | | 0039 | 707-01-00100 | Concrete Curb | 1,825.2 | LNFT | 45.00 | 82,134.00 | 23.00 | 41,979.60 | | 0040 | 707-03-00100 | Combination Concrete Curb and Gutter | 2,820 | LNFT | 60.00 | 169,200.00 | 46.00 | 129,720.00 | | 0041 | 708-01-00100 | Right-of-Way Monument | 16 | EACH | 155.00 | 2,480.00 | 500.00 | 8,000.00 | | 0042 | 710-01-00100 | Flowable Fill | 8 | CUYD | 735.00 | 5,880.00 | 590.00 | 4,720.00 | | 0043 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 62,600.00 | 62,600.00 | 157,000.00 | 157,000.00 | | 0044 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 298 | LNFT | 0.25 | 74.50 | 1.00 | 298.00 | | 0045 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 430 | LNFT | 1.25 | 537.50 | 1.00 | 430.00 | | 0046 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.056 | MILE | 400.00 | 22.40 | 500.00 | 28.00 | | 0047 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.197 | MILE | 1,125.00 | 9,221.63 | 870.00 | 7,131.39 | | 0048 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 18 | EACH | 8.00 | 144.00 | 5.00 | 90.00 | | 0049 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 993 | SQYD | 1.50 | 1,489.50 | 2.00 | 1,986.00 | | 0050 | 724-01-00100 | Rumble Strips (Centerline) | 0.018 | MILE | 625.00 | 11.25 | 64,400.00 | 1,159.20 | | 0051 | 725-01-00100 | Temporary Detour Roads | 338 | SQYD | 180.00 | 60,840.00 | 182.00 | 61,516.00 | | 0052 | 726-01-00100 | Bedding Material | 196.2 | CUYD | 125.00 | 24,525.00 | 130.00 | 25,506.00 | | 0053 | 727-01-00100 | Mobilization | 1 | LUMP | 138,800.00 | 138,800.00 | 470,650.00 | 470,650.00 | | 0054 | 729-01-00100 | Sign (Type A) | 320 | SQFT | 16.00 | 5,120.00 | 18.00 | 5,760.00 | | 0055 | 729-02-00100 | Sign (Type B) | 41.3 | SQFT | 16.00 | 660.80 | 17.00 | 702.10 | | 0056 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 4 | EACH | 280.00 | 1,120.00 | 290.00 | 1,160.00 | | 0057 | 731-02-00100 | Reflectorized Raised Pavement Markers | 114 | EACH | 8.00 | 912.00 | 5.00 | 570.00 | | 0058 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 439 | LNFT | 4.00 | 1,756.00 | 5.00 | 2,195.00 | | 0059 | 732-01-05400 | Plastic Pavement Striping (Dotted Line)(24" W)(2' L)(Thermo 125 mil) | 191 | LNFT | 13.50 | 2,578.50 | 26.00 | 4,966.00 | | 0060 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.294 | MILE | 5,000.00 | 6,470.00 | 6,400.00 | 8,281.60 | | 0061 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 335.00 | 670.00 | 350.00 | 700.00 | | 0062 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 2 | EACH | 560.00 | 1,120.00 | 400.00 | 800.00 | | 0063 | 739-01-00100 | Hydro-Seeding | 3.77 | ACRE | 3,100.00 | 11,687.00 | 3,200.00 | 12,064.00 | | 0064 | 740-01-00100 | Construction Layout | 1 | LUMP | 95,000.00 | 95,000.00 | 83,300.00 | 83,300.00 | | 0065 | NS-300-00060 | Geogrid | 5,258 | SQYD | 1.50 | 7,887.00 | 3.00 | 15,774.00 | | 0066 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 143 | LNFT | 5.60 | 800.80 | 6.00 | 858.00 | | 0067 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 444 | LNFT | 5.60 | 2,486.40 | 6.00 | 2,664.00 | | 0068 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 22,880 | INLF | 1.00 | 22,880.00 | 1.00 | 22,880.00 | | 0069 