Proposal:H.014675.6
Parish:East Baton Rouge
Routes:US 61-X
Description:US 61-X: N. 22ND ST. - US 61
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, ASPHALT CONCRETE PAVEMENT, PEDESTRIAN CHANNELIZATION FENCING, CONCRETE SHARED-USE PATH, TRAFFIC SIGNALIZATION, INTELLIGENT TRANSPORTATION SYSTEM, AND RELATED WORK.
Estimated Construction Cost:$51,208,566.36
| Rank | License | Bidder | Construction Bid |
| 1 | 24901 | Hard Rock Construction LLC | $44,303,400.56 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $49,351,298.93 |
| 3 | 39462 | JB JAMES CONSTRUCTION LLC | $57,133,397.04 |
| 4 | 06276 | Barriere Construction Co., LLC | $57,988,679.23 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Hard Rock Construction LLC | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - JB JAMES CONSTRUCTION LLC | - 4 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 98,000.00 | 98,000.00 | 50,000.00 | 50,000.00 | 2,250,000.00 | 2,250,000.00 | 28,000.00 | 28,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,865.00 | 2,865.00 | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 55,000.00 | 55,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 19,702.2 | SQYD | 43.00 | 847,194.60 | 22.00 | 433,448.40 | 38.00 | 748,683.60 | 30.00 | 591,066.00 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 80 | EACH | 1,050.00 | 84,000.00 | 1,200.00 | 96,000.00 | 1,400.00 | 112,000.00 | 575.00 | 46,000.00 | | 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 35,376.1 | LNFT | 4.00 | 141,504.40 | 15.00 | 530,641.50 | 12.00 | 424,513.20 | 6.00 | 212,256.60 | | 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 39,914.8 | SQYD | 23.50 | 937,997.80 | 22.00 | 878,125.60 | 22.00 | 878,125.60 | 17.00 | 678,551.60 | | 0007 | 202-02-06102 | Removal of Incidental Concrete Paving | 3,500.1 | SQYD | 25.00 | 87,502.50 | 22.00 | 77,002.20 | 23.00 | 80,502.30 | 17.00 | 59,501.70 | | 0008 | 202-02-32140 | Removal of Pipe (Storm Drain) RCP 8"-36", PVC 6" | 9,974 | LNFT | 13.50 | 134,649.00 | 48.00 | 478,752.00 | 45.00 | 448,830.00 | 280.00 | 2,792,720.00 | | 0009 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 51,400.00 | 51,400.00 | 50,000.00 | 50,000.00 | 45,500.00 | 45,500.00 | 50,000.00 | 50,000.00 | | 0010 | 202-15-00900 | Relocate Light Pole (40') (Aluminum) (Twin Arm) | 5 | EACH | 6,726.00 | 33,630.00 | 7,000.00 | 35,000.00 | 6,000.00 | 30,000.00 | 6,000.00 | 30,000.00 | | 0011 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 434,823.00 | 434,823.00 | 900,000.00 | 900,000.00 | 2,250,000.00 | 2,250,000.00 | 255,000.00 | 255,000.00 | | 0012 | 203-10-00100 | Cleaning Existing Ditches | 536 | LNFT | 20.50 | 10,988.00 | 24.00 | 12,864.00 | 50.00 | 26,800.00 | 15.00 | 8,040.00 | | 0013 | 204-02-00100 | Temporary Hay Bales | 1,260 | EACH | 30.50 | 38,430.00 | 22.00 | 27,720.00 | 28.00 | 35,280.00 | 15.00 | 18,900.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 31,078 | LNFT | 2.50 | 77,695.00 | 2.50 | 77,695.00 | 7.00 | 217,546.00 | 2.00 | 62,156.00 | | 0015 | 302-02-04010 | Class II Base Course (4" Thick) (Asphalt Concrete Base) | 12,835.3 | SQYD | 43.50 | 558,335.55 | 40.00 | 513,412.00 | 37.00 | 474,906.10 | 55.00 | 705,941.50 | | 0016 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 443.3 | SQYD | 91.50 | 40,561.95 | 60.00 | 26,598.00 | 65.00 | 28,814.50 | 38.00 | 16,845.40 | | 0017 | 302-02-08080 | Class II Base Course (8" Thick) (Asphalt Concrete Base) | 28,467 | SQYD | 82.00 | 2,334,294.00 | 70.00 | 1,992,690.00 | 85.00 | 2,419,695.00 | 45.00 | 1,281,015.00 | | 0018 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 1,000 | CUYD | 140.00 | 140,000.00 | 55.00 | 55,000.00 | 220.00 | 220,000.00 | 105.00 | 105,000.00 | | 0019 | 502-01-00100 | Asphalt Concrete | 26,334.1 | TON | 150.00 | 3,950,115.00 | 135.00 | 3,555,103.50 | 133.00 | 3,502,435.30 | 150.00 | 3,950,115.00 | | 0020 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,455.6 | TON | 242.00 | 352,255.20 | 200.00 | 291,120.00 | 215.00 | 312,954.00 | 225.00 | 327,510.00 | | 0021 | 509-01-00100 | Milling Asphalt Pavement (2" AVG Thickness) | 109,276 | SQYD | 3.95 | 431,640.20 | 3.50 | 382,466.00 | 3.50 | 382,466.00 | 5.00 | 546,380.00 | | 0022 | 509-01-00100 | Milling Asphalt Pavement 4" Avg Thickness | 51,325 | SQYD | 6.70 | 343,877.50 | 6.00 | 307,950.00 | 6.00 | 307,950.00 | 9.00 | 461,925.00 | | 0023 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -8,830.6 | CUYD | 0.10 | -883.06 | 0.00 | 0.00 | 0.10 | -883.06 | 20.00 | -176,612.00 | | 0024 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) 8" thick | 292.8 | SQYD | 180.00 | 52,704.00 | 200.00 | 58,560.00 | 210.00 | 61,488.00 | 140.00 | 40,992.00 | | 0025 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 38,978 | LNFT | 3.50 | 136,423.00 | 3.00 | 116,934.00 | 3.00 | 116,934.00 | 4.50 | 175,401.00 | | 0026 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 23,612 | LNFT | 3.50 | 82,642.00 | 3.00 | 70,836.00 | 3.00 | 70,836.00 | 4.50 | 106,254.00 | | 0027 | 602-03-00100 | Cleaning and Sealing Random Cracks | 2,120 | LNFT | 5.00 | 10,600.00 | 7.00 | 14,840.00 | 5.00 | 10,600.00 | 5.50 | 11,660.00 | | 0028 | 602-05-01120 | Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) | 481.4 | SQYD | 185.00 | 89,059.00 | 300.00 | 144,420.00 | 550.00 | 264,770.00 | 800.00 | 385,120.00 | | 0029 | 602-05-02120 | Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) | 831.96 | SQYD | 185.00 | 153,912.60 | 250.00 | 207,990.00 | 475.00 | 395,181.00 | 700.00 | 582,372.00 | | 0030 | 602-05-03120 | Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) | 461.5 | SQYD | 185.00 | 85,377.50 | 200.00 | 92,300.00 | 500.00 | 230,750.00 | 650.00 | 299,975.00 | | 0031 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 654 | LNFT | 140.00 | 91,560.00 | 340.00 | 222,360.00 | 320.00 | 209,280.00 | 120.00 | 78,480.00 | | 0032 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 1,356 | LNFT | 154.00 | 208,824.00 | 370.00 | 501,720.00 | 390.00 | 528,840.00 | 140.00 | 189,840.00 | | 0033 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 2,131 | LNFT | 186.00 | 396,366.00 | 400.00 | 852,400.00 | 460.00 | 980,260.00 | 160.00 | 340,960.00 | | 0034 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 3,245 | LNFT | 255.00 | 827,475.00 | 425.00 | 1,379,125.00 | 480.00 | 1,557,600.00 | 200.00 | 649,000.00 | | 0035 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 2,325 | LNFT | 296.00 | 688,200.00 | 460.00 | 1,069,500.00 | 550.00 | 1,278,750.00 | 260.00 | 604,500.00 | | 0036 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 141 | LNFT | 390.00 | 54,990.00 | 490.00 | 69,090.00 | 800.00 | 112,800.00 | 800.00 | 112,800.00 | | 0037 | 701-14-00100 | Cleaning Existing Pipes Pipe Sizes Vary | 536 | LNFT | 28.00 | 15,008.00 | 70.00 | 37,520.00 | 50.00 | 26,800.00 | 100.00 | 53,600.00 | | 0038 | 701-15-00100 | Concrete Collar | 64 | EACH | 1,000.00 | 64,000.00 | 4,000.00 | 256,000.00 | 1,000.00 | 64,000.00 | 50.00 | 3,200.00 | | 0039 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 9,052 | LNFT | 6.00 | 54,312.00 | 7.00 | 63,364.00 | 1.00 | 9,052.00 | 6.00 | 54,312.00 | | 0040 | 702-02-00200 | Manholes (R-CB-11) | 32 | EACH | 9,300.00 | 297,600.00 | 7,100.00 | 227,200.00 | 16,000.00 | 512,000.00 | 14,000.00 | 448,000.00 | | 0041 | 702-03-00100 | Catch Basins (CB-01) | 5 | EACH | 4,900.00 | 24,500.00 | 6,000.00 | 30,000.00 | 17,000.00 | 