Proposal:H.014219.6
Parish:Bienville, Lincoln
Routes:LA 507
Description:LA 507: CREEK BRIDGES NEAR SIMSBORO
Type Construction:CLEARING AND GRUBBING, REMOVAL OF BRIDGES, GRADING, DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGE, PCC PILES AND RELATED WORK.
Estimated Construction Cost:$6,045,253.54
| Rank | License | Bidder | Construction Bid |
| 1 | 56994 | Matt L. Guinn Construction, LLC | $5,600,383.10 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $5,713,527.45 |
| 3 | 40615 | SPECIALTY TRACKHOE & DOZER SERV.INC | $5,715,487.00 |
| 4 | 55505 | MERRICK, LLC | $5,919,487.70 |
| 5 | 39462 | JB JAMES CONSTRUCTION LLC | $6,030,690.05 |
| 6 | 49239 | WL Bass Construction Inc. | $6,314,262.70 |
| 7 | 01516 | Elevate Heavy Civil Construction, LLC | $6,488,000.68 |
| 8 | 00044 | Guinn Construction, LLC | $6,499,747.50 |
| 9 | 12312 | Gilchrist Construction Company, LLC | $6,819,655.95 |
| 10 | 14788 | Louisiana Bridge, Inc. | $7,012,629.20 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Matt L. Guinn Construction, LLC | - 2 - Diamond B Construction Co., L.L.C. | - 3 - SPECIALTY TRACKHOE & DOZER SERV.INC | - 4 - MERRICK, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3.94 | LUMP | 110,000.00 | 110,000.00 | 92,000.00 | 92,000.00 | 100,000.00 | 100,000.00 | 150,000.00 | 150,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 40,000.00 | 40,000.00 | 75,000.00 | 75,000.00 | 40,000.00 | 40,000.00 | 20,000.00 | 20,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 35 | SQYD | 20.00 | 700.00 | 100.00 | 3,500.00 | 34.00 | 1,190.00 | 10.00 | 350.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 7,173.1 | SQYD | 10.00 | 71,731.00 | 8.00 | 57,384.80 | 12.00 | 86,077.20 | 9.00 | 64,557.90 | | 0005 | 202-02-04501 | Removal of Bridge Removal of Bridge Recal No. 022388 | 494 | LUMP | 20,000.00 | 20,000.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | 13,000.00 | 13,000.00 | | 0006 | 202-02-04501 | Removal of Bridge Removal of Bridge Recall No. 0022360 | 1,482 | LUMP | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | | 0007 | 202-02-12000 | Removal of Fence | 840 | LNFT | 3.00 | 2,520.00 | 6.00 | 5,040.00 | 11.50 | 9,660.00 | 5.00 | 4,200.00 | | 0008 | 202-02-14500 | Removal of Guard Rail | 1,008.5 | LNFT | 10.00 | 10,085.00 | 22.00 | 22,187.00 | 20.00 | 20,170.00 | 12.00 | 12,102.00 | | 0009 | 202-02-32100 | Removal of Pipe (Cross Drain) Site 1 | 216 | LNFT | 70.00 | 15,120.00 | 33.00 | 7,128.00 | 75.00 | 16,200.00 | 100.00 | 21,600.00 | | 0010 | 202-02-32100 | Removal of Pipe (Cross Drain) Site 2 | 97 | LNFT | 70.00 | 6,790.00 | 70.00 | 6,790.00 | 175.00 | 16,975.00 | 100.00 | 9,700.00 | | 0011 | 203-02-00100 | Drainage Excavation | 3,400 | CUYD | 24.00 | 81,600.00 | 12.50 | 42,500.00 | 15.00 | 51,000.00 | 20.00 | 68,000.00 | | 0012 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 47,000.00 | 47,000.00 | 65,000.00 | 65,000.00 | 175,000.00 | 175,000.00 | 210,000.00 | 210,000.00 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 10 | EACH | 400.00 | 4,000.00 | 130.00 | 1,300.00 | 200.00 | 2,000.00 | 200.00 | 2,000.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 4,959 | LNFT | 3.00 | 14,877.00 | 2.25 | 11,157.75 | 3.50 | 17,356.50 | 3.70 | 18,348.30 | | 0015 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 7,893.2 | SQYD | 82.50 | 651,189.00 | 38.00 | 299,941.60 | 43.00 | 339,407.60 | 40.00 | 315,728.00 | | 0016 | 302-03-00100 | Base Drain Outlet | 21 | EACH | 1,500.00 | 31,500.00 | 550.00 | 11,550.00 | 800.00 | 16,800.00 | 600.00 | 12,600.00 | | 0017 | 304-01-00100 | Lime | 55.96 | TON | 400.00 | 22,384.00 | 415.00 | 23,223.40 | 390.00 | 21,824.40 | 425.00 | 23,783.00 | | 0018 | 304-05-00100 | Lime Treatment (Type E) | 3,947 | SQYD | 10.00 | 39,470.00 | 7.75 | 30,589.25 | 7.00 | 27,629.00 | 3.00 | 11,841.00 | | 0019 | 401-01-00100 | Aggregate Surface Course (Net Section) | 25.7 | CUYD | 210.00 | 5,397.00 | 270.00 | 6,939.00 | 275.00 | 7,067.50 | 200.00 | 5,140.00 | | 0020 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 40 | CUYD | 175.00 | 7,000.00 | 190.00 | 7,600.00 | 195.00 | 7,800.00 | 150.00 | 6,000.