Proposal:H.015956.6
Parish:East Baton Rouge
Routes:LA 19
Description:LA 19: TURN LANES @ NEW RAFE MAYER RD
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, LIME TREATMENT, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$2,620,105.54
| Rank | License | Bidder | Construction Bid |
| 1 | 12031 | R.J. Daigle & Sons Contractors, Inc | $1,891,629.95 |
| 2 | 06276 | Barriere Construction Co., LLC | $2,141,396.83 |
| 3 | 00046 | Barber Bros. Contracting Co., L.L.C | $2,289,049.11 |
| 4 | 52306 | SIEMA CONSTRUCTION, LLC | $2,407,079.98 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - R.J. Daigle & Sons Contractors, Inc | - 2 - Barriere Construction Co., LLC | - 3 - Barber Bros. Contracting Co., L.L.C | - 4 - SIEMA CONSTRUCTION, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-03030 | Removal of Pavement Structure | 3,191 | SQYD | 19.00 | 60,629.00 | 17.00 | 54,247.00 | 20.00 | 63,820.00 | 8.00 | 25,528.00 | | 0002 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP | 96 | LNFT | 60.00 | 5,760.00 | 50.00 | 4,800.00 | 40.00 | 3,840.00 | 40.00 | 3,840.00 | | 0003 | 202-02-32180 | Removal of Pipe Headwalls | 1 | EACH | 1,000.00 | 1,000.00 | 3,375.00 | 3,375.00 | 3,500.00 | 3,500.00 | 4,500.00 | 4,500.00 | | 0004 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 3,000.00 | 3,000.00 | 4,000.00 | 4,000.00 | 3,000.00 | 3,000.00 | 3,500.00 | 3,500.00 | | 0005 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 1,350.00 | 1,350.00 | 1,319.00 | 1,319.00 | 1,400.00 | 1,400.00 | 1,650.00 | 1,650.00 | | 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 78,000.00 | 78,000.00 | 88,000.00 | 88,000.00 | 80,000.00 | 80,000.00 | 200,000.00 | 200,000.00 | | 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 170.00 | 1,360.00 | 150.00 | 1,200.00 | 175.00 | 1,400.00 | 122.00 | 976.00 | | 0008 | 204-06-00100 | Temporary Silt Fencing | 3,188 | LNFT | 2.25 | 7,173.00 | 2.00 | 6,376.00 | 2.00 | 6,376.00 | 3.00 | 9,564.00 | | 0009 | 302-02-08080 | Class II Base Course (8" Thick) (Asphalt Concrete Base) | 4,563.9 | SQYD | 48.00 | 219,067.20 | 63.00 | 287,525.70 | 58.00 | 264,706.20 | 68.00 | 310,345.20 | | 0010 | 304-01-00100 | Lime | 32.35 | TON | 300.00 | 9,705.00 | 281.00 | 9,090.35 | 325.00 | 10,513.75 | 340.00 | 10,999.00 | | 0011 | 304-05-00100 | Lime Treatment (Type E) | 2,282 | SQYD | 7.25 | 16,544.50 | 8.75 | 19,967.50 | 12.00 | 27,384.00 | 9.00 | 20,538.00 | | 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 1.00 | 100.00 | 1.00 | 100.00 | 75.00 | 7,500.00 | 150.00 | 15,000.00 | | 0013 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 150 | SQYD | 1.00 | 150.00 | 1.00 | 150.00 | 75.00 | 11,250.00 | 60.00 | 9,000.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 2,364.6 | TON | 137.00 | 323,950.20 | 141.00 | 333,408.60 | 150.00 | 354,690.00 | 200.00 | 472,920.00 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 52.3 | TON | 250.00 | 13,075.00 | 425.00 | 22,227.50 | 280.00 | 14,644.00 | 650.00 | 33,995.00 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 8,977 | SQYD | 4.25 | 38,152.25 | 3.25 | 29,175.25 | 4.00 | 35,908.00 | 9.00 | 80,793.00 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -499 | CUYD | 0.01 | -4.99 | 0.01 | -4.99 | 0.00 | 0.00 | 14.00 | -6,986.00 | | 0018 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 49 | SQYD | 204.00 | 9,996.00 | 235.00 | 11,515.00 | 280.00 | 13,720.00 | 200.00 | 9,800.00 | | 0019 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 