Proposal:H.016361.6
Parish:Orleans
Routes:I-910, LA 428
Description:LA 428(GEN DEGAULLE): MARR & WALL BL INT
Type Construction:MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE PAVEMENT, CONCRETE WALKS AND CURBS, DRILLED SHAFT FOUNDATIONS, TRAFFIC SIGNALIZATION, INTELLEGENT TRANSPORTATION SYSTEM, AND RELATED WORK.
Estimated Construction Cost:$1,023,260.36
| Rank | License | Bidder | Construction Bid |
| 1 | 48896 | Command Construction Industries LLC | $889,576.81 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Command Construction Industries LLC | | Unit Price | Total Amount | | 0001 | 202-02-00010 | Removal of Curb Ramps | 10 | EACH | 500.00 | 5,000.00 | | 0002 | 202-02-03030 | Removal of Pavement Structure | 640.6 | SQYD | 25.00 | 16,015.00 | | 0003 | 202-02-06060 | Removal of Concrete Catch Basin | 2 | EACH | 0.01 | 0.02 | | 0004 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 643.8 | LNFT | 10.00 | 6,438.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 18 | SQYD | 25.00 | 450.00 | | 0006 | 202-02-06140 | Removal of Curbs (Concrete) | 78.1 | LNFT | 10.00 | 781.00 | | 0007 | 202-02-26300 | Removal of Median / Island | 13 | SQYD | 25.00 | 325.00 | | 0008 | 202-02-38200 | Removal of Signs | 1 | EACH | 50.00 | 50.00 | | 0009 | 202-02-38240 | Removal of Signs and Supports | 10 | EACH | 100.00 | 1,000.00 | | 0010 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 3,000.00 | 3,000.00 | | 0011 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 1,000.00 | 1,000.00 | | 0012 | 203-07-00100 | Borrow (Vehicular Measurement) | 173 | CUYD | 100.00 | 17,300.00 | | 0013 | 204-06-00100 | Temporary Silt Fencing | 1,261 | LNFT | 0.01 | 12.61 | | 0014 | 502-01-00100 | Asphalt Concrete | 284.8 | TON | 275.00 | 78,320.00 | | 0015 | 509-01-00100 | Milling Asphalt Pavement | 2,589 | SQYD | 7.00 | 18,123.00 | | 0016 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -144 | CUYD | 0.01 | -1.44 | | 0017 | 510-01-00001 | Pavement Patching (9.5" Minimum Thickness) | 21 | SQYD | 200.00 | 4,200.00 | | 0018 | 702-04-00210 | Convert Catch Basins to Manholes | 2 | EACH | 3,500.00 | 7,000.00 | | 0019 | 706-01-00100 | Concrete Walk (4" Thick) | 119.6 | SQYD | 85.00 | 10,166.00 | | 0020 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 26.8 | SQYD | 110.00 | 2,948.00 | | 0021 | 706-04-00110 | Curb Ramps Type 3 | 89.1 | SQYD | 225.00 | 20,047.50 | | 0022 | 706-04-00110 | Curb Ramps Type 7 | 26.6 | SQYD | 225.00 | 5,985.00 | | 0023 | 707-01-00100 | Concrete Curb | 78.1 | LNFT | 50.00 | 3,905.00 | | 0024 | 707-03-00100 | Combination Concrete Curb and Gutter | 212.2 | LNFT | 75.00 | 15,915.00 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | | 0026 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 507 | LNFT | 0.01 | 5.07 | | 0027 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 92 | LNFT | 0.01 | 0.92 | | 0028 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 436 | LNFT | 0.01 | 4.36 | | 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.246 | MILE | 0.01 | 0.00 | | 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.332 | MILE | 0.01 | 0.00 | | 0031 | 713-05-00190 | Temporary Pavement Legends & Symbols (Arrow - Straight) | 1 | EACH | 0.01 | 0.01 | | 0032 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 1 | EACH | 0.01 | 0.01 | | 0033 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 1 | EACH | 0.01 | 0.01 | | 0034 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 2 | EACH | 0.01 | 0.02 | | 0035 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 482 | EACH | 0.01 | 4.82 | | 0036 | 716-01-00100 | Mulch (Vegetative) | 0.3 | TON | 2,500.00 | 750.00 | | 0037 | 717-01-00100 | Seeding | 7 | LB | 50.00 | 350.00 | | 0038 | 718-01-00100 | Fertilizer | 170 | LB | 10.00 | 1,700.00 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | | 0040 | 729-01-00100 | Sign (Type A) | 141.9 | SQFT | 1.00 | 141.90 | | 0041 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 150.00 | 1,200.00 | | 0042 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 7 | EACH | 250.00 | 1,750.00 | | 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 482 | EACH | 4.00 | 1,928.00 | | 0044 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 92 | LNFT | 10.00 | 920.00 | | 0045 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 258 | LNFT | 3.00 | 774.00 | | 0046 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 436 | LNFT | 20.00 | 8,720.00 | | 0047 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.332 | MILE | 4,500.00 | 1,494.00 | | 0048 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.047 | MILE | 15,000.00 | 705.00 | | 0049 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.246 | MILE | 1,500.00 | 369.00 | | 0050 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.008 | MILE | 3,000.00 | 24.00 | | 0051 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 1 | EACH | 400.00 | 400.00 | | 0052 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 400.00 | 400.00 | | 0053 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 1 | EACH | 400.00 | 400.00 | | 0054 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 400.00 | 800.00 | | 0055 | 732-05-00100 | Removal of Existing Markings | 0.108 | MILE | 3,000.00 | 324.00 | | 0056 | 736-01-00100 | Trenching and Backfilling | 1,394 | LNFT | 10.00 | 13,940.00 | | 0057 | 736-03-00100 | Jacking or Boring | 741 | LNFT | 50.00 | 37,050.00 | | 0058 | 736-04-00001 | Signal Pole (Pedestal Pole) | 7 | EACH | 1,750.00 | 12,250.00 | | 0059 | 736-04-10250 | Signal Pole (Single Mast Arm, 25ft) | 1 | EACH | 16,000.00 | 16,000.00 | | 0060 | 736-04-10300 | Signal Pole (Single Mast Arm, 30ft) | 2 | EACH | 17,000.00 | 34,000.00 | | 0061 | 736-04-23525 | Signal Pole (Dual Mast Arm, 35ft-Arm 1, 25ft-Arm 2) | 1 | EACH | 30,000.00 | 30,000.00 | | 0062 | 736-04-24035 | Signal Pole (Dual Mast Arm, 40ft-Arm 1, 35ft-Arm 2) | 1 | EACH | 32,000.00 | 32,000.00 | | 0063 | 736-05-30000 | Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) | 13 | EACH | 1,200.00 | 15,600.00 | | 0064 | 736-05-35001 | Signal Heads (3 Sec, 12 inch Led Lens, RT. R, RT. Y, RT. G) | 2 | EACH | 1,200.00 | 2,400.00 | | 0065 | 736-05-41000 | Signal Heads (4 Section, 12" Led Lens, R, Y, LT. G, G) | 1 | EACH | 1,500.00 | 1,500.00 | | 0066 | 736-05-41201 | Signal Heads (4 Section, 12" Optically Programmed Lens, LT. R, SLT. Y, FLT. Y, LT. G) | 1 | EACH | 10,000.00 | 10,000.00 | | 0067 | 736-06-00100 | Signal Service | 1 | EACH | 3,000.00 | 3,000.00 | | 0068 | 736-06-00500 | Signal Service Pedestal Disconnect | 1 | EACH | 2,500.00 | 2,500.00 | | 0069 | 736-08-00102 | Signal Controller (980 ATC, Type 2)(Furnish & Install) | 2 | EACH | 6,500.00 | 13,000.00 | | 0070 | 736-09-00100 | Loop Detector | 985 | LNFT | 25.00 | 24,625.00 | | 0071 | 736-10-00200 | Underground Junction Box (Type E) | 4 | EACH | 1,200.00 | 4,800.00 | | 0072 | 736-10-00300 | Underground Junction Box (Type F) | 13 | EACH | 1,400.00 | 18,200.00 | | 0073 | 736-10-00400 | Underground Junction Box (Type G) | 2 | EACH | 1,900.00 | 3,800.00 | | 0074 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 190 | LNFT | 2.00 | 380.00 | | 0075 | 736-11-00200 | Conduit (2" HDPE, Schedule 80) | 1,174 | LNFT | 6.00 | 7,044.00 | | 0076 | 736-11-00300 | Conduit (3" HDPE, Schedule 80) | 1,161 | LNFT | 8.00 | 9,288.00 | | 0077 | 736-12-00000 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 1,409 | LNFT | 2.00 | 2,818.00 | | 0078 | 736-12-02014 | Conductor (2c, #14 awg) | 2,178 | LNFT | 2.00 | 4,356.00 | | 0079 | 736-12-03006 | Conductor (3c, 6 gauge / #6 awg) | 260 | LNFT | 8.00 | 2,080.00 | | 0080 | 736-12-06014 | Conductor (6c, #14 awg) | 3,472 | LNFT | 3.00 | 10,416.00 | | 0081 | 736-12-10014 | Conductor (10c, #14 awg) | 3,222 | LNFT | 4.00 | 12,888.00 | | 0082 | 736-15-02400 | Signal Support (Foundation, 24 inch Minimum Diameter) | 8 | EACH | 1,250.00 | 10,000.00 | | 0083 | 736-15-03600 | Signal Support (Foundation, 36 inch Minimum Diameter) | 5 | EACH | 7,500.00 | 37,500.00 | | 0084 | 736-21-00000 | LED Pedestrian Countdown Signal Head | 12 | EACH | 900.00 | 10,800.00 | | 0085 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | | 0086 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,090 | INLF | 1.00 | 1,090.00 | | 0087 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 607 | INLF | 1.00 | 607.00 | | 0088 | NS-736-00130 | TS-2 Traffic Signal Cabinet (Ground Mounted) | 1 | EACH | 25,000.00 | 25,000.00 | | 0089 | NS-736-00135 | 2-Wire Accessible Pedestrian Pushbutton Detectors | 12 | EACH | 1,250.00 | 15,000.00 | | 0090 | NS-736-00136 | 2-Wire Accessible Pedestrian Pushbutton Cabinet Control | 2 | EACH | 4,500.00 | 9,000.00 | | 0091 | NS-ITS-04035 | Fiber Optic Fan Out Kits, SM, 12 Strand, Furnish & Install | 1 | EACH | 200.00 | 200.00 | | 0092 | NS-ITS-04180 | Fiber Optic Connection, Install, Splice | 12 | EACH | 50.00 | 600.00 | | 0093 | NS-ITS-04200 | Fiber Optic Connection, Termination, Furnish & Install | 12 | EACH | 100.00 | 1,200.00 | | 0094 | NS-ITS-04250 | Fiber Optic Drop Cable, SM, 12 Strand, Furnish & Install | 100 | LNFT | 5.00 | 500.00 | | 0095 | NS-ITS-04290 | Fiber Optic Patch Cord, SM, 2 Strand, Furnish & Install | 2 | EACH | 100.00 | 200.00 | | 0096 | NS-ITS-04420 | Fiber Optic Connection Patch Panel, Indoor, Furnish & Install | 1 | EACH | 1,250.00 | 1,250.00 | | 0097 | NS-ITS-05025 | Splice Closure, Outdoor, Furnish & Install | 1 | EACH | 1,250.00 | 1,250.00 | | 0098 | NS-ITS-09080 | Local Ethernet Switch, Furnish & Install | 2 | EACH | 5,000.00 | 10,000.00 | | 0099 | NS-MSC-00279 | Adjusting Valve Boxes | 2 | EACH | 150.00 | 300.00 | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 889,576.81 |
|