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 1,671.5 | TON | 292.00 | 488,078.00 | 210.00 | 351,015.00 | 210.00 | 351,015.00 | 300.00 | 501,450.00 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 210.8 | TON | 380.00 | 80,104.00 | 329.00 | 69,353.20 | 218.00 | 45,954.40 | 450.00 | 94,860.00 | | 0023 | 510-01-00001 | Pavement Patching 14.5" Minimum Thickness | 164 | SQYD | 245.00 | 40,180.00 | 210.00 | 34,440.00 | 202.00 | 33,128.00 | 275.00 | 45,100.00 | | 0024 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 168 | LNFT | 140.00 | 23,520.00 | 120.00 | 20,160.00 | 95.00 | 15,960.00 | 150.00 | 25,200.00 | | 0025 | 701-04-02020 | Storm Drain Pipe Arch (Outfall) (18" Equiv. CMPA) | 48 | LNFT | 90.00 | 4,320.00 | 180.00 | 8,640.00 | 90.00 | 4,320.00 | 155.00 | 7,440.00 | | 0026 | 701-05-02044 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CPPPDW/CMP) | 120 | LNFT | 58.00 | 6,960.00 | 130.00 | 15,600.00 | 97.00 | 11,640.00 | 120.00 | 14,400.00 | | 0027 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 252 | LNFT | 100.00 | 25,200.00 | 130.00 | 32,760.00 | 95.00 | 23,940.00 | 160.00 | 40,320.00 | | 0028 | 701-06-02020 | Side Drain Pipe Arch (Erosion) (18" CMPA) | 226 | LNFT | 100.00 | 22,600.00 | 130.00 | 29,380.00 | 100.00 | 22,600.00 | 165.00 | 37,290.00 | | 0029 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 3,000.00 | 3,000.00 | 28,000.00 | 28,000.00 | 10,000.00 | 10,000.00 | 6,000.00 | 6,000.00 | | 0030 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 7,000.00 | 21,000.00 | 6,000.00 | 18,000.00 | 7,500.00 | 22,500.00 | 7,000.00 | 21,000.00 | | 0031 | 702-08-00100 | Side Drain Safety End (Type 1) | 4 | EACH | 3,000.00 | 12,000.00 | 1,700.00 | 6,800.00 | 3,300.00 | 13,200.00 | 5,000.00 | 20,000.00 | | 0032 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 537.7 | LNFT | 55.00 | 29,573.50 | 53.00 | 28,498.10 | 38.00 | 20,432.60 | 45.00 | 24,196.50 | | 0033 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 407.4 | LNFT | 110.00 | 44,814.00 | 105.00 | 42,777.00 | 168.00 | 68,443.20 | 145.00 | 59,073.00 | | 0034 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 2 | EACH | 3,800.00 | 7,600.00 | 3,800.00 | 7,600.00 | 4,000.00 | 8,000.00 | 4,200.00 | 8,400.00 | | 0035 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 10 | EACH | 4,150.00 | 41,500.00 | 4,100.00 | 41,000.00 | 4,000.00 | 40,000.00 | 4,100.00 | 41,000.00 | | 0036 | 705-01-00100 | Barbed Wire Fence | 345 | LNFT | 15.00 | 5,175.00 | 15.00 | 5,175.00 | 15.00 | 5,175.00 | 13.00 | 4,485.00 | | 0037 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 477 | LNFT | 25.00 | 11,925.00 | 18.00 | 8,586.00 | 20.00 | 9,540.00 | 17.00 | 8,109.00 | | 0038 | 708-01-00100 | Right-of-Way Monument | 21 | EACH | 650.00 | 13,650.00 | 650.00 | 13,650.00 | 650.00 | 13,650.00 | 800.00 | 16,800.00 | | 0039 | 708-02-00100 | Right-of-Way Monument Witness Post | 21 | EACH | 250.00 | 5,250.00 | 200.00 | 4,200.00 | 200.00 | 4,200.00 | 250.00 | 5,250.00 | | 0040 | 711-01-02060 | Riprap (10 lb, 18" Thick) | 24 | SQYD | 120.00 | 2,880.00 | 290.00 | 6,960.00 | 150.00 | 3,600.00 | 100.00 | 2,400.00 | | 0041 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 2,239 | SQYD | 130.00 | 291,070.00 | 95.00 | 212,705.00 | 100.00 | 223,900.00 | 110.00 | 246,290.00 | | 0042 | 711-04-00100 | Geotextile Fabric | 2,239 | SQYD | 3.00 | 6,717.00 | 1.00 | 2,239.00 | 3.00 | 6,717.00 | 3.00 | 6,717.00 | | 0043 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 | 245,000.00 | 245,000.00 | 75,000.00 | 75,000.00 | 200,000.00 | 200,000.00 | | 0044 | 716-01-00100 | Mulch (Vegetative) | 5.1 | TON | 200.00 | 1,020.00 | 900.00 | 4,590.00 | 1,250.00 | 6,375.00 | 1,200.00 | 6,120.00 | | 0045 | 717-01-00100 | Seeding | 102 | LB | 50.00 | 5,100.00 | 14.00 | 1,428.00 | 25.00 | 2,550.00 | 30.00 | 3,060.00 | | 0046 | 718-01-00100 | Fertilizer | 3,370 | LB | 2.00 | 6,740.00 | 0.60 | 2,022.00 | 0.85 | 2,864.50 | 1.25 | 4,212.50 | | 0047 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 345 | SQYD | 7.00 | 2,415.00 | 2.00 | 690.00 | 4.25 | 1,466.25 | 2.50 | 862.50 | | 0048 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 35,000.00 | 35,000.00 | 16,500.00 | 16,500.00 | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | | 0049 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 1.676 | MILE | 