85,000.00 | 10,000.00 | 50,000.00 | | 0042 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 8,000.00 | 16,000.00 | 9,000.00 | 18,000.00 | 15,000.00 | 30,000.00 | 11,000.00 | 22,000.00 | | 0043 | 702-03-00500 | Catch Basins (CB-06) | 118 | EACH | 6,500.00 | 767,000.00 | 8,500.00 | 1,003,000.00 | 15,000.00 | 1,770,000.00 | 11,000.00 | 1,298,000.00 | | 0044 | 702-03-00700 | Catch Basins (CB-08) | 10 | EACH | 15,000.00 | 150,000.00 | 18,000.00 | 180,000.00 | 23,000.00 | 230,000.00 | 22,500.00 | 225,000.00 | | 0045 | 702-03-00800 | Catch Basins (CB-09) | 1 | EACH | 10,250.00 | 10,250.00 | 12,000.00 | 12,000.00 | 14,000.00 | 14,000.00 | 11,250.00 | 11,250.00 | | 0046 | 702-04-00100 | Adjusting Manholes | 42 | EACH | 2,000.00 | 84,000.00 | 2,500.00 | 105,000.00 | 6,000.00 | 252,000.00 | 850.00 | 35,700.00 | | 0047 | 702-04-00200 | Adjusting Catch Basins | 50 | EACH | 1,700.00 | 85,000.00 | 3,800.00 | 190,000.00 | 4,200.00 | 210,000.00 | 2,550.00 | 127,500.00 | | 0048 | 706-01-00100 | Concrete Walk (4" Thick) | 9,377.9 | SQYD | 76.00 | 712,720.40 | 80.00 | 750,232.00 | 85.00 | 797,121.50 | 72.00 | 675,208.80 | | 0049 | 706-02-00300 | Concrete Drive (8" Thick) | 22,350.6 | SQYD | 105.00 | 2,346,813.00 | 115.00 | 2,570,319.00 | 120.00 | 2,682,072.00 | 95.00 | 2,123,307.00 | | 0050 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 400.1 | SQYD | 138.00 | 55,213.80 | 115.00 | 46,011.50 | 90.00 | 36,009.00 | 67.00 | 26,806.70 | | 0051 | 706-03-10000 | Incidental Concrete Paving (Colored)(inch Thick) 4" thick | 19,856.8 | SQYD | 156.00 | 3,097,660.80 | 125.00 | 2,482,100.00 | 85.00 | 1,687,828.00 | 78.00 | 1,548,830.40 | | 0052 | 706-04-00110 | Curb Ramps (TYPE 3) | 915.3 | SQYD | 287.00 | 262,691.10 | 220.00 | 201,366.00 | 150.00 | 137,295.00 | 195.00 | 178,483.50 | | 0053 | 706-04-00110 | Curb Ramps (TYPE 4) | 107.4 | SQYD | 280.00 | 30,072.00 | 180.00 | 19,332.00 | 120.00 | 12,888.00 | 195.00 | 20,943.00 | | 0054 | 706-04-00110 | Curb Ramps (TYPE 6) | 219.2 | SQYD | 282.00 | 61,814.40 | 200.00 | 43,840.00 | 110.00 | 24,112.00 | 195.00 | 42,744.00 | | 0055 | 706-04-00110 | Curb Ramps (TYPE 7) | 1,542.8 | SQYD | 275.00 | 424,270.00 | 200.00 | 308,560.00 | 100.00 | 154,280.00 | 195.00 | 300,846.00 | | 0056 | 706-04-00110 | Curb Ramps (TYPE 8) | 93 | SQYD | 314.00 | 29,202.00 | 180.00 | 16,740.00 | 140.00 | 13,020.00 | 195.00 | 18,135.00 | | 0057 | 707-01-00100 | Concrete Curb | 16,883.3 | LNFT | 22.75 | 384,095.08 | 33.00 | 557,148.90 | 45.00 | 759,748.50 | 30.00 | 506,499.00 | | 0058 | 707-03-00100 | Combination Concrete Curb and Gutter | 67,564.8 | LNFT | 45.00 | 3,040,416.00 | 40.00 | 2,702,592.00 | 45.00 | 3,040,416.00 | 55.00 | 3,716,064.00 | | 0059 | 710-01-00100 | Flowable Fill | 21 | CUYD | 412.00 | 8,652.00 | 200.00 | 4,200.00 | 1,000.00 | 21,000.00 | 500.00 | 10,500.00 | | 0060 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 870,000.00 | 870,000.00 | 1,100,000.00 | 1,100,000.00 | 3,400,000.00 | 3,400,000.00 | 2,750,000.00 | 2,750,000.00 | | 0061 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 12,866 | LNFT | 1.15 | 14,795.90 | 1.00 | 12,866.00 | 1.00 | 12,866.00 | 1.15 | 14,795.90 | | 0062 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.887 | MILE | 990.00 | 12,758.13 | 325.00 | 4,188.28 | 1,500.00 | 19,330.50 | 250.00 | 3,221.75 | | 0063 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 25.633 | MILE | 850.00 | 21,788.05 | 750.00 | 19,224.75 | 750.00 | 19,224.75 | 850.00 | 21,788.05 | | 0064 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 30.263 | MILE | 1,130.00 | 34,197.19 | 1,000.00 | 30,263.00 | 1,000.00 | 30,263.00 | 1,125.00 | 34,045.88 | | 0065 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 