304 | LNFT | 110.00 | 33,440.00 | 130.00 | 39,520.00 | 255.00 | 77,520.00 | 120.00 | 36,480.00 | | 0020 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 292 | LNFT | 150.00 | 43,800.00 | 153.00 | 44,676.00 | 330.00 | 96,360.00 | 140.00 | 40,880.00 | | 0021 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 698 | LNFT | 180.00 | 125,640.00 | 175.00 | 122,150.00 | 340.00 | 237,320.00 | 160.00 | 111,680.00 | | 0022 | 701-03-02062 | Storm Drain Pipe (Outfall) (30" RPVCP or 36" CMP) 30" RPVCP ONLY | 78 | LNFT | 170.00 | 13,260.00 | 175.00 | 13,650.00 | 350.00 | 27,300.00 | 160.00 | 12,480.00 | | 0023 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 20 | LNFT | 160.00 | 3,200.00 | 250.00 | 5,000.00 | 550.00 | 11,000.00 | 180.00 | 3,600.00 | | 0024 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,400.00 | 1,400.00 | 4,000.00 | 4,000.00 | 3,000.00 | 3,000.00 | 1,500.00 | 1,500.00 | | 0025 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 1,376 | LNFT | 11.00 | 15,136.00 | 1.00 | 1,376.00 | 15.00 | 20,640.00 | 12.00 | 16,512.00 | | 0026 | 702-02-00200 | Manholes (R-CB-11) | 3 | EACH | 5,850.00 | 17,550.00 | 8,500.00 | 25,500.00 | 8,500.00 | 25,500.00 | 7,000.00 | 21,000.00 | | 0027 | 702-03-00100 | Catch Basins (CB-01) | 15 | EACH | 5,200.00 | 78,000.00 | 5,800.00 | 87,000.00 | 6,500.00 | 97,500.00 | 8,000.00 | 120,000.00 | | 0028 | 702-08-00200 | Side Drain Safety End (Type 2) | 1 | EACH | 10,000.00 | 10,000.00 | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 | | 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 80,000.00 | 80,000.00 | 121,000.00 | 121,000.00 | 65,000.00 | 65,000.00 | 75,000.00 | 75,000.00 | | 0030 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 940 | LNFT | 0.35 | 329.00 | 0.30 | 282.00 | 0.35 | 329.00 | 0.35 | 329.00 | | 0031 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,108 | LNFT | 0.90 | 997.20 | 0.80 | 886.40 | 0.80 | 886.40 | 0.65 | 720.20 | | 0032 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.951 | MILE | 450.00 | 427.95 | 1,145.11 | 1,089.00 | 325.00 | 309.08 | 2,000.00 | 1,902.00 | | 0033 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.116 | MILE | 550.00 | 613.80 | 500.00 | 558.00 | 550.00 | 613.80 | 2,100.00 | 2,343.60 | | 0034 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.414 | MILE | 800.00 | 1,931.20 | 600.00 | 1,448.40 | 700.00 | 1,689.80 | 2,100.00 | 5,069.40 | | 0035 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 454 | EACH | 4.70 | 2,133.80 | 4.00 | 1,816.00 | 4.50 | 2,043.00 | 8.00 | 3,632.00 | | 0036 | 713-07-00100 | Temporary Precast Concrete Barrier (Contractor Furnished) | 124 | EACH | 580.00 | 71,920.00 | 1,500.00 | 186,000.00 | 550.00 | 68,200.00 | 650.00 | 80,600.00 | | 0037 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 310 | SQYD | 2.25 | 697.50 | 2.00 | 620.00 | 4.00 | 1,240.00 | 3.00 | 930.00 | | 0038 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 1,000.00 | 1,000.00 | 1.00 | 1.00 | 4,500.00 | 4,500.00 | 22,000.00 | 22,000.00 | | 0039 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.586 | MILE | 575.00 | 336.95 | 13,000.00 | 7,618.00 | 350.00 | 205.10 | 7,000.00 | 4,102.00 | | 0040 | 726-01-00100 | Bedding Material | 143.5 | CUYD | 140.00 | 20,090.00 | 1.00 | 143.50 | 115.00 | 16,502.50 | 155.00 | 22,242.50 | | 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 250,000.00 | 250,000.00 | 187,000.00 | 187,000.00 | 275,000.00 | 275,000.00 | 230,000.00 | 230,000.00 | | 0042 | 729-01-00100 | Sign (Type A) | 22.5 | SQFT | 90.00 | 2,025.00 | 83.00 | 1,867.50 | 65.00 | 1,462.50 | 20.00 | 450.00 | | 0043 | 729-21-00100 | U-Channel Post | 2 | EACH | 115.00 | 230.00 | 200.00 | 400.00 | 220.00 | 440.00 | 131.00 | 262.00 | | 0044 | 731-02-00100 | Reflectorized Raised Pavement Markers | 227 | EACH | 4.50 | 1,021.50 | 4.00 | 908.00 | 4.50 | 1,021.50 | 8.00 | 1,816.00 | | 0045 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 554 | LNFT | 14.00 | 7,756.00 | 12.00 | 6,648.00 | 13.25 | 7,340.50 | 16.00 | 8,864.00 | | 0046 | 732-01-05000 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 125 mil) | 116 | LNFT | 0.50 | 58.00 | 0.50 | 58.00 | 0.55 | 63.80 | 5.25 | 609.00 | | 0047 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.207 | MILE | 5,550.00 | 6,698.85 | 4,800.00 | 5,793.60 | 5,300.00 | 6,397.10 | 9,775.00 | 11,798.43 | | 0048 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.089 | MILE | 17,000.00 | 1,513.00 | 15,000.00 | 1,335.00 | 15,000.00 | 1,335.00 | 21,000.00 | 1,869.00 | | 0049 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.558 | MILE | 1,700.00 | 948.60 | 1,500.00 | 837.00 | 1,635.00 | 912.33 | 2,400.00 | 1,339.20 | | 0050 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.089 | MILE | 4,100.00 | 364.90 | 3,500.00 | 311.50 | 3,500.00 | 311.50 | 11,750.00 | 1,045.75 | | 0051 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 350.00 | 350.00 | 300.00 | 300.00 | 330.00 | 330.00 | 600.00 | 600.00 | | 0052 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 5 | EACH | 320.00 | 1,600.00 | 275.00 | 1,375.00 | 300.00 | 1,500.00 | 525.00 | 2,625.00 | | 0053 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 320.00 | 640.00 | 275.00 | 550.00 | 300.00 | 600.00 | 525.00 | 1,050.00 | | 0054 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 4 | EACH | 350.00 | 1,400.00 | 300.00 | 1,200.00 | 330.00 | 1,320.00 | 600.00 | 2,400.00 | | 0055 | 736-01-00100 | Trenching and Backfilling | 1,150 | LNFT | 7.50 | 8,625.00 | 9.55 | 10,982.50 | 7.50 | 8,625.00 | 9.00 | 10,350.00 | | 0056 | 736-03-00100 | Jacking or Boring | 325 | LNFT | 21.00 | 6,825.00 | 30.25 | 9,831.25 | 20.00 | 6,500.00 | 25.00 | 8,125.00 | | 0057 | 736-04-10350 | Signal Pole (Single Mast Arm, 35ft) | 1 | EACH | 19,500.00 | 19,500.00 | 19,924.00 | 19,924.00 | 19,000.00 | 19,000.00 | 22,150.00 | 22,150.00 | | 0058 | 736-04-10450 | Signal Pole (Single Mast Arm, 45ft) | 2 | EACH | 20,500.00 | 41,000.00 | 22,616.00 | 45,232.00 | 20,000.00 | 40,000.00 | 24,000.00 | 48,000.00 | | 0059 | 736-04-10500 | Signal Pole (Single Mast Arm, 50ft) | 1 | EACH | 22,000.00 | 22,000.00 | 26,078.00 | 26,078.00 | 22,000.00 | 22,000.00 | 26,000.00 | 26,000.00 | | 0060 | 736-05-31200 | Signal Heads (3 Sec, 12 inch Led Lens, LT. R, LT. Y, FLT. Y) | 1 | EACH | 1,350.00 | 1,350.00 | 1,467.00 | 1,467.00 | 1,300.00 | 1,300.00 | 1,550.00 | 1,550.00 | | 0061 | 736-05-41200 | Signal Heads (4 Section, 12 inch Led Lens, LT. R, LT. Y, FLT. Y, LT. G) | 2 | EACH | 1,600.00 | 3,200.00 | 1,795.00 | 3,590.00 | 1,500.00 | 3,000.00 | 1,990.00 | 3,980.00 | | 0062 | 736-06-00100 | Signal Service | 1 | EACH | 3,400.00 | 3,400.00 | 1,573.00 | 1,573.00 | 3,200.00 | 3,200.00 | 3,825.00 | 3,825.00 | | 0063 | 736-06-00500 | Signal Service Pedestal Disconnect | 1 | EACH | 2,800.00 | 2,800.00 | 6,117.00 | 6,117.00 | 2,700.00 | 2,700.00 | 3,300.00 | 3,300.00 | | 0064 