Proposal:H.016374.6
Parish:LaSalle
Routes:US 84
Description:US 84: OLLA FIELD RD - W. JCT. LA 772
Type Construction:CLEARING AND GRUBBING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY AND RELATED WORK.
Estimated Construction Cost:$3,719,858.44
| Rank | License | Bidder | Construction Bid |
| 1 | 12312 | Gilchrist Construction Company, LLC | $3,289,427.31 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $3,392,501.23 |
| 3 | 05789 | D & J CONSTRUCTION CO., LLC | $4,076,859.40 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Gilchrist Construction Company, LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - D & J CONSTRUCTION CO., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00200 | Clearing and Grubbing (Selective) APPROX. 1.92 ACRES | 1.92 | LUMP | 150,000.00 | 150,000.00 | 80,000.00 | 80,000.00 | 100,000.00 | 100,000.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement Guard Rail Pads | 659 | SQYD | 18.00 | 11,862.00 | 45.00 | 29,655.00 | 15.00 | 9,885.00 | | 0003 | 202-02-14500 | Removal of Guard Rail | 804 | LNFT | 8.00 | 6,432.00 | 13.00 | 10,452.00 | 25.00 | 20,100.00 | | 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 20 | CUYD | 150.00 | 3,000.00 | 17.00 | 340.00 | 100.00 | 2,000.00 | | 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 262.2 | CUYD | 100.00 | 26,220.00 | 68.00 | 17,829.60 | 75.00 | 19,665.00 | | 0006 | 502-01-00100 | Asphalt Concrete | 12,058.9 | TON | 131.00 | 1,579,715.90 | 150.00 | 1,808,835.00 | 185.00 | 2,230,896.50 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 922.7 | TON | 131.00 | 120,873.70 | 287.00 | 264,814.90 | 225.00 | 207,607.50 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 121,403 | SQYD | 2.25 | 273,156.75 | 2.50 | 303,507.50 | 3.50 | 424,910.50 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -2,562 | CUYD | 1.00 | -2,562.00 | 1.00 | -2,562.00 | 1.00 | -2,562.00 | | 0010 | 510-01-00001 | Pavement Patching 9" MINIMUM | 50 | SQYD | 350.00 | 17,500.00 | 383.00 | 19,150.00 | 300.00 | 15,000.00 | | 0011 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 250 | LNFT | 32.00 | 8,000.00 | 35.00 | 8,750.00 | 40.00 | 10,000.00 | | 0012 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 100 | LNFT | 38.00 | 3,800.00 | 85.00 | 8,500.00 | 100.00 | 10,000.00 | | 0013 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 122.00 | 24,400.00 | 135.00 | 27,000.00 | 150.00 | 30,000.00 | | 0014 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 8 | EACH | 3,200.00 | 25,600.00 | 3,900.00 | 31,200.00 | 4,000.00 | 32,000.00 | | 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 55,000.00 | 55,000.00 | 125,000.00 | 125,000.00 | | 0016 | 713-02-00300 | Temporary Pavement Markings (8" Width) Turn Lane @ LA 500 Int. | 200 | LNFT | 0.35 | 70.00 | 0.40 | 80.00 | 6.00 | 1,200.00 | | 0017 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 10.497 | MILE | 280.00 | 2,939.16 | 140.00 | 1,469.58 | 300.00 | 3,149.10 | | 0018 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.264 | MILE | 525.00 | 3,288.60 | 600.00 | 3,758.40 | 600.00 | 3,758.40 | | 0019 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 32.93 | MILE | 600.00 | 19,758.00 | 1,000.00 | 32,930.00 | 800.00 | 26,344.00 | | 0020 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) Turn Lane @ LA 500 Int. | 4 | EACH | 25.00 | 100.00 | 35.00 | 140.00 | 50.00 | 200.00 | | 0021 | 724-01-00100 | Rumble Strips (Centerline) | 5.138 | MILE | 1,000.00 | 5,138.00 | 1,100.00 | 5,651.80 | 650.00 | 3,339.70 | | 0022 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 5.138 | MILE | 1,000.00 | 5,138.00 | 1,100.00 | 5,651.80 | 650.00 | 3,339.70 | | 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 320,000.00 | 320,000.00 | 255,000.00 | 255,000.00 | 300,000.00 | 300,000.00 | | 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 90.00 | 720.00 | 135.00 | 1,080.00 | 135.00 | 1,080.00 | | 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 973 | EACH | 5.00 | 4,865.00 | 5.00 | 4,865.00 | 8.00 | 7,784.00 | | 0026 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) Turn Lane @ LA 500 Int. | 200 | LNFT | 4.00 | 800.00 | 3.00 | 600.00 | 20.00 | 4,000.00 | | 0027 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) Turn Lane @ LA 500 Int. | 240 | LNFT | 11.00 | 2,640.00 | 15.00 | 3,600.00 | 25.00 | 6,000.00 | | 0028 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16.465 | MILE | 4,700.00 | 77,385.50 | 4,200.00 | 69,153.00 | 6,500.00 | 107,022.50 | | 0029 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.132 | MILE | 1,600.00 | 5,011.20 | 1,200.00 | 3,758.40 | 2,000.00 | 6,264.00 | | 0030 | 732-03-02010 | Plastic Pavement Striping (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.27 | MILE | 1,800.00 | 486.00 | 7,500.00 | 2,025.00 | 10,000.00 | 2,700.00 | | 0031 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) Turn Lane @ LA 500 Int. | 4 | EACH | 300.00 | 1,200.00 | 350.00 | 1,400.00 | 600.00 | 2,400.00 | | 0032 | 732-05-00100 | Removal of Existing Markings @ Bridge Decks & Approaches | 0.091 | MILE | 5,000.00 | 455.00 | 11,000.00 | 1,001.00 | 15,000.00 | 1,365.00 | | 0033 | 735-01-00100 | Mailboxes | 22 | EACH | 1.00 | 22.00 | 1.00 | 22.00 | 35.00 | 770.00 | | 0034 | 735-02-00100 | Mailbox Supports (Single) | 20 | EACH | 375.00 | 7,500.00 | 400.00 | 8,000.00 | 300.00 | 6,000.00 | | 0035 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 375.00 | 375.00 | 400.00 | 400.00 | 400.00 | 400.00 | | 0036 | 739-01-00100 | Hydro-Seeding | 0.02 | ACRE | 21,000.00 | 420.00 | 22,000.00 | 440.00 | 30,000.00 | 600.00 | | 0037 | 740-01-00100 | Construction Layout | 1 | LUMP | 75,000.00 | 75,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | | 0038 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 82,549 | LNFT | 2.00 | 165,098.00 | 1.65 | 136,205.85 | 1.65 | 136,205.85 | | 0039 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 34,056 | LNFT | 2.00 | 68,112.00 | 1.65 | 56,192.40 | 1.40 | 47,678.40 | | 0040 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 116,605 | LNFT | 1.50 | 174,907.50 | 1.00 | 116,605.00 | 1.25 | 145,756.25 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,289,427.31 | | 3,392,501.23 | | 4,076,859.40 |
|