Proposal:H.014944.6
Parish:West Baton Rouge
Routes:LA 76
Description:LA 76: MULTI-USE PATH & SIDEWALKS, PH 1
Type Construction:CLEARING AND GRUBBING, GRADING, PRECAST CONCRETE PILES, SHARED USE PATH (ASPHALT), PEDESTRIAN BRIDGE AND RELATED WORK.
Estimated Construction Cost:$3,244,086.50
| Rank | License | Bidder | Construction Bid |
| 1 | 34263 | LA Contracting Enterprise, L.L.C. | $2,718,180.05 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $2,879,189.95 |
| 3 | 55505 | MERRICK, LLC | $2,880,669.25 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - LA Contracting Enterprise, L.L.C. | - 2 - Barber Bros. Contracting Co., L.L.C | - 3 - MERRICK, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 9,000.00 | 9,000.00 | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 12,000.00 | 12,000.00 | 20,000.00 | 20,000.00 | 13,000.00 | 13,000.00 | | 0003 | 202-02-00020 | Removal of Aggregate Material | 2,851 | SQYD | 11.00 | 31,361.00 | 9.00 | 25,659.00 | 7.00 | 19,957.00 | | 0004 | 202-02-02000 | Removal of Asphalt Drives | 1,387 | SQYD | 25.00 | 34,675.00 | 20.00 | 27,740.00 | 13.00 | 18,031.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 3,243 | SQYD | 20.00 | 64,860.00 | 25.00 | 81,075.00 | 13.00 | 42,159.00 | | 0006 | 202-02-06140 | Removal of Curbs (Concrete) | 74 | LNFT | 12.00 | 888.00 | 10.00 | 740.00 | 10.00 | 740.00 | | 0007 | 203-02-00100 | Drainage Excavation | 742 | CUYD | 17.00 | 12,614.00 | 45.00 | 33,390.00 | 30.00 | 22,260.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 353,000.00 | 353,000.00 | 325,000.00 | 325,000.00 | 213,000.00 | 213,000.00 | | 0009 | 204-06-00100 | Temporary Silt Fencing | 8,955 | LNFT | 2.25 | 20,148.75 | 2.25 | 20,148.75 | 3.25 | 29,103.75 | | 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 82 | CUYD | 207.00 | 16,974.00 | 130.00 | 10,660.00 | 185.00 | 15,170.00 | | 0011 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 619.7 | CUYD | 165.00 | 102,250.50 | 35.00 | 21,689.50 | 150.00 | 92,955.00 | | 0012 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,291.2 | TON | 258.00 | 333,129.60 | 215.00 | 277,608.00 | 245.00 | 316,344.00 | | 0013 | 701-03-02082 | Storm Drain Pipe (Outfall) (36" RPVCP or 42" CMP) | 124 | LNFT | 161.00 | 19,964.00 | 310.00 | 38,440.00 | 160.00 | 19,840.00 | | 0014 | 701-07-00200 | Yard Drain Pipe (6") | 118 | LNFT | 37.00 | 4,366.00 | 70.00 | 8,260.00 | 30.00 | 3,540.00 | | 0015 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 7,700.00 | 7,700.00 | 8,000.00 | 8,000.00 | 7,000.00 | 7,000.00 | | 0016 | 705-05-00100 | Double Swinging Driveway Gates | 3 | DBGT | 2,650.00 | 7,950.00 | 7,000.00 | 21,000.00 | 3,200.00 | 9,600.00 | | 0017 | 706-01-00100 | Concrete Walk (4" Thick) | 4.2 | SQYD | 180.00 | 756.00 | 100.00 | 420.00 | 300.00 | 1,260.00 | | 0018 | 706-02-00200 | Concrete Drive (6" Thick) | 1,468.1 | SQYD | 84.00 | 123,320.40 | 100.00 | 146,810.00 | 125.00 | 183,512.50 | | 0019 | 706-04-00110 | Curb Ramps Type 3 | 81 | SQYD | 158.00 | 12,798.00 | 190.00 | 15,390.00 | 200.00 | 16,200.00 | | 0020 | 707-01-00100 | Concrete Curb | 36.2 | LNFT | 26.00 | 941.20 | 45.00 | 1,629.00 | 75.00 | 2,715.00 | | 0021 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 189 | SQYD | 112.00 | 21,168.00 | 200.00 | 37,800.00 | 105.00 | 19,845.00 | | 0022 | 711-04-00100 | Geotextile Fabric | 189 | SQYD | 5.00 | 945.00 | 6.00 | 1,134.00 | 4.00 | 756.00 | | 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 60,000.00 | 60,000.00 | 155,000.00 | 155,000.00 | 100,000.00 | 100,000.00 | | 0024 | 716-01-00100 | Mulch (Vegetative) | 5.3 | TON | 1,800.00 | 9,540.00 | 900.00 | 4,770.00 | 1,000.00 | 5,300.00 | | 0025 | 717-01-00100 | Seeding | 105 | LB | 55.00 | 5,775.00 | 11.00 | 1,155.00 | 29.00 | 3,045.00 | | 0026 | 718-01-00100 | Fertilizer | 3,495 | LB | 1.20 | 4,194.00 | 1.00 | 3,495.00 | 1.00 | 3,495.00 | | 0027 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 4 | SQYD | 120.00 | 480.00 | 100.00 | 400.00 | 