4,500.00 | 7,542.00 | 1,550.00 | 2,597.80 | 1,500.00 | 2,514.00 | 3,000.00 | 5,028.00 | | 0050 | 726-01-00100 | Bedding Material | 294.6 | CUYD | 200.00 | 58,920.00 | 180.00 | 53,028.00 | 150.00 | 44,190.00 | 175.00 | 51,555.00 | | 0051 | 727-01-00100 | Mobilization | 1 | LUMP | 500,000.00 | 500,000.00 | 565,000.00 | 565,000.00 | 500,000.00 | 500,000.00 | 580,000.00 | 580,000.00 | | 0052 | 729-01-00100 | Sign (Type A) | 34.2 | SQFT | 55.00 | 1,881.00 | 95.00 | 3,249.00 | 55.00 | 1,881.00 | 46.00 | 1,573.20 | | 0053 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 140.00 | 2,240.00 | 135.00 | 2,160.00 | 125.00 | 2,000.00 | 110.00 | 1,760.00 | | 0054 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 8 | EACH | 175.00 | 1,400.00 | 335.00 | 2,680.00 | 180.00 | 1,440.00 | 110.00 | 880.00 | | 0055 | 731-02-00100 | Reflectorized Raised Pavement Markers | 132 | EACH | 10.00 | 1,320.00 | 7.00 | 924.00 | 7.00 | 924.00 | 8.00 | 1,056.00 | | 0056 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.921 | MILE | 8,000.00 | 15,368.00 | 5,500.00 | 10,565.50 | 5,500.00 | 10,565.50 | 6,600.00 | 12,678.60 | | 0057 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.195 | MILE | 4,000.00 | 780.00 | 3,100.00 | 604.50 | 3,000.00 | 585.00 | 3,500.00 | 682.50 | | 0058 | 735-01-00100 | Mailboxes | 2 | EACH | 100.00 | 200.00 | 1.00 | 2.00 | 100.00 | 200.00 | 325.00 | 650.00 | | 0059 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 400.00 | 800.00 | 500.00 | 1,000.00 | 250.00 | 500.00 | 325.00 | 650.00 | | 0060 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 115,000.00 | 115,000.00 | 65,000.00 | 65,000.00 | 100,000.00 | 100,000.00 | | 0061 | 804-01-00400 | Precast Concrete Piles (18") | 3,680 | LNFT | 160.00 | 588,800.00 | 180.00 | 662,400.00 | 200.00 | 736,000.00 | 165.00 | 607,200.00 | | 0062 | 805-01-00100 | Class A1 Concrete (Slab Span) | 319.9 | CUYD | 1,850.00 | 591,815.00 | 1,650.00 | 527,835.00 | 1,500.00 | 479,850.00 | 1,600.00 | 511,840.00 | | 0063 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 97.2 | CUYD | 2,750.00 | 267,300.00 | 3,100.00 | 301,320.00 | 2,600.00 | 252,720.00 | 2,800.00 | 272,160.00 | | 0064 | 805-15-01200 | Reinforced Concrete Box Culverts (Precast) (6' x 6') | 195 | LNFT | 703.00 | 137,085.00 | 1,600.00 | 312,000.00 | 1,400.00 | 273,000.00 | 1,330.00 | 259,350.00 | | 0065 | 805-15-02100 | Reinforced Concrete Box Culverts (Precast) (8' x 8') | 104 | LNFT | 1,108.00 | 115,232.00 | 2,300.00 | 239,200.00 | 2,100.00 | 218,400.00 | 1,800.00 | 187,200.00 | | 0066 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Site 2 | 2 | EACH | 60,750.00 | 121,500.00 | 62,000.00 | 124,000.00 | 97,250.00 | 194,500.00 | 65,000.00 | 130,000.00 | | 0067 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Site 4 | 2 | EACH | 34,410.00 | 68,820.00 | 60,000.00 | 120,000.00 | 73,000.00 | 146,000.00 | 65,000.00 | 130,000.00 | | 0068 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,766 | SQFT | 2.50 | 6,915.00 | 3.00 | 8,298.00 | 3.00 | 8,298.00 | 3.50 | 9,681.00 | | 0069 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,766 | SQFT | 2.50 | 6,915.00 | 3.00 | 8,298.00 | 3.00 | 8,298.00 | 4.00 | 11,064.00 | | 0070 | 806-01-00100 | Deformed Reinforcing Steel | 76,342 | LB | 1.55 | 118,330.10 | 1.15 | 87,793.30 | 1.80 | 137,415.60 | 1.85 | 141,232.70 | | 0071 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 400 | LNFT | 200.00 | 80,000.00 | 235.00 | 94,000.00 | 250.00 | 100,000.00 | 200.00 | 80,000.00 | | 0072 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,560 | SQFT | 105.00 | 268,800.00 | 100.00 | 256,000.00 | 160.00 | 409,600.00 | 113.00 | 289,280.00 | | 0073 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 250 | SFIN | 125.00 | 31,250.00 | 265.00 | 66,250.00 | 140.00 | 35,000.00 | 200.00 | 50,000.00 | | 0074 | 815-03-00300 | Joint Seal (Poured) | 384 | LNFT | 20.00 | 7,680.00 | 38.00 | 14,592.00 | 20.00 | 7,680.00 | 16.00 | 6,144.00 | | 0075 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 384 | LNFT | 10.00 | 3,840.00 | 10.00 | 3,840.00 | 20.00 | 7,680.00 | 14.00 | 5,376.00 | | 0076 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 512 | LNFT | 4.00 | 2,048.00 | 5.00 | 2,560.00 | 4.00 | 2,048.00 | 3.00 | 1,536.00 | | 0077 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,385 | INLF | 3.50 | 4,847.50 | 1.25 | 1,731.25 | 1.35 | 1,869.75 | 5.00 | 6,925.