Proposal:H.015205.6
Parish:Ouachita
Description:MCMILLAN RD PED IMPR (W MON)
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, SIDEWALKS, AND RELATED WORK.
Estimated Construction Cost:$1,032,527.20
| Rank | License | Bidder | Construction Bid |
| 1 | 15099 | Amethyst Construction, Inc. | $813,720.85 |
| 2 | 30774 | Progressive Construction Co., LLC | $1,149,270.90 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Amethyst Construction, Inc. | - 2 - Progressive Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 0.77 | LUMP | 6,500.00 | 6,500.00 | 38,000.00 | 38,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 14,000.00 | 14,000.00 | 25,200.00 | 25,200.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 18 | SQYD | 35.00 | 630.00 | 77.50 | 1,395.00 | | 0004 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 10 | LNFT | 80.00 | 800.00 | 109.00 | 1,090.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 258.7 | SQYD | 30.00 | 7,761.00 | 40.00 | 10,348.00 | | 0006 | 202-03-00010 | Relocation (Ornamental Fence) | 1 | EACH | 4,000.00 | 4,000.00 | 2,500.00 | 2,500.00 | | 0007 | 202-03-38000 | Relocation of Sign | 2 | EACH | 350.00 | 700.00 | 305.00 | 610.00 | | 0008 | 203-04-00300 | Nonplastic Embankment (Stone) | 8 | CUYD | 275.00 | 2,200.00 | 150.00 | 1,200.00 | | 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 | 37,250.00 | 37,250.00 | | 0010 | 204-02-00100 | Temporary Hay Bales | 100 | EACH | 60.00 | 6,000.00 | 33.50 | 3,350.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 2,420 | LNFT | 4.50 | 10,890.00 | 4.50 | 10,890.00 | | 0012 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 5 | CUYD | 200.00 | 1,000.00 | 122.00 | 610.00 | | 0013 | 701-03-01002 | Storm Drain Pipe (15" RCP/RPVCP) | 8 | LNFT | 225.00 | 1,800.00 | 184.00 | 1,472.00 | | 0014 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 8 | LNFT | 250.00 | 2,000.00 | 201.00 | 1,608.00 | | 0015 | 701-05-01043 | Side Drain Pipe (18" RCP/RPVCP/CMP) | 48 | LNFT | 230.00 | 11,040.00 | 137.00 | 6,576.00 | | 0016 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 25 | LNFT | 295.00 | 7,375.00 | 234.00 | 5,850.00 | | 0017 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 6,500.00 | 13,000.00 | 7,000.00 | 14,000.00 | | 0018 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 2,000.00 | 2,000.00 | 6,500.00 | 6,500.00 | | 0019 | 706-01-00100 | Concrete Walk (4" Thick) | 1,285.3 | SQYD | 105.00 | 134,956.50 | 114.00 | 146,524.20 | | 0020 | 706-02-00200 | Concrete Drive (6" Thick) | 330.4 | SQYD | 125.00 | 41,300.00 | 153.00 | 50,551.20 | | 0021 | 706-04-00110 | Curb Ramps (Type 8) | 77.5 | SQYD | 200.00 | 15,500.00 | 400.00 | 31,000.00 | | 0022 | 707-03-00100 | Combination Concrete Curb and Gutter | 5 | LNFT | 250.00 | 1,250.00 | 301.00 | 1,505.00 | | 0023 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 179 | SQYD | 105.00 | 18,795.00 | 200.00 | 35,800.00 | | 0024 | 711-04-00100 | Geotextile Fabric | 186 | SQYD | 2.50 | 465.00 | 3.25 | 604.50 | | 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,000.00 | 12,000.00 | 65,000.00 | 65,000.00 | | 0026 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 564 | SQYD | 14.00 | 7,896.00 | 12.25 | 6,909.00 | | 0027 | 720-01-01020 | Erosion Control System (Slope Protection) (Type B) | 100 | SQYD | 5.00 | 500.00 | 3.00 | 300.00 | | 0028 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 50 | SQYD | 5.00 | 250.00 | 3.00 | 150.00 | | 0029 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 50 | SQYD | 5.00 | 250.00 | 3.00 | 150.00 | | 0030 | 726-01-00100 | Bedding Material | 10.2 | CUYD | 155.00 | 1,581.00 | 122.00 | 1,244.40 | | 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 20,000.00 | 20,000.00 | 110,000.00 | 110,000.00 | | 0032 | 735-01-00100 | Mailboxes | 4 | EACH | 25.00 | 100.00 | 1.25 | 5.00 | | 0033 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 400.00 | 1,600.00 | 488.00 | 1,952.00 | | 0034 | 739-01-00100 | Hydro-Seeding | 0.34 | ACRE | 11,000.00 | 3,740.00 | 13,400.00 | 4,556.00 | | 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | | 0036 | 802-01-00202 | Structural Excavation (Type) (Retaining Wall, Headwall) | 165 | CUYD | 50.00 | 8,250.00 | 38.00 | 6,270.00 | | 0037 | 802-03-00500 | Temporary Sheeting (Retaining Walls) | 800 | SQFT | 25.00 | 20,000.00 | 43.00 | 34,400.00 | | 0038 | 805-01-00600 | Class A1 Concrete (Retaining Wall) | 33 | CUYD | 3,200.00 | 105,600.00 | 3,500.00 | 115,500.00 | | 0039 | 805-01-00900 | Class A1 Concrete (Flume) | 1 | CUYD | 3,400.00 | 3,400.00 | 3,500.00 | 3,500.00 | | 0040 | 805-01-01000 | Class A1 Concrete (Headwalls) (Existing Pipe) | 39 | CUYD | 3,500.00 | 136,500.00 | 3,500.00 | 136,500.00 | | 0041 | 806-01-00100 | Deformed Reinforcing Steel | 3,928.1 | LB | 8.50 | 33,388.85 | 1.00 | 3,928.10 | | 0042 | 810-04-00100 | Hand Railing | 436 | LNFT | 135.00 | 58,860.00 | 279.00 | 121,644.00 | | 0043 | NS-200-00120 | PMW Structural Excavation and Backfill | 1 | LUMP | 8,500.00 | 8,500.00 | 14,000.00 | 14,000.00 | | 0044 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 791 | INLF | 2.50 | 1,977.50 | 3.50 | 2,768.50 | | 0045 | NS-700-00100 | Trench Drains | 1 | EACH | 8,500.00 | 8,500.00 | 7,200.00 | 7,200.00 | | 0046 | NS-719-00002 | Tree Trimming | 1 | LUMP | 5,000.00 | 5,000.00 | 6,100.00 | 6,100.00 | | 0047 | TS-MSC-20200 | Retaining Wall | 199 | LF | 135.00 | 26,865.00 | 240.00 | 47,760.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 813,720.85 | | 1,149,270.90 |
|