Proposal:H.015096.6
Parish:Evangeline, St. Landry
Routes:LA 29
Description:LA 29: LA 13 - LA 758
Type Construction:CLEARING AND GRUBBING, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, IN-PLACE CEMENT TREATED SUBGRADE, CLASS II BASE COURSE, LIME TREATMENT, IN-PLACE CEMENT TREATED BASE COURSE, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK.
Estimated Construction Cost:$8,624,113.37
| Rank | License | Bidder | Construction Bid |
| 1 | 34356 | Prairie Contractors LLC | $9,111,516.00 |
| 2 | 12312 | Gilchrist Construction Company, LLC | $9,678,557.80 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Prairie Contractors LLC | - 2 - Gilchrist Construction Company, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 6 | LUMP | 70,000.00 | 70,000.00 | 150,000.00 | 150,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 83 | SQYD | 50.00 | 4,150.00 | 70.00 | 5,810.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 3,620.9 | SQYD | 25.00 | 90,522.50 | 10.00 | 36,209.00 | | 0005 | 202-02-06020 | Removal of Concrete Box Culverts 5 - 8' x 8' RCB | 5 | EACH | 15,000.00 | 75,000.00 | 7,500.00 | 37,500.00 | | 0006 | 202-02-06040 | Removal of Concrete Box Headwall Remove from 5-8'x8'x68' RCB | 2 | EACH | 8,500.00 | 17,000.00 | 3,500.00 | 7,000.00 | | 0007 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 133.5 | LNFT | 20.00 | 2,670.00 | 80.00 | 10,680.00 | | 0008 | 202-02-06100 | Removal of Concrete Walks and Drives | 125 | SQYD | 130.00 | 16,250.00 | 100.00 | 12,500.00 | | 0009 | 203-01-00100 | General Excavation | 6,695 | CUYD | 20.00 | 133,900.00 | 27.00 | 180,765.00 | | 0010 | 203-02-00100 | Drainage Excavation | 3,689 | CUYD | 22.50 | 83,002.50 | 27.00 | 99,603.00 | | 0011 | 203-03-00100 | Embankment | 2,781 | CUYD | 42.50 | 118,192.50 | 85.00 | 236,385.00 | | 0012 | 203-07-00100 | Borrow (Vehicular Measurement) | 6,771 | CUYD | 30.00 | 203,130.00 | 40.00 | 270,840.00 | | 0013 | 204-02-00100 | Temporary Hay Bales | 364 | EACH | 20.00 | 7,280.00 | 22.00 | 8,008.00 | | 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 51 | EACH | 120.00 | 6,120.00 | 125.00 | 6,375.00 | | 0015 | 204-06-00100 | Temporary Silt Fencing | 3,179 | LNFT | 2.05 | 6,516.95 | 3.00 | 9,537.00 | | 0016 | 302-02-12010 | Class II Base Course (12" Thick) (Soil Cement) | 4,493 | SQYD | 40.00 | 179,720.00 | 38.00 | 170,734.00 | | 0017 | 303-02-00100 | Removal of Existing Patches | 100 | SQYD | 83.00 | 8,300.00 | 50.00 | 5,000.00 | | 0018 | 303-03-00400 | In-Place Cement Treated Base Course (12" Thick) | 20,932.4 | SQYD | 18.00 | 376,783.20 | 20.00 | 418,648.00 | | 0019 | 304-01-00100 | Lime | 123.64 | TON | 450.00 | 55,638.00 | 450.00 | 55,638.00 | | 0020 | 304-03-00300 | Lime Treatment (Type C) (10" Thick) | 10,914 | SQYD | 10.00 | 109,140.00 | 20.00 | 218,280.00 | | 0021 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | 4,493 | SQYD | 15.00 | 67,395.00 | 20.00 | 89,860.00 | | 0022 | 309-01-10000 | In-Place Cement Treated Subgrade (10" Thick) | 20,933 | SQYD | 14.00 | 293,062.00 | 15.00 | 313,995.00 | | 0023 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 742 | CUYD | 48.00 | 35,616.00 | 100.00 | 74,200.00 | | 0024 | 502-01-00100 | Asphalt Concrete | 