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,600,383.10 | | 5,713,527.45 | | 5,715,487.00 | | 5,919,487.70 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - JB JAMES CONSTRUCTION LLC | - 6 - WL Bass Construction Inc. | - 7 - Elevate Heavy Civil Construction, LLC | - 8 - Guinn Construction, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3.94 | LUMP | 325,000.00 | 325,000.00 | 275,000.00 | 275,000.00 | 140,000.00 | 140,000.00 | 140,000.00 | 140,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 52,500.00 | 52,500.00 | 12,000.00 | 12,000.00 | 55,000.00 | 55,000.00 | 40,000.00 | 40,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 35 | SQYD | 70.00 | 2,450.00 | 12.00 | 420.00 | 109.00 | 3,815.00 | 10.00 | 350.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 7,173.1 | SQYD | 13.00 | 93,250.30 | 10.00 | 71,731.00 | 13.00 | 93,250.30 | 15.00 | 107,596.50 | | 0005 | 202-02-04501 | Removal of Bridge Removal of Bridge Recal No. 022388 | 494 | LUMP | 80,000.00 | 80,000.00 | 80,000.00 | 80,000.00 | 100,000.00 | 100,000.00 | 12,500.00 | 12,500.00 | | 0006 | 202-02-04501 | Removal of Bridge Removal of Bridge Recall No. 0022360 | 1,482 | LUMP | 50,000.00 | 50,000.00 | 60,000.00 | 60,000.00 | 100,000.00 | 100,000.00 | 20,000.00 | 20,000.00 | | 0007 | 202-02-12000 | Removal of Fence | 840 | LNFT | 4.00 | 3,360.00 | 3.00 | 2,520.00 | 7.00 | 5,880.00 | 5.00 | 4,200.00 | | 0008 | 202-02-14500 | Removal of Guard Rail | 1,008.5 | LNFT | 7.00 | 7,059.50 | 10.00 | 10,085.00 | 7.00 | 7,059.50 | 10.00 | 10,085.00 | | 0009 | 202-02-32100 | Removal of Pipe (Cross Drain) Site 1 | 216 | LNFT | 60.00 | 12,960.00 | 60.00 | 12,960.00 | 75.00 | 16,200.00 | 95.00 | 20,520.00 | | 0010 | 202-02-32100 | Removal of Pipe (Cross Drain) Site 2 | 97 | LNFT | 110.00 | 10,670.00 | 70.00 | 6,790.00 | 100.00 | 9,700.00 | 200.00 | 19,400.00 | | 0011 | 203-02-00100 | Drainage Excavation | 3,400 | CUYD | 30.00 | 102,000.00 | 22.00 | 74,800.00 | 19.00 | 64,600.00 | 30.00 | 102,000.00 | | 0012 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 200,000.00 | 200,000.00 | 213,500.00 | 213,500.00 | 143,000.00 | 143,000.00 | 110,000.00 | 110,000.00 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 10 | EACH | 165.00 | 1,650.00 | 170.00 | 1,700.00 | 165.00 | 1,650.00 | 500.00 | 5,000.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 4,959 | LNFT | 5.00 | 24,795.00 | 3.00 | 14,877.00 | 2.00 | 9,918.00 | 3.00 | 14,877.00 | | 0015 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 7,893.2 | SQYD | 50.00 | 394,660.00 | 55.00 | 434,126.00 | 53.00 | 418,339.60 | 35.00 | 276,262.00 | | 0016 | 302-03-00100 | Base Drain Outlet | 21 | EACH | 850.00 | 17,850.00 | 3,000.00 | 63,000.00 | 700.00 | 14,700.00 | 2,000.00 | 42,000.00 | | 0017 | 304-01-00100 | Lime | 55.96 | TON | 300.00 | 16,788.00 | 380.00 | 21,264.80 | 550.00 | 30,778.00 | 500.00 | 27,980.00 | | 0018 | 304-05-00100 | Lime Treatment (Type E) | 3,947 | SQYD | 6.00 | 23,682.00 | 9.00 | 35,523.00 | 5.00 | 19,735.00 | 18.00 | 71,046.00 | | 0019 | 401-01-00100 | Aggregate Surface Course (Net Section) | 25.7 | CUYD | 350.00 | 8,995.00 | 220.00 | 5,654.00 | 250.00 | 6,425.00 | 350.00 | 8,995.00 | | 0020 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 40 | CUYD | 250.00 | 10,000.00 | 140.00 | 5,600.00 | 225.00 | 9,000.00 | 100.00 | 4,000.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 1,671.5 | TON | 275.00 | 459,662.50 | 275.00 | 459,662.50 | 285.00 | 476,377.50 | 325.00 | 543,237.50 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 210.8 | TON | 375.00 | 79,050.00 | 375.00 | 79,050.00 | 375.00 | 79,050.00 | 425.00 | 89,590.00 | | 0023 | 510-01-00001 | Pavement Patching 14.5" Minimum Thickness | 164 | SQYD | 240.00 | 39,360.00 | 260.00 | 42,640.00 | 240.00 | 39,360.00 | 350.00 | 57,400.00 | | 0024 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 168 | LNFT | 220.00 | 36,960.00 | 120.00 | 20,160.00 | 99.00 | 16,632.00 | 200.00 | 33,600.00 | | 0025 | 701-04-02020 | Storm Drain Pipe Arch (Outfall) (18" Equiv. CMPA) | 48 | LNFT | 260.00 | 12,480.00 | 120.00 | 