Proposal:H.014241.6
Parish:Allen
Routes:LA 10
Description:LA 10: MILL CREEK BRIDGE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGE, GRADING, MILLING ASPHALT PAVEMENT, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, CONCRETE SLAB SPAN BRIDGE AND RELATED WORK.
Estimated Construction Cost:$2,163,379.20
| Rank | License | Bidder | Construction Bid |
| 1 | 55505 | MERRICK, LLC | $1,655,715.50 |
| 2 | 27239 | Apeck Construction, LLC | $1,658,792.35 |
| 3 | 00044 | Guinn Construction, LLC | $1,864,558.45 |
| 4 | 56994 | Matt L. Guinn Construction, LLC | $1,908,578.75 |
| 5 | 67770 | Reliant Industrial Solutions L.L.C. | $1,933,409.40 |
| 6 | 39462 | JB JAMES CONSTRUCTION LLC | $2,030,371.00 |
| 7 | 12312 | Gilchrist Construction Company, LLC | $2,114,323.20 |
| 8 | 52306 | SIEMA CONSTRUCTION, LLC | $2,264,125.00 |
| 9 | 00009 | Coastal Contractors, LLC | $2,899,327.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - MERRICK, LLC | - 2 - Apeck Construction, LLC | - 3 - Guinn Construction, LLC | - 4 - Matt L. Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.4 | LUMP | 8,000.00 | 8,000.00 | 271,548.91 | 271,548.91 | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 6,000.00 | 6,000.00 | 7,097.88 | 7,097.88 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 275.6 | SQYD | 10.00 | 2,756.00 | 14.47 | 3,987.93 | 15.00 | 4,134.00 | 20.00 | 5,512.00 | | 0004 | 202-02-04501 | Removal of Bridge (Str. No. 07020660401761, 58' x 28 ' LWPCSS) | 1,624 | LUMP | 38,000.00 | 38,000.00 | 23,330.87 | 23,330.87 | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 593.2 | LNFT | 10.00 | 5,932.00 | 6.16 | 3,654.11 | 10.00 | 5,932.00 | 10.00 | 5,932.00 | | 0006 | 203-01-00100 | General Excavation | 67 | CUYD | 35.00 | 2,345.00 | 21.19 | 1,419.73 | 30.00 | 2,010.00 | 50.00 | 3,350.00 | | 0007 | 203-02-00100 | Drainage Excavation | 84 | CUYD | 55.00 | 4,620.00 | 66.27 | 5,566.68 | 30.00 | 2,520.00 | 40.00 | 3,360.00 | | 0008 | 203-03-00100 | Embankment | 403 | CUYD | 40.00 | 16,120.00 | 52.68 | 21,230.04 | 50.00 | 20,150.00 | 50.00 | 20,150.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 901 | LNFT | 3.00 | 2,703.00 | 6.89 | 6,207.89 | 3.00 | 2,703.00 | 4.00 | 3,604.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 436.7 | TON | 300.00 | 131,010.00 | 236.73 | 103,379.99 | 285.00 | 124,459.50 | 300.00 | 131,010.00 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 53.6 | TON | 375.00 | 20,100.00 | 210.49 | 11,282.26 | 325.00 | 17,420.00 | 415.00 | 22,244.00 | | 0012 | 509-01-00100 | Milling Asphalt Pavement | 1,080 | SQYD | 10.00 | 10,800.00 | 10.12 | 10,929.60 | 15.00 | 16,200.00 | 19.00 | 20,520.00 | | 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -60 | CUYD | 0.10 | -6.00 | 0.01 | -0.60 | 0.00 | 0.00 | 1.00 | -60.00 | | 0014 | 510-01-00001 | Pavement Patching (16.5 inch minimum thickness) | 102 | SQYD | 250.00 | 25,500.00 | 225.03 | 22,953.06 | 240.00 | 24,480.00 | 300.00 | 30,600.00 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 150 | LNFT | 24.00 | 3,600.00 | 35.23 | 5,284.50 | 40.00 | 6,000.00 | 40.00 | 6,000.00 | | 0016 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 105.00 | 10,500.00 | 139.72 | 13,972.00 | 150.00 | 