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 1 | EACH | 5,400.00 | 5,400.00 | 3,474.00 | 3,474.00 | 5,200.00 | 5,200.00 | 3,200.00 | 3,200.00 | | 0065 | 736-09-00100 | Loop Detector | 1,150 | LNFT | 22.00 | 25,300.00 | 27.00 | 31,050.00 | 22.00 | 25,300.00 | 26.00 | 29,900.00 | | 0066 | 736-10-00200 | Underground Junction Box (Type E) | 4 | EACH | 1,250.00 | 5,000.00 | 1,358.00 | 5,432.00 | 1,240.00 | 4,960.00 | 1,500.00 | 6,000.00 | | 0067 | 736-10-00300 | Underground Junction Box (Type F) | 5 | EACH | 1,250.00 | 6,250.00 | 1,526.00 | 7,630.00 | 1,270.00 | 6,350.00 | 1,500.00 | 7,500.00 | | 0068 | 736-10-00400 | Underground Junction Box (Type G) | 1 | EACH | 1,909.24 | 1,909.24 | 2,269.00 | 2,269.00 | 1,800.00 | 1,800.00 | 2,200.00 | 2,200.00 | | 0069 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 100 | LNFT | 4.50 | 450.00 | 9.50 | 950.00 | 4.50 | 450.00 | 5.25 | 525.00 | | 0070 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 900 | LNFT | 7.00 | 6,300.00 | 4.50 | 4,050.00 | 7.00 | 6,300.00 | 8.20 | 7,380.00 | | 0071 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 625 | LNFT | 16.00 | 10,000.00 | 7.00 | 4,375.00 | 15.75 | 9,843.75 | 18.50 | 11,562.50 | | 0072 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) 19 Strand | 2,650 | LNFT | 2.25 | 5,962.50 | 4.00 | 10,600.00 | 2.25 | 5,962.50 | 2.75 | 7,287.50 | | 0073 | 736-12-02014 | Conductor (2c, #14 awg) | 325 | LNFT | 2.00 | 650.00 | 3.00 | 975.00 | 2.10 | 682.50 | 2.40 | 780.00 | | 0074 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 200 | LNFT | 8.00 | 1,600.00 | 10.00 | 2,000.00 | 7.60 | 1,520.00 | 9.00 | 1,800.00 | | 0075 | 736-12-06014 | Conductor (6c, #14 awg) | 450 | LNFT | 3.25 | 1,462.50 | 4.25 | 1,912.50 | 3.30 | 1,485.00 | 4.00 | 1,800.00 | | 0076 | 736-12-10014 | Conductor (10c, #14 awg) | 1,325 | LNFT | 5.00 | 6,625.00 | 6.00 | 7,950.00 | 4.75 | 6,293.75 | 5.50 | 7,287.50 | | 0077 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 1 | EACH | 1,700.00 | 1,700.00 | 2,173.00 | 2,173.00 | 1,600.00 | 1,600.00 | 1,900.00 | 1,900.00 | | 0078 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 4 | EACH | 8,000.00 | 32,000.00 | 8,054.00 | 32,216.00 | 7,800.00 | 31,200.00 | 9,200.00 | 36,800.00 | | 0079 | 739-01-00100 | Hydro-Seeding | 0.84 | ACRE | 4,000.00 | 3,360.00 | 3,544.00 | 2,976.96 | 4,000.00 | 3,360.00 | 4,625.00 | 3,885.00 | | 0080 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,500.00 | 12,500.00 | 8,875.00 | 8,875.00 | 25,000.00 | 25,000.00 | 20,650.00 | 20,650.00 | | 0081 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 20,949 | INLF | 0.70 | 14,664.30 | 1.25 | 26,186.25 | 0.75 | 15,711.75 | 0.80 | 16,759.20 | | 0082 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 1 | EACH | 27,500.00 | 27,500.00 | 31,800.00 | 31,800.00 | 26,000.00 | 26,000.00 | 31,000.00 | 31,000.00 | | 0083 | 713-10-00100 | Temporary Precast Concrete Barrier Movement | 124 | EACH | 145.00 | 17,980.00 | 393.69 | 48,817.56 | 140.00 | 17,360.00 | 60.00 | 7,440.00 | | 0084 | NS-700-00810 | Impact Attenuator (Construction Zone)(Test Level 3) | 2 | EACH | 4,600.00 | 9,200.00 | 2,500.00 | 5,000.00 | 7,500.00 | 15,000.00 | 5,300.00 | 10,600.00 | | 0085 | NS-700-00820 | Impact Attenuator Relocation (Construction Zone) | 2 | EACH | 800.00 | 1,600.00 | 9,500.00 | 19,000.00 | 1,000.00 | 2,000.00 | 925.00 | 1,850.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,891,629.95 | | 2,141,396.83 | | 2,289,049.11 | | 2,407,079.98 |
|