21,076.9 | TON | 119.00 | 2,508,151.10 | 150.00 | 3,161,535.00 | | 0025 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,132.7 | TON | 68.50 | 77,589.95 | 150.00 | 169,905.00 | | 0026 | 509-01-00100 | Milling Asphalt Pavement | 74,321 | SQYD | 3.90 | 289,851.90 | 4.50 | 334,444.50 | | 0027 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -4,345 | CUYD | 0.01 | -43.45 | 1.00 | -4,345.00 | | 0028 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 1,992 | SQYD | 195.00 | 388,440.00 | 250.00 | 498,000.00 | | 0029 | 601-01-10000 | Portland Cement Concrete Pavement (Colored) (15" Thick) | 75 | SQYD | 325.00 | 24,375.00 | 225.00 | 16,875.00 | | 0030 | 701-01-01160 | Cross Drain Pipe (84" RCP) | 72 | LNFT | 2,500.00 | 180,000.00 | 960.00 | 69,120.00 | | 0031 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 526 | LNFT | 425.00 | 223,550.00 | 170.00 | 89,420.00 | | 0032 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 440 | LNFT | 450.00 | 198,000.00 | 235.00 | 103,400.00 | | 0033 | 701-02-01080 | Cross Drain Pipe Arch (48" Equiv. RCPA) | 176 | LNFT | 500.00 | 88,000.00 | 350.00 | 61,600.00 | | 0034 | 701-05-01068 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW/CPPPDW) | 40 | LNFT | 325.00 | 13,000.00 | 135.00 | 5,400.00 | | 0035 | 701-05-01105 | Side Drain Pipe (36" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 24 | LNFT | 600.00 | 14,400.00 | 225.00 | 5,400.00 | | 0036 | 701-05-01126 | Side Drain Pipe (42" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) | 8 | LNFT | 850.00 | 6,800.00 | 275.00 | 2,200.00 | | 0037 | 701-05-02145 | Side Drain Pipe (Erosion) (48" RPVCP/CPEPDW/CPPPDW/CPPPTW) | 120 | LNFT | 450.00 | 54,000.00 | 300.00 | 36,000.00 | | 0038 | 701-05-02220 | Side Drain Pipe (Erosion) (84" CMP) | 30 | LNFT | 1,200.00 | 36,000.00 | 700.00 | 21,000.00 | | 0039 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 1,404 | LNFT | 11.00 | 15,444.00 | 4.00 | 5,616.00 | | 0040 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 4,000.00 | 4,000.00 | 6,000.00 | 6,000.00 | | 0041 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 16,000.00 | 16,000.00 | 12,500.00 | 12,500.00 | | 0042 | 702-07-00200 | Cross Drain Safety End (Type 2) | 2 | EACH | 28,000.00 | 56,000.00 | 31,000.00 | 62,000.00 | | 0043 | 702-08-00200 | Side Drain Safety End (Type 2) | 2 | EACH | 14,000.00 | 28,000.00 | 17,000.00 | 34,000.00 | | 0044 | 702-08-00300 | Side Drain Safety End (Type 3) | 1 | EACH | 28,000.00 | 28,000.00 | 38,000.00 | 38,000.00 | | 0045 | 706-02-00200 | Concrete Drive (6" Thick) | 80 | SQYD | 400.00 | 32,000.00 | 125.00 | 10,000.00 | | 0046 | 707-03-00100 | Combination Concrete Curb and Gutter | 127 | LNFT | 250.00 | 31,750.00 | 55.00 | 6,985.00 | | 0047 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 2,000.00 | 20,000.00 | 700.00 | 7,000.00 | | 0048 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 300.00 | 3,000.00 | 250.00 | 2,500.00 | | 0049 | 711-01-04020 | Riprap (55 lb, 24" Thick) | 328 | SQYD | 145.00 | 47,560.00 | 120.00 | 39,360.00 | | 0050 | 711-04-00100 | Geotextile Fabric | 328 | SQYD | 10.00 | 3,280.00 | 3.00 | 984.00 | | 0051 | 712-02-00100 | Sacked Concrete Revetment | 84 | SQYD | 900.00 | 75,600.00 | 300.00 | 25,200.00 | | 0052 | 712-04-00100 | Flexible Revetment | 490 | SQYD | 145.00 | 71,050.00 | 80.00 | 39,200.00 | | 0053 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 250,000.00 | 250,000.00 | 150,000.00 | 150,000.00 | | 0054 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 16.254 | MILE | 650.00 | 10,565.10 | 400.00 | 6,501.60 | | 0055 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 17.166 | MILE | 1.00 | 17.17 | 400.00 | 6,866.40 | | 0056 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 38.08 | MILE | 1.00 | 38.08 | 500.00 | 19,040.00 | | 0057 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 4,367 | SQYD | 2.20 | 9,607.40 | 2.00 | 8,734.00 | | 0058 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 645 | SQYD | 2.20 | 1,419.00 | 2.00 | 1,290.00 | | 0059 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 576 | SQYD | 2.20 | 1,267.20 | 2.00 | 1,152.00 | | 0060 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | | 0061 | 724-01-00100 | Rumble Strips (Centerline) | 4.511 | MILE | 1,200.00 | 5,413.20 | 1,000.00 | 4,511.00 | | 0062 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 9.021 | MILE | 1,200.00 | 10,825.20 | 1,000.00 | 9,021.00 | | 0063 | 726-01-00100 | Bedding Material | 331.9 | CUYD | 210.00 | 69,699.00 | 200.00 | 66,380.00 | | 0064 | 727-01-00100 | Mobilization | 1 | LUMP | 800,000.00 | 800,000.00 | 960,000.00 | 960,000.00 | | 0065 | 729-16-00200 | Object Marker Assembly (Type 2) | 24 | EACH | 80.00 | 1,920.00 | 70.00 | 1,680.00 | | 0066 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 150.00 | 600.00 | 135.00 | 540.00 | | 0067 | 731-02-00100 | Reflectorized Raised Pavement Markers | 911 | EACH | 7.00 | 6,377.00 | 5.00 | 4,555.00 | | 0068 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.737 | MILE | 6,500.00 | 82,790.50 | 4,500.00 | 57,316.50 | | 0069 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 5.744 | MILE | 4,000.00 | 22,976.00 | 1,450.00 | 8,328.80 | | 0070 | 735-01-00100 | Mailboxes | 55 | EACH | 10.00 | 550.00 | 1.00 | 55.00 | | 0071 | 735-02-00100 | Mailbox Supports (Single) | 55 | EACH | 335.00 | 18,425.00 | 270.00 | 14,850.00 | | 0072 | 739-01-00100 | Hydro-Seeding | 11.1 | ACRE | 3,500.00 | 38,850.00 | 3,000.00 | 33,300.00 | | 0073 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | 60,000.00 | 60,000.00 | | 0074 | 805-15-02100 | Reinforced Concrete Box Culverts (Precast) (8' x 8') | 340 | LNFT | 2,250.00 | 765,000.00 | 1,500.00 | 510,000.00 | | 0075 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Class A1 Concrete: 40.22 cy per end and Deformed Reinf. Steel: 6,702 pounds per end | 2 | EACH | 100,000.00 | 200,000.00 | 45,000.00 | 90,000.00 | | 0076 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,348 | INLF | 2.50 | 3,370.00 | 5.00 | 6,740.00 | | 0077 | NS-502-04200 | Reinforced Paving Mat for Asphalt Concrete Overlay | 13,149 | SQYD | 6.00 | 78,894.00 | 6.00 | 78,894.00 | | 0078 | NS-502-04210 | Asphalt Tack Coat | 3,156 | GAL | 6.25 | 19,725.00 | 6.00 | 18,936.00 | | 0079 | NS-719-00002 | Tree Trimming | 1 | LUMP | 45,000.00 | 45,000.00 | 183,000.00 | 183,000.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,111,516.00 | | 9,678,557.80 |
|