5,760.00 | 127.00 | 6,096.00 | 235.00 | 11,280.00 | | 0026 | 701-05-02044 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CPPPDW/CMP) | 120 | LNFT | 150.00 | 18,000.00 | 120.00 | 14,400.00 | 78.00 | 9,360.00 | 125.00 | 15,000.00 | | 0027 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 252 | LNFT | 150.00 | 37,800.00 | 120.00 | 30,240.00 | 101.00 | 25,452.00 | 200.00 | 50,400.00 | | 0028 | 701-06-02020 | Side Drain Pipe Arch (Erosion) (18" CMPA) | 226 | LNFT | 200.00 | 45,200.00 | 140.00 | 31,640.00 | 118.00 | 26,668.00 | 235.00 | 53,110.00 | | 0029 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 12,000.00 | 12,000.00 | 14,500.00 | 14,500.00 | 11,500.00 | 11,500.00 | 6,000.00 | 6,000.00 | | 0030 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 9,000.00 | 27,000.00 | 6,000.00 | 18,000.00 | 8,850.00 | 26,550.00 | 6,500.00 | 19,500.00 | | 0031 | 702-08-00100 | Side Drain Safety End (Type 1) | 4 | EACH | 3,000.00 | 12,000.00 | 4,000.00 | 16,000.00 | 4,600.00 | 18,400.00 | 4,000.00 | 16,000.00 | | 0032 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 537.7 | LNFT | 29.50 | 15,862.15 | 53.00 | 28,498.10 | 30.00 | 16,131.00 | 65.00 | 34,950.50 | | 0033 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 407.4 | LNFT | 116.00 | 47,258.40 | 107.00 | 43,591.80 | 116.00 | 47,258.40 | 115.00 | 46,851.00 | | 0034 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 2 | EACH | 3,425.00 | 6,850.00 | 3,750.00 | 7,500.00 | 3,425.00 | 6,850.00 | 4,500.00 | 9,000.00 | | 0035 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 10 | EACH | 3,360.00 | 33,600.00 | 4,100.00 | 41,000.00 | 3,360.00 | 33,600.00 | 5,000.00 | 50,000.00 | | 0036 | 705-01-00100 | Barbed Wire Fence | 345 | LNFT | 12.00 | 4,140.00 | 12.00 | 4,140.00 | 12.00 | 4,140.00 | 25.00 | 8,625.00 | | 0037 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 477 | LNFT | 15.00 | 7,155.00 | 15.00 | 7,155.00 | 15.00 | 7,155.00 | 35.00 | 16,695.00 | | 0038 | 708-01-00100 | Right-of-Way Monument | 21 | EACH | 650.00 | 13,650.00 | 600.00 | 12,600.00 | 650.00 | 13,650.00 | 900.00 | 18,900.00 | | 0039 | 708-02-00100 | Right-of-Way Monument Witness Post | 21 | EACH | 200.00 | 4,200.00 | 200.00 | 4,200.00 | 200.00 | 4,200.00 | 400.00 | 8,400.00 | | 0040 | 711-01-02060 | Riprap (10 lb, 18" Thick) | 24 | SQYD | 250.00 | 6,000.00 | 125.00 | 3,000.00 | 260.00 | 6,240.00 | 200.00 | 4,800.00 | | 0041 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 2,239 | SQYD | 150.00 | 335,850.00 | 122.00 | 273,158.00 | 95.00 | 212,705.00 | 135.00 | 302,265.00 | | 0042 | 711-04-00100 | Geotextile Fabric | 2,239 | SQYD | 4.00 | 8,956.00 | 5.00 | 11,195.00 | 5.00 | 11,195.00 | 5.00 | 11,195.00 | | 0043 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | 209,000.00 | 209,000.00 | 107,000.00 | 107,000.00 | 110,000.00 | 110,000.00 | | 0044 | 716-01-00100 | Mulch (Vegetative) | 5.1 | TON | 1,000.00 | 5,100.00 | 1,000.00 | 5,100.00 | 1,000.00 | 5,100.00 | 3,000.00 | 15,300.00 | | 0045 | 717-01-00100 | Seeding | 102 | LB | 25.00 | 2,550.00 | 25.00 | 2,550.00 | 25.00 | 2,550.00 | 50.00 | 5,100.00 | | 0046 | 718-01-00100 | Fertilizer | 3,370 | LB | 1.00 | 3,370.00 | 1.00 | 3,370.00 | 1.00 | 3,370.00 | 1.00 | 3,370.00 | | 0047 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 345 | SQYD | 2.00 | 690.00 | 3.00 | 1,035.00 | 2.00 | 690.00 | 10.00 | 3,450.00 | | 0048 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 40,000.00 | 40,000.00 | 18,000.00 | 18,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | | 0049 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 1.676 | MILE | 1,500.00 | 2,514.00 | 500.00 | 838.00 | 496.00 | 831.30 | 1,500.00 | 2,514.00 | | 0050 | 726-01-00100 | Bedding Material | 294.6 | CUYD | 160.00 | 47,136.00 | 200.00 | 58,920.00 | 94.00 | 27,692.40 | 150.00 | 44,190.00 | | 0051 | 727-01-00100 | Mobilization | 1 | LUMP | 600,000.00 | 600,000.00 | 631,400.00 | 631,400.00 | 648,000.00 | 648,000.00 | 635,000.00 | 635,000.00 | | 0052 | 729-01-00100 | Sign (Type A) | 34.2 | SQFT | 45.00 | 1,539.00 | 50.00 | 1,710.00 | 35.00 | 1,197.00 | 75.00 | 2,565.00 | | 0053 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 85.00 | 1,360.00 | 135.00 | 2,160.00 | 85.00 | 1,360.00 | 150.00 | 