15,000.00 | 145.00 | 14,500.00 | | 0017 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,100.00 | 12,400.00 | 4,030.49 | 16,121.96 | 4,500.00 | 18,000.00 | 3,750.00 | 15,000.00 | | 0018 | 708-01-00100 | Right-of-Way Monument | 4 | EACH | 1,100.00 | 4,400.00 | 1,194.22 | 4,776.88 | 1,500.00 | 6,000.00 | 4,000.00 | 16,000.00 | | 0019 | 708-02-00100 | Right-of-Way Monument Witness Post | 4 | EACH | 250.00 | 1,000.00 | 238.85 | 955.40 | 400.00 | 1,600.00 | 600.00 | 2,400.00 | | 0020 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 716 | SQYD | 100.00 | 71,600.00 | 72.31 | 51,773.96 | 115.00 | 82,340.00 | 90.00 | 64,440.00 | | 0021 | 711-04-00100 | Geotextile Fabric | 716 | SQYD | 3.00 | 2,148.00 | 2.47 | 1,768.52 | 5.00 | 3,580.00 | 6.50 | 4,654.00 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 45,000.00 | 45,000.00 | 44,783.21 | 44,783.21 | 25,000.00 | 25,000.00 | 35,000.00 | 35,000.00 | | 0023 | 716-01-00100 | Mulch (Vegetative) | 0.7 | TON | 1,800.00 | 1,260.00 | 1,791.33 | 1,253.93 | 6,500.00 | 4,550.00 | 1,000.00 | 700.00 | | 0024 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 59 | SQYD | 6.00 | 354.00 | 2.39 | 141.01 | 10.00 | 590.00 | 100.00 | 5,900.00 | | 0025 | 724-01-00100 | Rumble Strips (Centerline) | 0.05 | MILE | 1,800.00 | 90.00 | 1,791.40 | 89.57 | 1,000.00 | 50.00 | 70,000.00 | 3,500.00 | | 0026 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.1 | MILE | 1,800.00 | 180.00 | 1,791.30 | 179.13 | 1,000.00 | 100.00 | 90,000.00 | 9,000.00 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 160,000.00 | 160,000.00 | 35,445.37 | 35,445.37 | 165,000.00 | 165,000.00 | 150,000.00 | 150,000.00 | | 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 210.00 | 840.00 | 101.51 | 406.04 | 200.00 | 800.00 | 500.00 | 2,000.00 | | 0029 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 276 | EACH | 12.00 | 3,312.00 | 11.94 | 3,295.44 | 20.00 | 5,520.00 | 35.00 | 9,660.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 22 | EACH | 12.00 | 264.00 | 11.94 | 262.68 | 15.00 | 330.00 | 30.00 | 660.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.161 | MILE | 11,000.00 | 1,771.00 | 12,609.75 | 2,030.17 | 15,000.00 | 2,415.00 | 20,000.00 | 3,220.00 | | 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.081 | MILE | 5,500.00 | 445.50 | 6,634.57 | 537.40 | 10,000.00 | 810.00 | 20,000.00 | 1,620.00 | | 0033 | 739-01-00100 | Hydro-Seeding | 0.44 | ACRE | 6,500.00 | 2,860.00 | 4,776.89 | 2,101.83 | 8,000.00 | 3,520.00 | 15,000.00 | 6,600.00 | | 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 11,387.30 | 11,387.30 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | | 0035 | 804-01-00400 | Precast Concrete Piles (18") | 2,090 | LNFT | 140.00 | 292,600.00 | 71.65 | 149,748.50 | 165.00 | 344,850.00 | 160.00 | 334,400.00 | | 0036 | 805-01-00100 | Class A1 Concrete (Slab Span) | 158.56 | CUYD | 1,300.00 | 206,128.00 | 1,485.26 | 235,502.83 | 2,000.00 | 317,120.00 | 1,800.00 | 285,408.00 | | 0037 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 50.27 | CUYD | 2,400.00 | 120,648.00 | 2,541.25 | 127,748.64 | 2,650.00 | 133,215.50 | 2,750.00 | 138,242.50 | | 0038 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,114 | SQFT | 3.00 | 3,342.00 | 6.56 | 7,307.84 | 2.00 | 2,228.00 | 2.50 | 2,785.00 | | 0039 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,114 | SQFT | 3.50 | 3,899.00 | 4.35 | 4,845.90 | 2.00 | 2,228.00 | 2.50 | 2,785.00 | | 0040 | 806-01-00100 | Deformed Reinforcing Steel | 38,047 | LB | 2.00 | 76,094.00 | 1.53 | 58,211.91 | 1.35 | 51,363.45 | 1.75 | 66,582.25 | | 0041 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 160 | LNFT | 150.00 | 24,000.00 | 308.76 | 49,401.60 | 250.00 | 40,000.00 | 200.00 | 32,000.00 | | 0042 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,200 | SQFT | 85.00 | 272,000.00 | 90.48 | 289,536.00 | 100.00 | 320,000.00 | 100.00 | 320,000.00 | | 0043 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 124 | SFIN | 225.00 | 27,900.00 | 288.92 | 35,826.08 | 95.00 | 11,780.00 | 125.00 | 15,500.00 | | 0044 | 815-03-00300 | Joint Seal (Poured) | 200 | LNFT | 15.00 | 3,000.00 | 6.87 | 1,374.00 | 20.00 | 4,000.00 | 20.00 | 4,000.00 | | 0045 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 240 | LNFT | 15.00 | 3,600.00 | 14.10 | 3,384.00 | 10.00 | 2,400.00 | 10.00 | 2,400.00 | | 0046 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 400 | LNFT | 3.00 | 1,200.00 | 6.94 | 2,776.00 | 5.00 | 2,000.00 | 5.00 | 2,000.00 | | 0047 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,080 | INLF | 5.00 | 5,400.00 | 3.68 | 3,974.40 | 2.00 | 2,160.00 | 5.00 | 5,400.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,655,715.50 | | 1,658,792.35 | | 1,864,558.45 | | 1,908,578.75 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Reliant Industrial Solutions L.L.C. | - 6 - JB JAMES CONSTRUCTION LLC | - 7 - Gilchrist Construction Company, LLC | - 8 - SIEMA CONSTRUCTION, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.4 | LUMP | 12,000.00 | 12,000.00 | 225,000.00 | 225,000.00 | 130,000.00 | 130,000.00 | 175,000.65 | 175,000.65 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 3,750.00 | 3,750.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 275.6 | SQYD | 37.00 | 10,197.20 | 30.00 | 8,268.00 | 25.00 | 6,890.00 | 26.00 | 7,165.60 | | 0004 | 202-02-04501 | Removal of Bridge (Str. No. 07020660401761, 58' x 28 ' LWPCSS) | 1,624 | LUMP | 53,000.00 | 53,000.00 | 53,000.00 | 53,000.00 | 101,000.00 | 101,000.00 | 38,400.00 | 38,400.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 593.2 | LNFT | 11.00 | 6,525.20 | 10.00 | 5,932.00 | 9.00 | 5,338.80 | 19.75 | 11,715.70 | | 0006 | 203-01-00100 | General Excavation | 67 | CUYD | 80.00 | 5,360.00 | 150.00 | 10,050.00 | 75.00 | 5,025.00 | 43.00 | 2,881.00 | | 0007 | 203-02-00100 | Drainage Excavation | 84 | CUYD | 65.00 | 5,460.00 | 50.00 | 4,200.00 | 75.00 | 6,300.00 | 45.00 | 3,780.00 | | 0008 | 203-03-00100 | Embankment | 403 | CUYD | 69.50 | 28,008.50 | 150.00 | 60,450.00 | 110.00 | 44,330.00 | 65.00 | 26,195.