Proposal:H.016087.6
Parish:Iberia
Routes:LA 83
Description:LA 83: 1.9 MI N WEEKS ISL-5.7 MI S LYDIA
Type Construction:CLASS II BASE COURSE, MILLING ASPHALT CONCRETE, GEOGRID, ASPHALT CONCRETE OVERLAY, GEOCELL CONFINEMENT SYSTEM, AND RELATED WORK.
Estimated Construction Cost:$2,698,588.82
| Rank | License | Bidder | Construction Bid |
| 1 | 52306 | SIEMA CONSTRUCTION, LLC | $2,772,927.45 |
| 2 | 33663 | Glenn Lege Construction LLC | $3,077,260.61 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SIEMA CONSTRUCTION, LLC | - 2 - Glenn Lege Construction LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00030 | Removal of barrier | 284 | LNFT | 46.00 | 13,064.00 | 196.00 | 55,664.00 | | 0002 | 202-02-02020 | Removal of Asphalt Pavement | 590.6 | SQYD | 16.25 | 9,597.25 | 20.50 | 12,107.30 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 7,789 | SQYD | 11.25 | 87,626.25 | 12.00 | 93,468.00 | | 0004 | 202-02-14500 | Removal of Guard Rail | 866 | LNFT | 10.00 | 8,660.00 | 15.10 | 13,076.60 | | 0005 | 202-02-38220 | Removal of Sign Supports | 5 | EACH | 110.00 | 550.00 | 235.00 | 1,175.00 | | 0006 | 202-02-38360 | Removal of Sign Faces | 5 | EACH | 95.00 | 475.00 | 117.00 | 585.00 | | 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 130,000.00 | 130,000.00 | 244,750.00 | 244,750.00 | | 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 165.00 | 1,320.00 | 175.00 | 1,400.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 7,071 | LNFT | 2.50 | 17,677.50 | 2.25 | 15,909.75 | | 0010 | 302-01-00300 | Class II Base Course (Crushed Stone) | 2,598 | CUYD | 200.00 | 519,600.00 | 157.50 | 409,185.00 | | 0011 | 302-03-00100 | Base Drain Outlet | 36 | EACH | 1,005.00 | 36,180.00 | 1,800.00 | 64,800.00 | | 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 329 | CUYD | 140.00 | 46,060.00 | 120.00 | 39,480.00 | | 0013 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 50 | CUYD | 130.00 | 6,500.00 | 120.00 | 6,000.00 | | 0014 | 502-01-00100 | Asphalt Concrete | 3,270.3 | TON | 185.00 | 605,005.50 | 177.80 | 581,459.34 | | 0015 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 150.7 | TON | 535.00 | 80,624.50 | 186.00 | 28,030.20 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 4,005 | SQYD | 18.00 | 72,090.00 | 10.10 | 40,450.50 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -238 | CUYD | 12.00 | -2,856.00 | 0.10 | -23.80 | | 0018 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 56 | LNFT | 52.00 | 2,912.00 | 52.00 | 2,912.00 | | 0019 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 68.8 | LNFT | 36.00 | 2,476.80 | 41.00 | 2,820.80 | | 0020 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 143.00 | 14,300.00 | 157.00 | 15,700.00 | | 0021 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 4 | EACH | 4,050.00 | 16,200.00 | 4,825.00 | 19,300.00 | | 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 80,000.00 | 80,000.00 | 126,025.00 | 126,025.00 | | 0023 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 20,000.00 | 20,000.00 | 24,270.00 | 24,270.00 | | 0024 | 724-01-00100 | Rumble Strips (Centerline) | 0.7 | MILE | 360.00 | 252.00 | 350.00 | 245.00 | | 0025 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 1.4 | MILE | 360.00 | 504.00 | 350.00 | 490.00 | | 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 | 265,450.00 | 265,450.00 | | 0027 | 729-01-00100 | Sign (Type A) | 45 | SQFT | 42.00 | 1,890.00 | 58.00 | 2,610.00 | | 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 102.00 | 408.00 | 157.00 | 628.00 | | 0029 | 729-22-00200 | Square Tubing Post with 2-1/4" Omni-Directional Anchor | 5 | EACH | 102.00 | 510.00 | 300.00 | 1,500.00 | | 0030 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 3,308 | EACH | 9.50 | 31,426.00 | 9.30 | 30,764.40 | | 0031 | 731-02-00100 | Reflectorized Raised Pavement Markers | 460 | EACH | 6.00 | 2,760.00 | 6.00 | 2,760.00 | | 0032 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.672 | MILE | 5,350.00 | 19,645.20 | 5,230.00 | 19,204.56 | | 0033 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.211 | MILE | 2,950.00 | 622.45 | 2,905.00 | 612.96 | | 0034 | 732-05-00100 | Removal of Existing Markings | 0.244 | MILE | 10,000.00 | 2,440.00 | 9,875.00 | 2,409.50 | | 0035 | 739-01-00100 | Hydro-Seeding | 5.5 | ACRE | 3,100.00 | 17,050.00 | 3,550.00 | 19,525.00 | | 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 18,750.00 | 18,750.00 | 136,000.00 | 136,000.00 | | 0037 | 810-05-00100 | Concrete Roadway Barrier (Standard) | 48 | LNFT | 550.00 | 26,400.00 | 580.00 | 27,840.00 | | 0038 | 815-03-00300 | Joint Seal (Poured) | 1,750 | LNFT | 33.00 | 57,750.00 | 32.30 | 56,525.00 | | 0039 | NS-300-00060 | Geogrid | 11,785 | SQYD | 1.90 | 22,391.50 | 2.00 | 23,570.00 | | 0040 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 56 | LNFT | 80.00 | 4,480.00 | 78.00 | 4,368.00 | | 0041 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 64 | INLF | 11.75 | 752.00 | 1.75 | 112.00 | | 0042 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement 12" Deep | 2,892 | INLF | 1.25 | 3,615.00 | 1.75 | 5,061.00 | | 0043 | NS-602-00001 | Milling Concrete Pavement | 376.8 | SQYD | 120.00 | 45,216.00 | 35.00 | 13,188.00 | | 0044 | NS-DEV-30201 | Geocell Confinement System | 11,785 | SQYD | 46.50 | 548,002.50 | 56.50 | 665,852.50 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,772,927.45 | | 3,077,260.61 |
|