2,400.00 | | 0054 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 8 | EACH | 125.00 | 1,000.00 | 175.00 | 1,400.00 | 85.00 | 680.00 | 250.00 | 2,000.00 | | 0055 | 731-02-00100 | Reflectorized Raised Pavement Markers | 132 | EACH | 7.00 | 924.00 | 7.00 | 924.00 | 7.00 | 924.00 | 15.00 | 1,980.00 | | 0056 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.921 | MILE | 5,500.00 | 10,565.50 | 5,500.00 | 10,565.50 | 5,498.00 | 10,561.66 | 8,500.00 | 16,328.50 | | 0057 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.195 | MILE | 3,100.00 | 604.50 | 3,000.00 | 585.00 | 3,077.00 | 600.02 | 6,000.00 | 1,170.00 | | 0058 | 735-01-00100 | Mailboxes | 2 | EACH | 25.00 | 50.00 | 25.00 | 50.00 | 25.00 | 50.00 | 150.00 | 300.00 | | 0059 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 250.00 | 500.00 | 250.00 | 500.00 | 250.00 | 500.00 | 150.00 | 300.00 | | 0060 | 740-01-00100 | Construction Layout | 1 | LUMP | 120,000.00 | 120,000.00 | 100,000.00 | 100,000.00 | 38,904.00 | 38,904.00 | 60,000.00 | 60,000.00 | | 0061 | 804-01-00400 | Precast Concrete Piles (18") | 3,680 | LNFT | 180.00 | 662,400.00 | 180.00 | 662,400.00 | 200.00 | 736,000.00 | 185.00 | 680,800.00 | | 0062 | 805-01-00100 | Class A1 Concrete (Slab Span) | 319.9 | CUYD | 1,200.00 | 383,880.00 | 350.00 | 111,965.00 | 1,600.00 | 511,840.00 | 2,250.00 | 719,775.00 | | 0063 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 97.2 | CUYD | 2,200.00 | 213,840.00 | 350.00 | 34,020.00 | 3,200.00 | 311,040.00 | 2,850.00 | 277,020.00 | | 0064 | 805-15-01200 | Reinforced Concrete Box Culverts (Precast) (6' x 6') | 195 | LNFT | 900.00 | 175,500.00 | 2,000.00 | 390,000.00 | 2,300.00 | 448,500.00 | 1,300.00 | 253,500.00 | | 0065 | 805-15-02100 | Reinforced Concrete Box Culverts (Precast) (8' x 8') | 104 | LNFT | 1,300.00 | 135,200.00 | 2,200.00 | 228,800.00 | 2,300.00 | 239,200.00 | 2,000.00 | 208,000.00 | | 0066 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Site 2 | 2 | EACH | 42,000.00 | 84,000.00 | 80,000.00 | 160,000.00 | 65,000.00 | 130,000.00 | 70,000.00 | 140,000.00 | | 0067 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Site 4 | 2 | EACH | 30,000.00 | 60,000.00 | 88,000.00 | 176,000.00 | 67,000.00 | 134,000.00 | 75,000.00 | 150,000.00 | | 0068 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,766 | SQFT | 1.00 | 2,766.00 | 2.00 | 5,532.00 | 3.00 | 8,298.00 | 3.00 | 8,298.00 | | 0069 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,766 | SQFT | 2.00 | 5,532.00 | 2.00 | 5,532.00 | 4.00 | 11,064.00 | 3.00 | 8,298.00 | | 0070 | 806-01-00100 | Deformed Reinforcing Steel | 76,342 | LB | 1.60 | 122,147.20 | 4.00 | 305,368.00 | 2.00 | 152,684.00 | 1.75 | 133,598.50 | | 0071 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 400 | LNFT | 230.00 | 92,000.00 | 250.00 | 100,000.00 | 330.00 | 132,000.00 | 300.00 | 120,000.00 | | 0072 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,560 | SQFT | 120.00 | 307,200.00 | 180.00 | 460,800.00 | 150.00 | 384,000.00 | 125.00 | 320,000.00 | | 0073 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 250 | SFIN | 120.00 | 30,000.00 | 140.00 | 35,000.00 | 155.00 | 38,750.00 | 215.00 | 53,750.00 | | 0074 | 815-03-00300 | Joint Seal (Poured) | 384 | LNFT | 16.00 | 6,144.00 | 30.00 | 11,520.00 | 30.00 | 11,520.00 | 20.00 | 7,680.00 | | 0075 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 384 | LNFT | 16.00 | 6,144.00 | 20.00 | 7,680.00 | 16.00 | 6,144.00 | 40.00 | 15,360.00 | | 0076 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 512 | LNFT | 5.00 | 2,560.00 | 1.00 | 512.00 | 5.00 | 2,560.00 | 20.00 | 10,240.00 | | 0077 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,385 | INLF | 2.00 | 2,770.00 | 1.00 | 1,385.00 | 2.00 | 2,770.00 | 10.00 | 13,850.