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 901 | LNFT | 3.30 | 2,973.30 | 6.00 | 5,406.00 | 4.00 | 3,604.00 | 3.50 | 3,153.50 | | 0010 | 502-01-00100 | Asphalt Concrete | 436.7 | TON | 275.00 | 120,092.50 | 250.00 | 109,175.00 | 290.00 | 126,643.00 | 225.00 | 98,257.50 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 53.6 | TON | 401.50 | 21,520.40 | 365.00 | 19,564.00 | 290.00 | 15,544.00 | 225.00 | 12,060.00 | | 0012 | 509-01-00100 | Milling Asphalt Pavement | 1,080 | SQYD | 7.65 | 8,262.00 | 12.00 | 12,960.00 | 15.00 | 16,200.00 | 8.00 | 8,640.00 | | 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -60 | CUYD | 1.00 | -60.00 | 0.01 | -0.60 | 1.00 | -60.00 | 0.01 | -0.60 | | 0014 | 510-01-00001 | Pavement Patching (16.5 inch minimum thickness) | 102 | SQYD | 247.50 | 25,245.00 | 225.00 | 22,950.00 | 225.00 | 22,950.00 | 215.00 | 21,930.00 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 150 | LNFT | 22.00 | 3,300.00 | 20.00 | 3,000.00 | 30.00 | 4,500.00 | 30.50 | 4,575.00 | | 0016 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 110.00 | 11,000.00 | 100.00 | 10,000.00 | 118.00 | 11,800.00 | 120.25 | 12,025.00 | | 0017 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,300.00 | 13,200.00 | 3,000.00 | 12,000.00 | 3,400.00 | 13,600.00 | 3,500.00 | 14,000.00 | | 0018 | 708-01-00100 | Right-of-Way Monument | 4 | EACH | 1,095.00 | 4,380.00 | 1,000.00 | 4,000.00 | 1,000.00 | 4,000.00 | 617.00 | 2,468.00 | | 0019 | 708-02-00100 | Right-of-Way Monument Witness Post | 4 | EACH | 160.00 | 640.00 | 200.00 | 800.00 | 200.00 | 800.00 | 617.00 | 2,468.00 | | 0020 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 716 | SQYD | 95.25 | 68,199.00 | 110.00 | 78,760.00 | 100.00 | 71,600.00 | 80.00 | 57,280.00 | | 0021 | 711-04-00100 | Geotextile Fabric | 716 | SQYD | 2.00 | 1,432.00 | 3.00 | 2,148.00 | 5.00 | 3,580.00 | 4.00 | 2,864.00 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 60,000.00 | 60,000.00 | | 0023 | 716-01-00100 | Mulch (Vegetative) | 0.7 | TON | 1,650.00 | 1,155.00 | 1,500.00 | 1,050.00 | 3,200.00 | 2,240.00 | 1,540.00 | 1,078.00 | | 0024 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 59 | SQYD | 5.50 | 324.50 | 2.00 | 118.00 | 7.00 | 413.00 | 2.00 | 118.00 | | 0025 | 724-01-00100 | Rumble Strips (Centerline) | 0.05 | MILE | 550.00 | 27.50 | 1,500.00 | 75.00 | 1,600.00 | 80.00 | 515.00 | 25.75 | | 0026 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.1 | MILE | 550.00 | 55.00 | 1,500.00 | 150.00 | 1,600.00 | 160.00 | 515.00 | 51.50 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 190,000.00 | 190,000.00 | 200,000.00 | 200,000.00 | 210,000.00 | 210,000.00 | 225,000.00 | 225,000.00 | | 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 110.00 | 440.00 | 200.00 | 800.00 | 90.00 | 360.00 | 88.00 | 352.00 | | 0029 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 276 | EACH | 11.00 | 3,036.00 | 10.00 | 2,760.00 | 10.00 | 2,760.00 | 10.25 | 2,829.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 22 | EACH | 11.00 | 242.00 | 10.00 | 220.00 | 10.00 | 220.00 | 10.25 | 225.50 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.161 | MILE | 11,000.00 | 1,771.00 | 10,000.00 | 1,610.00 | 10,000.00 | 1,610.00 | 10,300.00 | 1,658.30 | | 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.081 | MILE | 5,500.00 | 445.50 | 5,000.00 | 405.00 | 5,000.00 | 405.00 | 5,150.00 | 417.15 | | 0033 | 739-01-00100 | Hydro-Seeding | 0.44 | ACRE | 6,000.00 | 2,640.00 | 3,875.00 | 1,705.00 | 7,000.00 | 3,080.00 | 4,000.00 | 1,760.00 | | 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 