60.00 | 240.00 | | 0028 | 720-01-02040 | Erosion Control System, Flexible (Channel Liner) (Type E) | 4 | SQYD | 178.00 | 712.00 | 100.00 | 400.00 | 60.00 | 240.00 | | 0029 | 726-01-00100 | Bedding Material | 34.4 | CUYD | 142.00 | 4,884.80 | 110.00 | 3,784.00 | 150.00 | 5,160.00 | | 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 209,000.00 | 209,000.00 | 285,000.00 | 285,000.00 | 280,000.00 | 280,000.00 | | 0031 | 729-01-00100 | Sign (Type A) | 80.1 | SQFT | 10.00 | 801.00 | 10.00 | 801.00 | 40.00 | 3,204.00 | | 0032 | 729-01-00103 | Sign (Type A)(Relocate) | 48.3 | SQFT | 6.00 | 289.80 | 6.00 | 289.80 | 40.00 | 1,932.00 | | 0033 | 729-02-00103 | Sign (Type B)(Relocate) | 17.5 | SQFT | 12.00 | 210.00 | 12.00 | 210.00 | 60.00 | 1,050.00 | | 0034 | 729-08-00200 | Mounting (3 1/2" Size Post) | 5 | EACH | 3,325.00 | 16,625.00 | 3,400.00 | 17,000.00 | 2,300.00 | 11,500.00 | | 0035 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 29 | EACH | 182.00 | 5,278.00 | 180.00 | 5,220.00 | 215.00 | 6,235.00 | | 0036 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 304 | LNFT | 4.50 | 1,368.00 | 4.70 | 1,428.80 | 6.00 | 1,824.00 | | 0037 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 10 | EACH | 333.00 | 3,330.00 | 345.00 | 3,450.00 | 625.00 | 6,250.00 | | 0038 | 735-01-00100 | Mailboxes | 9 | EACH | 151.00 | 1,359.00 | 175.00 | 1,575.00 | 100.00 | 900.00 | | 0039 | 735-02-00100 | Mailbox Supports (Single) | 9 | EACH | 91.00 | 819.00 | 100.00 | 900.00 | 300.00 | 2,700.00 | | 0040 | 737-05-00002 | Painted Curbs | 318 | LNFT | 5.00 | 1,590.00 | 5.00 | 1,590.00 | 4.00 | 1,272.00 | | 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 42,000.00 | 42,000.00 | 50,000.00 | 50,000.00 | 35,000.00 | 35,000.00 | | 0042 | 804-01-00200 | Precast Concrete Piles (14") | 200 | LNFT | 282.00 | 56,400.00 | 275.00 | 55,000.00 | 130.00 | 26,000.00 | | 0043 | 804-01-00300 | Precast Concrete Piles (16") | 600 | LNFT | 184.00 | 110,400.00 | 180.00 | 108,000.00 | 200.00 | 120,000.00 | | 0044 | 804-17-00100 | Construction Site Survey | 1 | LUMP | 17,500.00 | 17,500.00 | 18,000.00 | 18,000.00 | 13,000.00 | 13,000.00 | | 0045 | 804-18-00100 | Vibration Monitoring | 8 | DAY | 750.00 | 6,000.00 | 1,000.00 | 8,000.00 | 1,200.00 | 9,600.00 | | 0046 | 805-01-00200 | Class A1 Concrete (Deck) | 22.22 | CUYD | 850.00 | 18,887.00 | 1,000.00 | 22,220.00 | 3,000.00 | 66,660.00 | | 0047 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 12.32 | CUYD | 3,200.00 | 39,424.00 | 3,900.00 | 48,048.00 | 5,000.00 | 61,600.00 | | 0048 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 568 | SQFT | 18.00 | 10,224.00 | 7.00 | 3,976.00 | 5.00 | 2,840.00 | | 0049 | 806-01-00100 | Deformed Reinforcing Steel | 7,069 | LB | 1.00 | 7,069.00 | 2.50 | 17,672.50 | 3.00 | 21,207.00 | | 0050 | 807-02-00100 | Structural Metalwork (Anchor Bolts) EST. 48lbs | 48 | LUMP | 1,700.00 | 1,700.00 | 1,700.00 | 1,700.00 | 5,000.00 | 5,000.00 | | 0051 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 277 | SQFT | 72.00 | 19,944.00 | 270.00 | 74,790.00 | 135.00 | 37,395.00 | | 0052 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 68 | LNFT | 530.00 | 36,040.00 | 250.00 | 17,000.00 | 435.00 | 29,580.00 | | 0053 | NS-502-05130 | Shared-Use Path (Asphalt Concrete) (6" Thick) | 9,540.8 | SQYD | 60.00 | 572,448.00 | 52.00 | 496,121.60 | 65.00 | 620,152.00 | | 0054 | NS-719-00003 | Root Pruning | 1 | LUMP | 4,500.00 | 4,500.00 | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 | | 0055 | TS-707-23060 | Wheel Stops | 53 | EACH | 143.00 | 7,579.00 | 200.00 | 10,600.00 | 100.00 | 5,300.00 | | 0056 | TS-800-00100 | Pedestrian Bridge Half Through Truss | 1 | LUMP | 234,000.00 | 234,000.00 | 275,000.00 | 275,000.00 | 275,000.00 | 275,000.00 | | 0057 | TS-800-00300 | Handrail | 40 | LNFT | 425.00 | 17,000.00 | 500.00 | 20,000.00 | 400.00 | 16,000.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,718,180.05 | | 2,879,189.95 | | 2,880,669.25 |
|