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 7,587 | INLF | 1.00 | 7,587.00 | 1.00 | 7,587.00 | | 0070 | NS-602-00001 | Milling Concrete Pavement | 528.6 | SQYD | 45.00 | 23,787.00 | 35.00 | 18,501.00 | | 0071 | NS-702-00101 | Paved Gutter Drain (Single) | 10 | EACH | 6,000.00 | 60,000.00 | 6,375.00 | 63,750.00 | | 0072 | NS-702-00102 | Paved Gutter Drain (Double) | 1 | EACH | 12,000.00 | 12,000.00 | 11,000.00 | 11,000.00 | | 0073 | NS-729-00029 | Breakaway Square Tubing Sign Support w/ Mowing Pad | 31 | EACH | 1,125.00 | 34,875.00 | 1,160.00 | 35,960.00 | | 0074 | NS-729-00030 | Breakaway Square Tubing Sign Support (Wet Concrete) | 10 | EACH | 285.00 | 2,850.00 | 290.00 | 2,900.00 | | 0075 | TS-741-01100 | Water Main (8" PVC) (PVC/C-900 Pipe) | 20 | LNFT | 225.00 | 4,500.00 | 313.00 | 6,260.00 | | 0076 | TS-741-01110 | Water Main (12" PVC) (PVC/C-900 Pipe) | 75 | LNFT | 277.00 | 20,775.00 | 200.00 | 15,000.00 | | 0077 | TS-741-02092 | Water Main (8") (HDPE Pipe) (DR 17) | 187 | LNFT | 180.00 | 33,660.00 | 340.00 | 63,580.00 | | 0078 | TS-741-02093 | Water Main (12") (HDPE Pipe) (DR 17) | 286 | LNFT | 350.00 | 100,100.00 | 345.00 | 98,670.00 | | 0079 | TS-741-10004 | New 6" Valve | 2 | EACH | 2,250.00 | 4,500.00 | 3,000.00 | 6,000.00 | | 0080 | TS-741-10005 | New 8" Valve | 2 | EACH | 4,000.00 | 8,000.00 | 3,700.00 | 7,400.00 | | 0081 | TS-741-37056 | Check Valve | 1 | EACH | 4,350.00 | 4,350.00 | 5,000.00 | 5,000.00 | | 0082 | TS-741-60014 | Field Hydrostatic and Leakage Test of Water Mains | 1 | LUMP | 4,000.00 | 4,000.00 | 33,570.00 | 33,570.00 | | 0083 | TS-741-60040 | Connect Water Main to Existing Water Main | 3 | EACH | 7,250.00 | 21,750.00 | 5,430.00 | 16,290.00 | | 0084 | TS-741-60044 | Testing and Disinfection of Water Mains | 568 | LNFT | 7.00 | 3,976.00 | 1.00 | 568.00 | | 0085 | TS-741-70110 | Pipe Restraints (6") | 4 | EACH | 430.00 | 1,720.00 | 477.00 | 1,908.00 | | 0086 | TS-741-70112 | Pipe Restraints (8") | 4 | EACH | 500.00 | 2,000.00 | 583.00 | 2,332.00 | | 0087 | TS-741-70114 | Pipe Restraints (12") | 8 | EACH | 550.00 | 4,400.00 | 895.00 | 7,160.00 | | 0088 | TS-742-01042 | Testing of Force Mains | 1 | LUMP | 4,000.00 | 4,000.00 | 580.00 | 580.00 | | 0089 | TS-742-10002 | Install Sewer Manhole | 1 | EACH | 18,000.00 | 18,000.00 | 16,000.00 | 16,000.00 | | 0090 | TS-742-60005 | Connect Sewer Force Main to Existing Sewer Force Main | 4 | EACH | 5,100.00 | 20,400.00 | 6,365.00 | 25,460.00 | | 0091 | TS-742-60007 | Field Hydrostatic and Leakage Test of Sewer Force Mains | 1 | LUMP | 4,000.00 | 4,000.00 | 33,000.00 | 33,000.00 | | 0092 | TS-742-60011 | Air Release/Vacuum Valve (2") | 2 | EACH | 15,000.00 | 30,000.00 | 14,600.00 | 29,200.00 | | 0093 | TS-742-60026 | Sewer Force Main (6") (HDPE PIPE) (DR 17) | 315 | LNFT | 175.00 | 55,125.00 | 267.00 | 84,105.00 | | 0094 | TS-742-60027 | Sewer Force Main (8") (HDPE PIPE) (DR 17) | 443 | LNFT | 200.00 | 88,600.00 | 348.00 | 154,164.00 | | 0095 | TS-822-09178 | Underground Marker Tape Tape | 758 | LNFT | 0.07 | 53.06 | 0.50 | 379.00 | | 0096 | TS-741-10028 | New 12" Valve | 2 | EACH | 5,000.00 | 10,000.00 | 4,800.00 | 9,600.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 4,797,303.89 | | 4,896,606.74 |
|