4 | EACH | 56.00 | 224.00 | 50.00 | 200.00 | 50.00 | 200.00 | 56.00 | 224.00 | | 0066 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 19 | EACH | 62.00 | 1,178.00 | 55.00 | 1,045.00 | 55.00 | 1,045.00 | 61.00 | 1,159.00 | | 0067 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 158 | EACH | 56.00 | 8,848.00 | 50.00 | 7,900.00 | 50.00 | 7,900.00 | 56.00 | 8,848.00 | | 0068 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 95 | EACH | 56.00 | 5,320.00 | 50.00 | 4,750.00 | 50.00 | 4,750.00 | 56.00 | 5,320.00 | | 0069 | 713-05-00240 | Temporary Pavement Legends & Symbols (Arrow - Merge) | 6 | EACH | 56.00 | 336.00 | 50.00 | 300.00 | 50.00 | 300.00 | 56.00 | 336.00 | | 0070 | 713-11-00100 | Portable Changeable Message Signs | 6 | EACH | 28,000.00 | 168,000.00 | 20,000.00 | 120,000.00 | 22,500.00 | 135,000.00 | 26,000.00 | 156,000.00 | | 0071 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 28,697.3 | SQYD | 15.00 | 430,459.50 | 11.00 | 315,670.30 | 10.00 | 286,973.00 | 12.00 | 344,367.60 | | 0072 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 47,000.00 | 47,000.00 | 30,000.00 | 30,000.00 | 70,000.00 | 70,000.00 | 42,000.00 | 42,000.00 | | 0073 | 726-01-00100 | Bedding Material | 1,277.3 | CUYD | 62.00 | 79,192.60 | 125.00 | 159,662.50 | 170.00 | 217,141.00 | 115.00 | 146,889.50 | | 0074 | 727-01-00100 | Mobilization | 1 | LUMP | 2,853,000.00 | 2,853,000.00 | 4,000,000.00 | 4,000,000.00 | 5,700,000.00 | 5,700,000.00 | 5,760,000.00 | 5,760,000.00 | | 0075 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 1,424.1 | SQFT | 28.50 | 40,586.85 | 100.00 | 142,410.00 | 35.00 | 49,843.50 | 11.00 | 15,665.10 | | 0076 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 139 | EACH | 254.00 | 35,306.00 | 165.00 | 22,935.00 | 150.00 | 20,850.00 | 168.00 | 23,352.00 | | 0077 | 731-02-00100 | Reflectorized Raised Pavement Markers | 2,661 | EACH | 8.00 | 21,288.00 | 8.00 | 21,288.00 | 7.00 | 18,627.00 | 7.00 | 18,627.00 | | 0078 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 7,507 | LNFT | 13.50 | 101,344.50 | 13.00 | 97,591.00 | 12.00 | 90,084.00 | 13.00 | 97,591.00 | | 0079 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 15.878 | MILE | 4,800.00 | 76,214.40 | 4,700.00 | 74,626.60 | 4,250.00 | 67,481.50 | 4,750.00 | 75,420.50 | | 0080 | 732-02-02020 | Plastic Pavement Striping (Solid Line) (6" Width) (Thermoplastic 90 mil) | 3.275 | MILE | 7,400.00 | 24,235.00 | 7,200.00 | 23,580.00 | 6,500.00 | 21,287.50 | 7,300.00 | 23,907.50 | | 0081 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 1.499 | MILE | 9,000.00 | 13,491.00 | 8,800.00 | 13,191.20 | 8,000.00 | 11,992.00 | 9,000.00 | 13,491.00 | | 0082 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 12.887 | MILE | 1,412.00 | 18,196.44 | 1,400.00 | 18,041.80 | 1,250.00 | 16,108.75 | 1,400.00 | 18,041.80 | | 0083 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.174 | MILE | 1,695.00 | 294.93 | 1,600.00 | 278.40 | 1,550.00 | 269.70 | 1,700.00 | 295.80 | | 0084 | 732-03-02012 | Plastic Pavement Striping (Dotted Line)(4" W)(3' L)(Thermo 90 mil) | 0.203 | MILE | 1,695.00 | 344.09 | 1,600.00 | 324.80 | 1,550.00 | 314.65 | 1,700.00 | 345.10 | | 0085 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.971 | MILE | 2,650.00 | 2,573.15 | 5,500.00 | 5,340.50 | 4,950.00 | 4,806.45 | 5,700.00 | 5,534.70 | | 0086 | 732-03-02041 | Plastic Pavement Striping (Dotted Line)(6" W)(3' L)(Thermo 90 mil) | 0.243 | MILE | 5,085.00 | 1,235.66 | 5,000.00 | 1,215.00 | 4,450.00 | 1,081.35 | 5,000.00 | 1,215.00 | | 0087 | 732-04-00001 | Plastic Pavement Legends and Symbols (Message) Pedestrian Symbol Detail | 7 | EACH | 678.00 | 4,746.00 | 662.00 | 4,634.00 | 600.00 | 4,200.00 | 675.00 | 4,725.00 | | 0088 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 340.00 | 340.00 | 332.00 | 332.00 | 300.00 | 300.00 | 335.00 | 335.00 | | 0089 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 8 | EACH | 395.00 | 3,160.00 | 400.00 | 3,200.00 | 350.00 | 2,800.00 | 400.00 | 3,200.00 | | 0090 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 75 | EACH | 339.00 | 25,425.00 | 332.00 | 24,900.00 | 300.00 | 22,500.00 | 337.00 | 25,275.00 | | 0091 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 45 | EACH | 339.00 | 15,255.00 | 332.00 | 14,940.00 | 300.00 | 13,500.00 | 337.00 | 15,165.00 | | 0092 | 732-04-01120 | Plastic Pavement Legends and Symbols (Arrow - Merge) | 2 | EACH | 367.00 | 734.00 | 360.00 | 720.00 | 325.00 | 650.00 | 365.00 | 730.00 | | 0093 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 194 | EACH | 565.00 | 109,610.00 | 550.00 | 106,700.00 | 500.00 | 97,000.00 | 575.00 | 111,550.00 | | 0094 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 339.00 | 678.00 | 330.00 | 660.00 | 300.00 | 600.00 | 350.00 | 700.00 | | 0095 | 732-05-00100 | Removal of Existing Markings | 4.688 | MILE | 6,700.00 | 31,409.60 | 6,000.00 | 28,128.00 | 6,000.00 | 28,128.00 | 6,800.00 | 31,878.40 | | 0096 | 736-01-00100 | Trenching and Backfilling | 4,547 | LNFT | 5.00 | 22,735.00 | 5.00 | 22,735.00 | 4.00 | 18,188.00 | 5.00 | 22,735.00 | | 0097 | 736-03-00100 | Jacking or Boring | 11,781 | LNFT | 13.00 | 153,153.00 | 13.00 | 153,153.00 | 11.00 | 129,591.00 | 13.50 | 159,043.50 | | 0098 | 736-04-00001 | Signal Pole (Pedestal Pole) | 84 | EACH | 1,350.00 | 113,400.00 | 1,300.00 | 109,200.00 | 1,200.00 | 100,800.00 | 1,350.00 | 113,400.00 | | 0099 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 81 | EACH | 1,550.00 | 125,550.00 | 1,500.00 | 121,500.00 | 1,350.00 | 109,350.00 | 1,515.00 | 122,715.00 | | 0100 | 736-05-30004 | Signal Heads (3 Section, 12 inch Led Lens, R, R, Y) | 7 | EACH | 1,550.00 | 10,850.00 | 1,500.00 | 10,500.00 | 1,350.00 | 9,450.00 | 1,515.00 | 10,605.00 | | 0101 | 736-05-31001 | Signal Heads (3 Sec, 12 inch Led Lens, LT. R, LT. Y, LT. G) | 19 | EACH | 1,550.00 | 29,450.00 | 1,500.00 | 28,500.00 | 1,350.00 | 25,650.00 | 1,515.00 | 28,785.00 | | 0102 | 736-05-41000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 2 | EACH | 1,800.00 | 3,600.00 | 1,800.00 | 3,600.00 | 1,650.00 | 3,300.00 | 1,850.00 | 3,700.00 | | 0103 | 736-05-41200 | Signal Heads (4 Section, 12 inch Led Lens, LT. R, LT. Y, FLT. Y, LT. G) | 8 | EACH | 1,850.00 | 14,800.00 | 1,800.00 | 14,400.00 | 1,650.00 | 13,200.00 | 1,850.00 | 14,800.00 | | 0104 | 736-05-45200 | Signal Heads (4 Section, 12" Led Lens, RT. R, SRT. Y, FRT. Y, RT. G) | 1 | EACH | 1,850.00 | 1,850.00 | 1,800.00 | 1,800.00 | 1,650.00 | 1,650.00 | 1,850.00 | 1,850.00 | | 0105 | 736-05-55000 | Signal Heads (5 Section, 12 inch Led Lens, R, Y, RT. Y, G, RT. G) | 13 | EACH | 2,046.00 | 26,598.00 | 2,000.00 | 26,000.00 | 1,800.00 | 23,400.00 | 2,000.00 | 26,000.00 | | 0106 | 736-06-00100 | Signal Service | 10 | EACH | 2,600.00 | 26,000.00 | 2,500.00 | 25,000.00 | 2,250.00 | 22,500.00 | 2,500.00 | 25,000.00 | | 0107 | 736-06-00500 | Signal Service Pedestal Disconnect | 9 | EACH | 2,700.00 | 24,300.00 | 2,700.00 | 24,300.00 | 2,400.00 | 21,600.00 | 2,750.00 | 24,750.00 | | 0108 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 10 | EACH | 5,900.00 | 59,000.00 | 5,800.00 | 58,000.00 | 5,250.00 | 52,500.00 | 5,900.00 | 59,000.00 | | 0109 | 736-10-00200 | Underground Junction Box (Type E) | 6 | EACH | 1,400.00 | 8,400.00 | 1,400.00 | 8,400.00 | 1,280.00 | 7,680.00 | 1,450.00 | 8,700.00 | | 0110 | 736-10-00300 | Underground Junction Box (Type F) | 