26,000.00 | 26,000.00 | 20,000.00 | 20,000.00 | 40,000.00 | 40,000.00 | 22,150.00 | 22,150.00 | | 0035 | 804-01-00400 | Precast Concrete Piles (18") | 2,090 | LNFT | 152.00 | 317,680.00 | 160.00 | 334,400.00 | 165.00 | 344,850.00 | 160.00 | 334,400.00 | | 0036 | 805-01-00100 | Class A1 Concrete (Slab Span) | 158.56 | CUYD | 2,200.00 | 348,832.00 | 1,500.00 | 237,840.00 | 1,300.00 | 206,128.00 | 1,650.00 | 261,624.00 | | 0037 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 50.27 | CUYD | 2,900.00 | 145,783.00 | 2,300.00 | 115,621.00 | 2,000.00 | 100,540.00 | 4,100.00 | 206,107.00 | | 0038 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,114 | SQFT | 4.50 | 5,013.00 | 1.20 | 1,336.80 | 2.00 | 2,228.00 | 3.25 | 3,620.50 | | 0039 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,114 | SQFT | 3.00 | 3,342.00 | 3.00 | 3,342.00 | 2.00 | 2,228.00 | 4.50 | 5,013.00 | | 0040 | 806-01-00100 | Deformed Reinforcing Steel | 38,047 | LB | 1.40 | 53,265.80 | 1.40 | 53,265.80 | 1.20 | 45,656.40 | 1.85 | 70,386.95 | | 0041 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 160 | LNFT | 290.00 | 46,400.00 | 250.00 | 40,000.00 | 320.00 | 51,200.00 | 340.00 | 54,400.00 | | 0042 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,200 | SQFT | 98.00 | 313,600.00 | 90.00 | 288,000.00 | 110.00 | 352,000.00 | 145.00 | 464,000.00 | | 0043 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 124 | SFIN | 76.00 | 9,424.00 | 90.00 | 11,160.00 | 60.00 | 7,440.00 | 260.00 | 32,240.00 | | 0044 | 815-03-00300 | Joint Seal (Poured) | 200 | LNFT | 18.00 | 3,600.00 | 18.00 | 3,600.00 | 40.00 | 8,000.00 | 15.00 | 3,000.00 | | 0045 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 240 | LNFT | 23.00 | 5,520.00 | 10.00 | 2,400.00 | 18.00 | 4,320.00 | 11.00 | 2,640.00 | | 0046 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 400 | LNFT | 4.05 | 1,620.00 | 3.75 | 1,500.00 | 18.00 | 7,200.00 | 2.00 | 800.00 | | 0047 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,080 | INLF | 1.35 | 1,458.00 | 1.25 | 1,350.00 | 7.00 | 7,560.00 | 1.50 | 1,620.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 1,933,409.40 | | 2,030,371.00 | | 2,114,323.20 | | 2,264,125.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Coastal Contractors, LLC | | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.4 | LUMP | 55,000.00 | 55,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 30,000.00 | 30,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 275.6 | SQYD | 39.00 | 10,748.40 | | 0004 | 202-02-04501 | Removal of Bridge (Str. No. 07020660401761, 58' x 28 ' LWPCSS) | 1,624 | LUMP | 125,000.00 | 125,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 593.2 | LNFT | 25.00 | 14,830.00 | | 0006 | 203-01-00100 | General Excavation | 67 | CUYD | 89.00 | 5,963.00 | | 0007 | 203-02-00100 | Drainage Excavation | 84 | CUYD | 90.00 | 7,560.00 | | 0008 | 203-03-00100 | Embankment | 403 | CUYD | 106.00 | 42,718.