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,030,690.05 | | 6,314,262.70 | | 6,488,000.68 | | 6,499,747.50 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 9 - Gilchrist Construction Company, LLC | - 10 - Louisiana Bridge, Inc. | | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 3.94 | LUMP | 600,000.00 | 600,000.00 | 225,000.00 | 225,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 50,000.00 | 50,000.00 | 20,000.00 | 20,000.00 | | 0003 | 202-02-02000 | Removal of Asphalt Drives | 35 | SQYD | 125.00 | 4,375.00 | 400.00 | 14,000.00 | | 0004 | 202-02-03030 | Removal of Pavement Structure | 7,173.1 | SQYD | 14.00 | 100,423.40 | 12.00 | 86,077.20 | | 0005 | 202-02-04501 | Removal of Bridge Removal of Bridge Recal No. 022388 | 494 | LUMP | 50,000.00 | 50,000.00 | 78,000.00 | 78,000.00 | | 0006 | 202-02-04501 | Removal of Bridge Removal of Bridge Recall No. 0022360 | 1,482 | LUMP | 50,000.00 | 50,000.00 | 80,000.00 | 80,000.00 | | 0007 | 202-02-12000 | Removal of Fence | 840 | LNFT | 5.00 | 4,200.00 | 10.00 | 8,400.00 | | 0008 | 202-02-14500 | Removal of Guard Rail | 1,008.5 | LNFT | 8.00 | 8,068.00 | 12.00 | 12,102.00 | | 0009 | 202-02-32100 | Removal of Pipe (Cross Drain) Site 1 | 216 | LNFT | 205.00 | 44,280.00 | 40.00 | 8,640.00 | | 0010 | 202-02-32100 | Removal of Pipe (Cross Drain) Site 2 | 97 | LNFT | 225.00 | 21,825.00 | 52.00 | 5,044.00 | | 0011 | 203-02-00100 | Drainage Excavation | 3,400 | CUYD | 25.00 | 85,000.00 | 28.00 | 95,200.00 | | 0012 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 250,000.00 | 250,000.00 | 130,000.00 | 130,000.00 | | 0013 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 10 | EACH | 175.00 | 1,750.00 | 250.00 | 2,500.00 | | 0014 | 204-06-00100 | Temporary Silt Fencing | 4,959 | LNFT | 3.00 | 14,877.00 | 4.00 | 19,836.00 | | 0015 | 302-02-08520 | Class II Base Course (8-1/2" Thick) (Crushed Stone) | 7,893.2 | SQYD | 45.00 | 355,194.00 | 58.00 | 457,805.60 | | 0016 | 302-03-00100 | Base Drain Outlet | 21 | EACH | 2,000.00 | 42,000.00 | 750.00 | 15,750.00 | | 0017 | 304-01-00100 | Lime | 55.96 | TON | 400.00 | 22,384.00 | 600.00 | 33,576.00 | | 0018 | 304-05-00100 | Lime Treatment (Type E) | 3,947 | SQYD | 14.00 | 55,258.00 | 15.00 | 59,205.00 | | 0019 | 401-01-00100 | Aggregate Surface Course (Net Section) | 25.7 | CUYD | 150.00 | 3,855.00 | 150.00 | 3,855.00 | | 0020 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 40 | CUYD | 200.00 | 8,000.00 | 150.00 | 6,000.00 | | 0021 | 502-01-00100 | Asphalt Concrete | 1,671.5 | TON | 210.00 | 351,015.00 | 215.00 | 359,372.50 | | 0022 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 210.8 | TON | 400.00 | 84,320.00 | 215.00 | 45,322.00 | | 0023 | 510-01-00001 | Pavement Patching 14.5" Minimum Thickness | 164 | SQYD | 250.00 | 41,000.00 | 550.00 | 90,200.00 | | 0024 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 168 | LNFT | 225.00 | 37,800.00 | 150.00 | 25,200.00 | | 0025 | 701-04-02020 | Storm Drain Pipe Arch (Outfall) (18" Equiv. CMPA) | 48 | LNFT | 225.00 | 10,800.00 | 155.00 | 7,440.00 | | 0026 | 701-05-02044 | Side Drain Pipe (Erosion) (18" RPVCP/CPEPDW/CPPPDW/CMP) | 120 | LNFT | 165.00 | 19,800.00 | 150.00 | 18,000.00 | | 0027 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 252 | LNFT | 220.00 | 55,440.00 | 155.00 | 39,060.00 | | 0028 | 701-06-02020 | Side Drain Pipe Arch (Erosion) (18" CMPA) | 226 | LNFT | 240.00 | 54,240.00 | 175.00 | 39,550.00 | | 0029 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 15,000.00 | 15,000.00 | 10,200.00 | 10,200.00 | | 0030 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 10,000.00 | 30,000.00 | 7,400.00 | 22,200.00 | | 0031 | 702-08-00100 | Side Drain Safety End (Type 1) | 4 | EACH | 8,000.00 | 32,000.00 | 3,000.00 | 12,000.00 | | 0032 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 537.7 | LNFT | 31.00 | 16,668.70 | 61.00 | 32,799.70 | | 0033 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 407.4 | LNFT | 118.00 | 48,073.20 | 120.00 | 48,888.00 | | 0034 | 704-10-00120 | Guard Rail End Treatment, MASH, (TL-3 Flared) | 2 | EACH | 3,600.00 | 7,200.00 | 4,300.00 | 8,600.00 | | 0035 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 10 | EACH | 3,500.00 | 35,000.00 | 4,700.00 | 47,000.00 | | 0036 | 705-01-00100 | Barbed Wire Fence | 345 | LNFT | 14.00 | 4,830.00 | 20.00 | 6,900.00 | | 0037 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 477 | LNFT | 16.00 | 7,632.00 | 25.00 | 11,925.00 | | 0038 | 708-01-00100 | Right-of-Way Monument | 21 | EACH | 675.00 | 14,175.00 | 700.00 | 14,700.00 | | 0039 | 708-02-00100 | Right-of-Way Monument Witness Post | 21 | EACH | 225.00 | 4,725.00 | 300.00 | 6,300.00 | | 0040 | 711-01-02060 | Riprap (10 