Search


Bid Tabulations for the Letting of 12/10/2025 LA DOTD Headquarters

Proposal:H.015921.6
Parish:Ouachita
Description:WEST MONROE N. 6TH STREET SIDEWALKS
Type Construction:CLEARING AND GRUBBING, DRAINAGE STRUCTURES, CONCRETE WALKS AND DRIVES, AND RELATED WORK.
Estimated Construction Cost:$1,548,727.00
Rank License BidderConstruction Bid
115099Amethyst Construction, Inc.$1,126,505.35
264911Bentz Construction Group, LLC$1,168,631.80
330774Progressive Construction Co., LLC$1,561,884.50


Line
Number
Item NumberItem DescriptionQuantityUnit of
Measure
- 1 -
Amethyst Construction, Inc.
- 2 -
Bentz Construction Group, LLC
- 3 -
Progressive Construction Co., LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001201-01-00100Clearing and Grubbing 1     LUMP5,000.005,000.008,000.008,000.0060,000.0060,000.00
0002202-02-02000Removal of Asphalt Drives 42     SQYD55.002,310.0033.001,386.0050.002,100.00
0003202-02-06100Removal of Concrete Walks and Drives 1,057     SQYD34.0035,938.0025.0026,425.0040.0042,280.00
0004202-02-06140Removal of Curbs (Concrete) 56     LNFT24.001,344.0035.001,960.0025.001,400.00
0005202-02-32120Removal of Pipe (Side Drain) (10", 12", 15", 18" Pipe)348     LNFT38.0013,224.0029.0010,092.0035.0012,180.00
0006202-03-38000Relocation of Sign 10     EACH175.001,750.00560.005,600.00500.005,000.00
0007203-02-00100Drainage Excavation 50     CUYD25.001,250.0045.002,250.0050.002,500.00
0008203-07-00100Borrow (Vehicular Measurement) (SELECT SOILS)190     CUYD54.0010,260.0070.0013,300.0050.009,500.00
0009204-02-00100Temporary Hay Bales 100     EACH60.006,000.0020.002,000.0045.004,500.00
0010204-06-00100Temporary Silt Fencing 4,813     LNFT3.5016,845.503.0014,439.004.0019,252.00
0011402-01-00101Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) 30     CUYD125.003,750.00250.007,500.00200.006,000.00
0012701-03-01002Storm Drain Pipe (15" RCP/RPVCP) 178     LNFT125.0022,250.00129.0022,962.00160.0028,480.00
0013701-03-01022Storm Drain Pipe (18" RCP/RPVCP) 301     LNFT120.0036,120.00156.0046,956.00170.0051,170.00
0014701-04-01000Storm Drain Pipe Arch (15" Equiv. RCPA) 292     LNFT130.0037,960.00150.0043,800.00240.0070,080.00
0015701-04-01020Storm Drain Pipe Arch (18" Equiv. RCPA) 401     LNFT125.0050,125.00173.0069,373.00305.00122,305.00
0016702-03-00010Catch Basins (CB-01 MODIFIED - A)8     EACH6,200.0049,600.006,410.0051,280.008,000.0064,000.00
0017702-03-00010Catch Basins (CB-01 MODIFIED - B)5     EACH6,000.0030,000.006,510.0032,550.008,000.0040,000.00
0018702-03-00100Catch Basins (CB-01) 23     EACH6,100.00140,300.006,610.00152,030.006,800.00156,400.00
0019706-01-00100Concrete Walk (4" Thick) 2,015.4   SQYD115.00231,771.0095.00191,463.00120.00241,848.00
0020706-01-00100Concrete Walk (4" Thick) (WITH INTEGRAL CURB)374.8   SQYD130.0048,724.00113.0042,352.40145.0054,346.00
0021706-01-00300Concrete Walk (6" Thick) 64.7   SQYD135.008,734.50120.007,764.00165.0010,675.50
0022706-02-00200Concrete Drive (6" Thick) 903.9   SQYD148.00133,777.20127.00114,795.30150.00135,585.00
0023706-03-00100Incidental Concrete Paving (4" Thick) 23.8   SQYD128.003,046.40206.004,902.80500.0011,900.00
0024706-04-00110Curb Ramps (CUSTOM)64.8   SQYD325.0021,060.00459.0029,743.20400.0025,920.00
0025706-04-00110Curb Ramps (TYPE 3)64.8   SQYD330.0021,384.00337.0021,837.60400.0025,920.00
0026707-01-00100Concrete Curb 54     LNFT22.001,188.00150.008,100.0065.003,510.00
0027710-01-00100Flowable Fill 45     CUYD250.0011,250.00252.0011,340.00250.0011,250.00
0028711-01-03000Riprap (30 lb, 14" Thick) 20     SQYD100.002,000.00165.003,300.00250.005,000.00
0029711-04-00100Geotextile Fabric 22     SQYD2.5055.002.0044.0050.001,100.00
0030713-01-00100Temporary Signs and Barricades 1     LUMP25,000.0025,000.0050,000.0050,000.0045,000.0045,000.00
0031726-01-00100Bedding Material 155     CUYD125.0019,375.00160.0024,800.00165.0025,575.00
0032727-01-00100Mobilization 1     LUMP35,000.0035,000.0040,000.0040,000.00150,000.00150,000.00
0033739-01-00100Hydro-Seeding 1.8   ACRE4,500.008,100.006,465.0011,637.003,000.005,400.00
0034740-01-00100Construction Layout 1     LUMP25,000.0025,000.0015,000.0015,000.0035,000.0035,000.00
0035741-31-00100Relocate Water Meter 11     EACH450.004,950.001,550.0017,050.00850.009,350.00
0036NS-201-00001Tree and Stump Removal (<= 36" Diameter) 1     EACH1,500.001,500.001,350.001,350.002,500.002,500.00
0037NS-500-00340Saw Cutting Asphalt Concrete Pavement 3,798     INLF1.505,697.003.0011,394.002.509,495.00
0038NS-600-00220Saw Cutting Portland Cement Concrete Pavement 1,101     INLF1.751,926.755.506,055.503.003,303.00
0039NS-700-00100Trench Drains 5     EACH7,200.0036,000.004,000.0020,000.006,500.0032,500.00
0040NS-MSC-00080Detectable Warning Surface Retrofit for Curb Ramps 2     EACH1,450.002,900.001,500.003,000.001,200.002,400.00
0041TS-800-00300Handrail 104     LNFT135.0014,040.00200.0020,800.00165.0017,160.00
           
  CONTRACTOR TOTAL   1,126,505.35 1,168,631.80 1,561,884.50