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 901 | LNFT | 5.00 | 4,505.00 | | 0010 | 502-01-00100 | Asphalt Concrete | 436.7 | TON | 275.00 | 120,092.50 | | 0011 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 53.6 | TON | 400.00 | 21,440.00 | | 0012 | 509-01-00100 | Milling Asphalt Pavement | 1,080 | SQYD | 40.00 | 43,200.00 | | 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -60 | CUYD | 1.00 | -60.00 | | 0014 | 510-01-00001 | Pavement Patching (16.5 inch minimum thickness) | 102 | SQYD | 275.00 | 28,050.00 | | 0015 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 150 | LNFT | 22.00 | 3,300.00 | | 0016 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 110.00 | 11,000.00 | | 0017 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 3,250.00 | 13,000.00 | | 0018 | 708-01-00100 | Right-of-Way Monument | 4 | EACH | 1,200.00 | 4,800.00 | | 0019 | 708-02-00100 | Right-of-Way Monument Witness Post | 4 | EACH | 225.00 | 900.00 | | 0020 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 716 | SQYD | 140.00 | 100,240.00 | | 0021 | 711-04-00100 | Geotextile Fabric | 716 | SQYD | 7.00 | 5,012.00 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | | 0023 | 716-01-00100 | Mulch (Vegetative) | 0.7 | TON | 3,500.00 | 2,450.00 | | 0024 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 59 | SQYD | 7.00 | 413.00 | | 0025 | 724-01-00100 | Rumble Strips (Centerline) | 0.05 | MILE | 550.00 | 27.50 | | 0026 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.1 | MILE | 550.00 | 55.00 | | 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 280,000.00 | 280,000.00 | | 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 225.00 | 900.00 | | 0029 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 276 | EACH | 17.50 | 4,830.00 | | 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 22 | EACH | 10.00 | 220.00 | | 0031 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.161 | MILE | 12,000.00 | 1,932.00 | | 0032 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.081 | MILE | 6,000.00 | 486.00 | | 0033 | 739-01-00100 | Hydro-Seeding | 0.44 | ACRE | 7,000.00 | 3,080.00 | | 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | | 0035 | 804-01-00400 | Precast Concrete Piles (18") | 2,090 | LNFT | 190.00 | 397,100.00 | | 0036 | 805-01-00100 | Class A1 Concrete (Slab Span) | 158.56 | CUYD | 4,000.00 | 634,240.00 | | 0037 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 50.27 | CUYD | 4,500.00 | 226,215.00 | | 0038 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 1,114 | SQFT | 4.00 | 4,456.00 | | 0039 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 1,114 | SQFT | 5.00 | 5,570.00 | | 0040 | 806-01-00100 | Deformed Reinforcing Steel | 38,047 | LB | 1.50 | 57,070.50 | | 0041 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 160 | LNFT | 370.00 | 59,200.00 | | 0042 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 3,200 | SQFT | 140.00 | 448,000.00 | | 0043 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 124 | SFIN | 125.00 | 15,500.00 | | 0044 | 815-03-00300 | Joint Seal (Poured) | 200 | LNFT | 35.00 | 7,000.00 | | 0045 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 240 | LNFT | 22.00 | 5,280.00 | | 0046 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 400 | LNFT | 4.00 | 1,600.00 | | 0047 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,080 | INLF | 1.30 | 1,404.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,899,327.90 |
|