Proposal:H.016105.6
Parish:Acadia
Routes:LA 365
Description:LA 365: LA 1098 - LA 98
Type Construction:CLEARING AND GRUBBING, BORROW, DRAINAGE STRUCTURES, LIME TREATMENT, IN-PLACE CEMENT TREATED SUBGRADE, IN-PLACE CEMENT TREATED BASE COURSE, PAVEMENT PATCHING, MILLING ASPHALT CONCRETE, REINFORCED PAVING MAT, ASPHALT CONCRETE OVERLAY, AND RELATED WORK
Estimated Construction Cost:$7,544,494.43
| Rank | License | Bidder | Construction Bid |
| 1 | 51821 | Elliott Construction, LLC | $6,832,015.84 |
| 2 | 33663 | Glenn Lege Construction LLC | $6,994,234.43 |
| 3 | 34356 | Prairie Contractors LLC | $7,329,246.20 |
| 4 | 12312 | Gilchrist Construction Company, LLC | $8,237,967.60 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Elliott Construction, LLC | - 2 - Glenn Lege Construction LLC | - 3 - Prairie Contractors LLC | - 4 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 12,000.00 | 12,000.00 | 36,764.00 | 36,764.00 | 25,000.00 | 25,000.00 | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 45,000.00 | 45,000.00 | 119,745.60 | 119,745.60 | 85,000.00 | 85,000.00 | 100,000.00 | 100,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 10 | SQYD | 55.00 | 550.00 | 32.83 | 328.30 | 200.00 | 2,000.00 | 800.00 | 8,000.00 | | 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 214 | SQYD | 30.00 | 6,420.00 | 23.63 | 5,056.82 | 40.00 | 8,560.00 | 45.00 | 9,630.00 | | 0005 | 202-02-38220 | Removal of Sign Supports | 57 | EACH | 45.00 | 2,565.00 | 17.42 | 992.94 | 60.00 | 3,420.00 | 52.00 | 2,964.00 | | 0006 | 202-02-38360 | Removal of Sign Faces | 55 | EACH | 17.00 | 935.00 | 11.62 | 639.10 | 12.00 | 660.00 | 11.00 | 605.00 | | 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,337 | CUYD | 35.00 | 46,795.00 | 65.82 | 88,001.34 | 60.00 | 80,220.00 | 60.00 | 80,220.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 79 | EACH | 165.00 | 13,035.00 | 174.23 | 13,764.17 | 150.00 | 11,850.00 | 130.00 | 10,270.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 600 | LNFT | 2.50 | 1,500.00 | 2.32 | 1,392.00 | 6.00 | 3,600.00 | 6.00 | 3,600.00 | | 0010 | 303-02-00100 | Removal of Existing Patches | 200 | SQYD | 28.00 | 5,600.00 | 22.00 | 4,400.00 | 60.00 | 12,000.00 | 65.00 | 13,000.00 | | 0011 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 62,031.6 | SQYD | 14.00 | 868,442.40 | 11.89 | 737,555.72 | 15.00 | 930,474.00 | 14.00 | 868,442.40 | | 0012 | 304-01-00100 | Lime | 293.11 | TON | 350.00 | 102,588.50 | 303.97 | 89,096.65 | 415.00 | 121,640.65 | 300.00 | 87,933.00 | | 0013 | 304-05-00100 | Lime Treatment (Type E) | 31,016 | SQYD | 4.75 | 147,326.00 | 5.28 | 163,764.48 | 6.40 | 198,502.40 | 6.00 | 186,096.00 | | 0014 | 309-01-12000 | In-Place Cement Treated Subgrade (12" Thick) | 62,032 | SQYD | 14.00 | 868,448.00 | 11.03 | 684,212.96 | 13.00 | 806,416.00 | 16.00 | 992,512.00 | | 0015 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 2,014 | CUYD | 75.00 | 151,050.00 | 110.43 | 222,406.02 | 45.00 | 90,630.00 | 50.00 | 100,700.00 | | 0016 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 37.9 | CUYD | 75.00 | 2,842.50 | 63.02 | 2,388.46 | 200.00 | 7,580.00 | 200.00 | 7,580.00 | | 0017 | 402-02-00101 | Traffic Maintenance Surfacing (Hard) | 231 | SQYD | 95.00 | 21,945.00 | 76.15 | 17,590.65 | 100.00 | 23,100.00 | 150.00 | 34,650.00 | | 0018 | 502-01-00100 | Asphalt Concrete | 17,709.1 | TON | 130.00 | 2,302,183.00 | 151.79 | 2,688,064.29 | 123.00 | 2,178,219.30 | 160.00 | 2,833,456.00 | | 0019 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,357.5 | TON | 180.00 | 244,350.00 | 194.85 | 264,508.88 | 65.00 | 88,237.50 | 160.00 | 217,200.00 | | 0020 | 509-01-00100 | Milling Asphalt Pavement | 45,054 | SQYD | 2.75 | 123,898.50 | 2.28 | 102,723.12 | 3.25 | 146,425.50 | 3.00 | 135,162.00 | | 0021 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,876 | CUYD | 0.01 | -18.76 | 0.01 | -18.76 | 0.01 | -18.76 | 1.00 | -1,876.00 | | 0022 | 510-01-00001 | Pavement Patching 13.5" Min. Thickness | 532 | SQYD | 165.00 | 87,780.00 | 181.54 | 96,579.28 | 187.00 | 99,484.00 | 240.00 | 127,680.00 | | 0023 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 272 | LNFT | 285.00 | 77,520.00 | 362.12 | 98,496.64 | 530.15 | 144,200.80 | 375.00 | 102,000.00 | | 0024 | 701-02-01060 | Cross Drain Pipe Arch (42" Equiv. RCPA) | 68 | LNFT | 400.00 | 27,200.00 | 359.12 | 24,420.16 | 474.95 | 32,296.60 | 525.00 | 35,700.00 | | 0025 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 70 | LNFT | 270.00 | 18,900.00 | 289.49 | 20,264.30 | 472.65 | 33,085.50 | 350.00 | 24,500.00 | | 0026 | 701-05-02104 | Side Drain Pipe (Erosion) (36" RPVCP/CPEPDW/CPPPDW/CPPPTW/CMP) | 48 | LNFT | 355.00 | 17,040.00 | 223.48 | 10,727.04 | 332.35 | 15,952.80 | 325.00 | 15,600.00 | | 0027 | 701-15-00100 | Concrete Collar | 2 | EACH | 2,310.00 | 4,620.00 | 1,378.65 | 2,757.30 | 1,628.40 | 3,256.80 | 3,100.00 | 6,200.00 | | 0028 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 200 | LNFT | 43.00 | 8,600.00 | 124.74 | 24,948.00 | 13.80 | 2,760.00 | 5.00 | 1,000.00 | | 0029 | 710-01-00100 | Flowable Fill | 441 | CUYD | 240.00 | 105,840.00 | 189.07 | 83,379.87 | 247.25 | 109,037.25 | 250.00 | 110,250.00 | | 0030 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 87 | SQYD | 170.00 | 14,790.00 | 128.58 | 11,186.46 | 163.30 | 14,207.10 | 250.00 | 21,750.00 | | 0031 | 711-04-00100 | Geotextile Fabric | 87 | SQYD | 12.00 | 1,044.00 | 23.63 | 2,055.81 | 20.70 | 1,800.90 | 2.00 | 174.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 125,000.00 | 125,000.00 | 184,724.66 | 184,724.66 | 200,000.00 | 200,000.00 | 125,000.00 | 125,000.00 | | 0033 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 14.792 | MILE | 800.00 | 11,833.60 | 656.50 | 9,710.95 | 600.00 | 8,875.20 | 350.00 | 5,177.20 | | 0034 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 14.756 | MILE | 550.00 | 8,115.80 | 580.75 | 8,569.55 | 1.00 | 14.76 | 500.00 | 7,378.00 | | 0035 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 33.304 | MILE | 900.00 | 29,973.60 | 929.20 | 30,946.08 | 1.00 | 33.30 | 600.00 | 19,982.40 | | 0036 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 12,000.00 | 12,000.00 | 25,078.30 | 25,078.30 | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | | 0037 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 