lb, 18" Thick) | 24 | SQYD | 180.00 | 4,320.00 | 200.00 | 4,800.00 | | 0041 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 2,239 | SQYD | 100.00 | 223,900.00 | 105.00 | 235,095.00 | | 0042 | 711-04-00100 | Geotextile Fabric | 2,239 | SQYD | 3.00 | 6,717.00 | 4.00 | 8,956.00 | | 0043 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 120,000.00 | 120,000.00 | | 0044 | 716-01-00100 | Mulch (Vegetative) | 5.1 | TON | 1,100.00 | 5,610.00 | 1,500.00 | 7,650.00 | | 0045 | 717-01-00100 | Seeding | 102 | LB | 26.00 | 2,652.00 | 30.00 | 3,060.00 | | 0046 | 718-01-00100 | Fertilizer | 3,370 | LB | 1.00 | 3,370.00 | 2.00 | 6,740.00 | | 0047 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 345 | SQYD | 2.25 | 776.25 | 8.00 | 2,760.00 | | 0048 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 5,000.00 | 5,000.00 | 35,000.00 | 35,000.00 | | 0049 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 1.676 | MILE | 1,500.00 | 2,514.00 | 2,900.00 | 4,860.40 | | 0050 | 726-01-00100 | Bedding Material | 294.6 | CUYD | 150.00 | 44,190.00 | 160.00 | 47,136.00 | | 0051 | 727-01-00100 | Mobilization | 1 | LUMP | 680,000.00 | 680,000.00 | 990,000.00 | 990,000.00 | | 0052 | 729-01-00100 | Sign (Type A) | 34.2 | SQFT | 37.00 | 1,265.40 | 60.00 | 2,052.00 | | 0053 | 729-16-00300 | Object Marker Assembly (Type 3) | 16 | EACH | 90.00 | 1,440.00 | 155.00 | 2,480.00 | | 0054 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 8 | EACH | 90.00 | 720.00 | 200.00 | 1,600.00 | | 0055 | 731-02-00100 | Reflectorized Raised Pavement Markers | 132 | EACH | 8.00 | 1,056.00 | 8.00 | 1,056.00 | | 0056 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.921 | MILE | 6,000.00 | 11,526.00 | 6,300.00 | 12,102.30 | | 0057 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.195 | MILE | 3,200.00 | 624.00 | 3,500.00 | 682.50 | | 0058 | 735-01-00100 | Mailboxes | 2 | EACH | 25.00 | 50.00 | 200.00 | 400.00 | | 0059 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 250.00 | 500.00 | 200.00 | 400.00 | | 0060 | 740-01-00100 | Construction Layout | 1 | LUMP | 100,000.00 | 100,000.00 | 105,000.00 | 105,000.00 | | 0061 | 804-01-00400 | Precast Concrete Piles (18") | 3,680 | LNFT | 200.00 | 736,000.00 | 210.00 | 772,800.00 | | 0062 | 805-01-00100 | Class A1 Concrete (Slab Span) | 319.9 | CUYD | 1,700.00 | 543,830.00 | 2,000.00 | 639,800.00 | | 0063 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 97.2 | CUYD | 2,200.00 | 213,840.00 | 2,900.00 | 281,880.00 | | 0064 | 805-15-01200 | Reinforced Concrete Box Culverts (Precast) (6' x 6') | 195 | LNFT | 1,250.00 | 243,750.00 | 1,350.00 | 263,250.00 | | 0065 | 805-15-02100 | Reinforced Concrete Box Culverts (Precast) (8' x 8') | 104 | LNFT | 1,700.00 | 176,800.00 | 1,980.00 | 205,920.00 | | 0066 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Site 2 | 2 | EACH | 75,000.00 | 150,000.00 | 104,000.00 | 208,000.00 | | 0067 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall Site 4 | 2 | EACH | 70,000.00 | 140,000.00 | 91,000.00 | 182,000.00 | | 0068 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,766 | SQFT | 3.00 | 8,298.00 | 4.00 | 11,064.00 | | 0069 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,766 | SQFT | 3.00 | 8,298.00 | 4.00 | 11,064.00 | | 0070 | 806-01-00100 | Deformed Reinforcing Steel | 76,342 | LB | 1.50 | 114,513.00 | 2.00 | 152,684.00 | | 0071 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 400 | LNFT | 340.00 | 136,000.00 | 200.00 | 80,000.00 | | 0072 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,560 | SQFT | 150.00 | 384,000.00 | 120.00 | 307,200.00 | | 0073 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 250 | SFIN | 110.00 | 27,500.00 | 270.00 | 67,500.00 | | 0074 | 815-03-00300 | Joint Seal (Poured) | 384 | LNFT | 40.00 | 15,360.00 | 28.00 | 10,752.00 | | 0075 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 384 | LNFT | 12.00 | 4,608.00 | 20.00 | 7,680.00 | | 0076 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 512 | LNFT | 25.00 | 12,800.00 | 11.00 | 5,632.00 | | 0077 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 1,385 | INLF | 12.00 | 16,620.00 | 5.00 | 6,925.00 | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 6,819,655.95 | | 7,012,629.20 |
|