112 | EACH | 2,200.00 | 246,400.00 | 2,200.00 | 246,400.00 | 1,900.00 | 212,800.00 | 2,179.00 | 244,048.00 | | 0111 | 736-10-00400 | Underground Junction Box (Type G) | 10 | EACH | 3,087.00 | 30,870.00 | 3,000.00 | 30,000.00 | 2,700.00 | 27,000.00 | 3,050.00 | 30,500.00 | | 0112 | 736-10-00600 | Underground Junction Box (Type I) | 4 | EACH | 3,600.00 | 14,400.00 | 3,600.00 | 14,400.00 | 3,250.00 | 13,000.00 | 3,750.00 | 15,000.00 | | 0113 | 736-10-00700 | Underground Junction Box (Type J) | 9 | EACH | 3,800.00 | 34,200.00 | 3,700.00 | 33,300.00 | 3,380.00 | 30,420.00 | 3,750.00 | 33,750.00 | | 0114 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 9,312 | LNFT | 12.00 | 111,744.00 | 11.00 | 102,432.00 | 10.00 | 93,120.00 | 12.00 | 111,744.00 | | 0115 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 12,731 | LNFT | 18.00 | 229,158.00 | 18.00 | 229,158.00 | 16.00 | 203,696.00 | 18.00 | 229,158.00 | | 0116 | 736-12-00002 | Conductor (Video Surveillance) | 834 | LNFT | 7.00 | 5,838.00 | 7.00 | 5,838.00 | 6.00 | 5,004.00 | 7.00 | 5,838.00 | | 0117 | 736-12-02006 | Conductor (2c, #6 awg) | 5,660 | LNFT | 6.00 | 33,960.00 | 6.00 | 33,960.00 | 5.00 | 28,300.00 | 5.20 | 29,432.00 | | 0118 | 736-12-02014 | Conductor (2c, #14 awg) | 20,506 | LNFT | 2.00 | 41,012.00 | 2.00 | 41,012.00 | 2.00 | 41,012.00 | 2.00 | 41,012.00 | | 0119 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 2,056 | LNFT | 8.00 | 16,448.00 | 8.00 | 16,448.00 | 7.00 | 14,392.00 | 8.00 | 16,448.00 | | 0120 | 736-12-06014 | Conductor (6c, #14 awg) | 28,853 | LNFT | 3.25 | 93,772.25 | 3.00 | 86,559.00 | 3.00 | 86,559.00 | 3.00 | 86,559.00 | | 0121 | 736-12-10014 | Conductor (10c, #14 awg) | 15,695 | LNFT | 4.75 | 74,551.25 | 4.60 | 72,197.00 | 4.00 | 62,780.00 | 4.20 | 65,919.00 | | 0122 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 84 | EACH | 1,200.00 | 100,800.00 | 1,200.00 | 100,800.00 | 1,050.00 | 88,200.00 | 1,120.00 | 94,080.00 | | 0123 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 116 | EACH | 1,200.00 | 139,200.00 | 1,200.00 | 139,200.00 | 1,060.00 | 122,960.00 | 1,190.00 | 138,040.00 | | 0124 | 739-01-00100 | Hydro-Seeding | 2.75 | ACRE | 2,800.00 | 7,700.00 | 3,300.00 | 9,075.00 | 2,500.00 | 6,875.00 | 3,100.00 | 8,525.00 | | 0125 | 740-01-00100 | Construction Layout | 1 | LUMP | 64,000.00 | 64,000.00 | 200,000.00 | 200,000.00 | 900,000.00 | 900,000.00 | 500,000.00 | 500,000.00 | | 0126 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 352,000.00 | 352,000.00 | 50,000.00 | 50,000.00 | 70,000.00 | 70,000.00 | 50,000.00 | 50,000.00 | | 0127 | 741-35-00100 | Adjust Valve or Meter Box | 24 | EACH | 476.00 | 11,424.00 | 600.00 | 14,400.00 | 600.00 | 14,400.00 | 112.00 | 2,688.00 | | 0128 | 742-03-00100 | Adjusting Sanitary Sewer Services Lines | 500 | LNFT | 250.00 | 125,000.00 | 82.00 | 41,000.00 | 80.00 | 40,000.00 | 28.00 | 14,000.00 | | 0129 | NS-201-00005 | Arborist Services | 1 | LUMP | 42,500.00 | 42,500.00 | 40,000.00 | 40,000.00 | 10,000.00 | 10,000.00 | 42,000.00 | 42,000.00 | | 0130 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 38,978 | LNFT | 2.00 | 77,956.00 | 2.00 | 77,956.00 | 2.00 | 77,956.00 | 4.80 | 187,094.40 | | 0131 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 23,612 | LNFT | 2.00 | 47,224.00 | 2.00 | 47,224.00 | 2.00 | 47,224.00 | 4.80 | 113,337.60 | | 0132 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 62,590 | LNFT | 1.00 | 62,590.00 | 1.00 | 62,590.00 | 1.00 | 62,590.00 | 1.45 | 90,755.50 | | 0133 | NS-500-00300 | Traffic Maintenance Asphalt Concrete | 500 | TON | 263.00 | 131,500.00 | 120.00 | 60,000.00 | 150.00 | 75,000.00 | 100.00 | 50,000.00 | | 0134 | NS-500-00360 | Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement | 459,083 | INLF | 0.85 | 390,220.55 | 0.80 | 367,266.40 | 0.75 | 344,312.25 | 1.30 | 596,807.90 | | 0135 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 87,656 | INLF | 0.95 | 83,273.20 | 0.80 | 70,124.80 | 0.85 | 74,507.60 | 1.30 | 113,952.80 | | 0136 | NS-700-00100 | Trench Drains | 875 | EACH | 1,550.00 | 1,356,250.00 | 3,800.00 | 3,325,000.00 | 965.00 | 844,375.00 | 750.00 | 656,250.00 | | 0137 | NS-700-00100 | Trench Drains Grates Only | 20 | EACH | 5,600.00 | 112,000.00 | 7,000.00 | 140,000.00 | 937.00 | 18,740.00 | 225.00 | 4,500.00 | | 0138 | NS-706-00440 | Shared-Use Path (Portland Cement Concrete) (6" Thick) | 20,588 | SQYD | 82.00 | 1,688,216.00 | 95.00 | 1,955,860.00 | 100.00 | 2,058,800.00 | 55.00 | 1,132,340.00 | | 0139 | NS-719-00001 | Tree Protection Fencing | 1 | LUMP | 110,000.00 | 110,000.00 | 25,000.00 | 25,000.00 | 26,000.00 | 26,000.00 | 100,000.00 | 100,000.00 | | 0140 | NS-719-00002 | Tree Trimming | 1 | LUMP | 76,000.00 | 76,000.00 | 70,000.00 | 70,000.00 | 90,000.00 | 90,000.00 | 75,000.00 | 75,000.00 | | 0141 | NS-719-00003 | Root Pruning | 1 | LUMP | 155,000.00 | 155,000.00 | 150,000.00 | 150,000.00 | 20,000.00 | 20,000.00 | 138,000.00 | 138,000.00 | | 0142 | NS-736-00001 | GPS | 10 | EACH | 500.00 | 5,000.00 | 500.00 | 5,000.00 | 450.00 | 4,500.00 | 500.00 | 5,000.00 | | 0143 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 10 | EACH | 30,900.00 | 309,000.00 | 30,000.00 | 300,000.00 | 27,360.00 | 273,600.00 | 27,750.00 | 277,500.00 | | 0144 | NS-736-00133 | Battery Back-up System for Traffic Signals | 10 | EACH | 14,230.00 | 142,300.00 | 14,000.00 | 140,000.00 | 12,600.00 | 126,000.00 | 13,000.00 | 130,000.00 | | 0145 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 116 | EACH | 1,500.00 | 174,000.00 | 1,400.00 | 162,400.00 | 1,300.00 | 150,800.00 | 1,350.00 | 156,600.00 | | 0146 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 11 | EACH | 5,000.00 | 55,000.00 | 5,000.00 | 55,000.00 | 4,480.00 | 49,280.00 | 4,500.00 | 49,500.00 | | 0147 | NS-ITS-01121 | CCTV Camera Assembly, Furnish and Install with PTZ, Digital | 9 | EACH | 5,600.00 | 50,400.00 | 5,500.00 | 49,500.00 | 5,000.00 | 45,000.00 | 5,000.00 | 45,000.00 | | 0148 | NS-ITS-04020 | Fiber Optic Cable, SM, Furnish & Install, 13-48 Fibers | 6,810 | LNFT | 5.00 | 34,050.00 | 5.00 | 34,050.00 | 4.00 | 27,240.00 | 4.30 | 29,283.00 | | 0149 | NS-ITS-04035 | Fiber Optic Fan Out Kits, SM, 12 Strand, Furnish & Install | 11 | EACH | 605.00 | 6,655.00 | 600.00 | 6,600.00 | 530.00 | 5,830.00 | 550.00 | 6,050.00 | | 0150 | NS-ITS-04180 | Fiber Optic Connection, Install, Splice | 135 | EACH | 32.00 | 4,320.00 | 32.00 | 4,320.00 | 29.00 | 3,915.00 | 30.00 | 4,050.00 | | 0151 | NS-ITS-04250 | Fiber Optic Drop Cable, SM, 12 Strand, Furnish & Install | 2,342 | LNFT | 3.80 | 8,899.60 | 4.00 | 9,368.00 | 3.00 | 7,026.00 | 4.50 | 10,539.00 | | 0152 | NS-ITS-04290 | Fiber Optic Patch Cord, SM, 2 Strand, Furnish & Install | 16 | EACH | 58.00 | 928.00 | 57.00 | 912.00 | 51.00 | 816.00 | 52.00 | 832.00 | | 0153 | NS-ITS-04425 | Fiber Optic Connection Patch Panel, Outdoor, Furnish & Install | 16 | EACH | 336.00 | 5,376.00 | 330.00 | 5,280.00 | 300.00 | 4,800.00 | 300.00 | 4,800.00 | | 0154 | NS-ITS-05025 | Splice Closure, Outdoor, Furnish & Install | 16 | EACH | 1,200.00 | 19,200.00 | 1,200.00 | 19,200.00 | 1,120.00 | 17,920.00 | 1,200.00 | 19,200.00 | | 0155 | NS-ITS-09080 | Local Ethernet Switch, Furnish & Install | 13 | EACH | 5,300.00 | 68,900.00 | 5,300.00 | 68,900.00 | 4,770.00 | 62,010.00 | 5,000.00 | 65,000.00 | | 0156 | NS-MSC-00080 | Detectable Warning Surface Retrofit for Curb Ramps | 212 | EACH | 308.00 | 65,296.00 | 500.00 | 106,000.00 | 450.00 | 95,400.00 | 315.00 | 66,780.00 | | 0157 | TS-702-37002 | Sanitary Sewer Conflict Box | 3 | EACH | 35,000.00 | 105,000.00 | 16,000.00 | 48,000.00 | 44,000.00 | 132,000.00 | 16,000.00 | 48,000.00 | | 0158 | TS-705-00400 | Pedestrian Channelization Fencing | 11,111 | LNFT | 305.00 | 3,388,855.00 | 360.00 | 3,999,960.00 | 350.00 | 3,888,850.00 | 1,134.00 | 12,599,874.00 | | 0159 | TS-736-10200 | Signal Support (Mast Arm Standard w/ 20 ft arm) | 4 | EACH | 25,000.00 | 100,000.00 | 24,000.00 | 96,000.00 | 22,070.00 | 88,280.00 | 23,000.00 | 92,000.00 | | 0160 | TS-736-10250 | Signal Support (Mast Arm Standard w/ 25 ft arm) | 1 | EACH | 26,000.00 | 26,000.00 | 25,000.00 | 25,000.00 | 23,100.00 | 23,100.00 | 23,500.00 | 23,500.00 | | 0161 | TS-736-10300 | Signal Support (Mast Arm Standard w/ 30 ft arm) | 1 | EACH | 26,000.00 | 26,000.00 | 26,000.00 | 26,000.00 | 23,900.00 | 23,900.00 | 24,000.00 | 24,000.00 | | 0162 | TS-736-10350 | Signal Support (Mast Arm Standard w/ 35 ft arm) | 3 | EACH | 31,000.00 | 93,000.00 | 30,000.00 | 90,000.00 | 26,800.00 | 80,400.00 | 27,500.00 | 82,500.00 | | 0163 | TS-736-10400 | Signal Support (Mast Arm Standard w/ 40 ft arm) | 6 | EACH | 32,000.00 | 192,000.00 | 32,000.00 | 192,000.00 | 29,000.00 | 174,000.00 | 30,000.00 | 180,000.00 | | 0164 | TS-736-10450 | Signal Support (Mast Arm Standard w/ 45 ft arm) | 8 | EACH | 34,000.00 | 272,000.00 | 33,000.00 | 264,000.00 | 30,000.00 | 240,000.00 | 30,000.00 | 240,000.00 | | 0165 | TS-736-10500 | Signal Support (Mast Arm Standard w/ 50 ft arm) | 3 | EACH | 37,000.00 | 111,000.00 | 36,000.00 | 108,000.00 | 33,000.00 | 99,000.00 | 37,000.00 | 111,000.00 | | 0166 | TS-736-10550 | Signal Support (Mast Arm Standard w/ 55 ft arm) | 5 | EACH | 46,500.00 | 232,500.00 | 46,000.00 | 230,000.00 | 41,400.00 | 207,000.00 | 42,000.00 | 210,000.00 | | 0167 | TS-736-10600 | Signal Support (Mast Arm Standard w/ 60 ft arm) | 3 | EACH | 55,000.00 | 165,000.00 | 53,000.00 | 159,000.00 | 48,600.00 | 145,800.00 | 50,000.00 | 150,000.00 | | 0168 | TS-736-10650 | Signal Support (Mast Arm Standard w/ 65 ft arm) | 3 | EACH | 57,000.00 | 171,000.00 | 55,000.00 | 165,000.00 | 50,000.00 | 150,000.00 | 50,000.00 | 150,000.00 | | 0169 | TS-736-10700 | Signal Support (Mast Arm Standard w/ 70 ft arm) | 1 | EACH | 65,000.00 | 65,000.00 | 62,000.00 | 62,000.00 | 56,700.00 | 56,700.00 | 57,000.00 | 57,000.00 | | 0170 | TS-736-12015 | Luminaire Arm w/LED Luminaire (15 ft. arm) | 36 | EACH | 3,600.00 | 129,600.00 | 3,500.00 | 126,000.00 | 3,150.00 | 113,400.00 | 3,200.00 | 115,200.00 | | 0171 | TS-736-15002 | GPS Based Traffic Signal Preemption System (With Existing Fiber Communication) | 7 | EACH | 8,100.00 | 56,700.00 | 8,000.00 | 56,000.00 | 7,180.00 | 50,260.00 | 8,000.00 | 56,000.00 | | 0172 | TS-736-36201 | Video Detection Modular (Rack Mounted) Communication Panel (Plan Locations) | 9 | EACH | 18,000.00 | 162,000.00 | 17,000.00 | 153,000.00 | 15,500.00 | 139,500.00 | 15,500.00 | 139,500.00 | | 0173 | TS-736-36203 | Video Detection Camera (Sensor) (Plan Locations) | 9 | EACH | 5,000.00 | 45,000.00 | 4,400.00 | 39,600.00 | 4,015.00 | 36,135.00 | 4,200.00 | 37,800.00 | | 0174 | TS-736-36204 | Video Detection Cable (Plan Locations) | 7,813 | LF | 1.80 | 14,063.40 | 2.00 | 15,626.00 | 2.00 | 15,626.00 | 1.75 | 13,672.75 | | 0175 | TS-736-73620 | Integrated Radar Unit & Video Detection Camera (Sensor) (Plan Locations) | 26 | EACH | 8,100.00 | 210,600.00 | 8,000.00 | 208,000.00 | 7,160.00 | 186,160.00 | 7,500.00 | 195,000.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 44,303,400.56 | | 49,351,298.93 | | 57,133,397.04 | | 57,988,679.23 |
|