7.488 | MILE | 1,150.00 | 8,611.20 | 1,161.50 | 8,697.31 | 1,200.00 | 8,985.60 | 1,000.00 | 7,488.00 | | 0038 | 726-01-00100 | Bedding Material | 161.7 | CUYD | 198.00 | 32,016.60 | 111.84 | 18,084.53 | 200.00 | 32,340.00 | 225.00 | 36,382.50 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 500,000.00 | 500,000.00 | 198,919.50 | 198,919.50 | 700,000.00 | 700,000.00 | 803,000.00 | 803,000.00 | | 0040 | 729-01-00100 | Sign (Type A) | 267.2 | SQFT | 40.00 | 10,688.00 | 40.65 | 10,861.68 | 40.00 | 10,688.00 | 32.00 | 8,550.40 | | 0041 | 729-16-00200 | Object Marker Assembly (Type 2) | 22 | EACH | 85.00 | 1,870.00 | 110.34 | 2,427.48 | 80.00 | 1,760.00 | 70.00 | 1,540.00 | | 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 95.00 | 190.00 | 145.19 | 290.38 | 150.00 | 300.00 | 130.00 | 260.00 | | 0043 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 56 | EACH | 185.00 | 10,360.00 | 232.30 | 13,008.80 | 1,650.00 | 92,400.00 | 125.00 | 7,000.00 | | 0044 | 731-02-00100 | Reflectorized Raised Pavement Markers | 496 | EACH | 7.00 | 3,472.00 | 6.97 | 3,457.12 | 7.50 | 3,720.00 | 5.00 | 2,480.00 | | 0045 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.326 | MILE | 5,900.00 | 49,123.40 | 6,214.03 | 51,738.01 | 6,500.00 | 54,119.00 | 4,700.00 | 39,132.20 | | 0046 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.689 | MILE | 3,500.00 | 12,911.50 | 3,658.73 | 13,497.05 | 4,000.00 | 14,756.00 | 1,500.00 | 5,533.50 | | 0047 | 735-01-00100 | Mailboxes | 83 | EACH | 22.00 | 1,826.00 | 29.04 | 2,410.32 | 10.00 | 830.00 | 1.00 | 83.00 | | 0048 | 735-02-00100 | Mailbox Supports (Single) | 77 | EACH | 275.00 | 21,175.00 | 290.38 | 22,359.26 | 300.00 | 23,100.00 | 250.00 | 19,250.00 | | 0049 | 735-03-00100 | Mailbox Supports (Double) | 3 | EACH | 400.00 | 1,200.00 | 580.75 | 1,742.25 | 300.00 | 900.00 | 250.00 | 750.00 | | 0050 | 739-01-00100 | Hydro-Seeding | 1 | ACRE | 3,100.00 | 3,100.00 | 3,252.20 | 3,252.20 | 5,500.00 | 5,500.00 | 4,750.00 | 4,750.00 | | 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 9,000.00 | 9,000.00 | 54,226.90 | 54,226.90 | 12,000.00 | 12,000.00 | 40,000.00 | 40,000.00 | | 0052 | 805-15-01200 | Reinforced Concrete Box Culverts (Precast) (6' x 6') | 168 | LNFT | 1,235.00 | 207,480.00 | 1,228.97 | 206,466.96 | 1,800.00 | 302,400.00 | 1,500.00 | 252,000.00 | | 0053 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Class A1 Concrete = 24.57 CUYD
Deformed Reinforcing Steel = 1,493.84 LB | 2 | EACH | 84,000.00 | 168,000.00 | 45,462.63 | 90,925.26 | 80,000.00 | 160,000.00 | 100,000.00 | 200,000.00 | | 0054 | NS-502-04200 | Reinforced Paving Mat for Asphalt Concrete Overlay | 57,105 | SQYD | 4.00 | 228,420.00 | 5.70 | 325,498.50 | 6.00 | 342,630.00 | 6.00 | 342,630.00 | | 0055 | NS-502-04210 | Asphalt Tack Coat | 8,566 | GAL | 5.00 | 42,830.00 | 10.23 | 87,630.18 | 6.00 | 51,396.00 | 7.00 | 59,962.00 | | 0056 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,160 | INLF | 1.75 | 2,030.00 | 1.31 | 1,519.60 | 2.50 | 2,900.00 | 4.00 | 4,640.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,832,015.84 | | 6,994,234.43 | | 7,329,246.20 | | 8,237,967.60 |
|