Proposal:H.014065.6
Parish:Orleans
Routes:I-610
Description:I-610: ORLEANS P/L - FRANKLIN AVE
Type Construction:GRADING, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, EPOXY-URETHANE OVERLAY, TRAFFIC SIGNALIZATION, AND RELATED WORK.
Estimated Construction Cost:$8,178,479.05
| Rank | License | Bidder | Construction Bid |
| 1 | 73475 | Madden Gulf Coast, LLC | $9,522,008.00 |
| 2 | 06276 | Barriere Construction Co., LLC | $10,984,619.56 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $12,188,614.16 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Madden Gulf Coast, LLC | - 2 - Barriere Construction Co., LLC | - 3 - Boh Bros. Construction Co., LLC. | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-00030 | Removal of CONCRETE BRIDGE RAIL | 42 | LNFT | 50.00 | 2,100.00 | 50.00 | 2,100.00 | 300.00 | 12,600.00 | | 0002 | 202-02-00030 | Removal of ROADWAY BARRIER | 37 | LNFT | 50.00 | 1,850.00 | 50.00 | 1,850.00 | 300.00 | 11,100.00 | | 0003 | 202-02-02020 | Removal of Asphalt Pavement | 4,473.1 | SQYD | 20.00 | 89,462.00 | 35.47 | 158,660.86 | 70.00 | 313,117.00 | | 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 1,200.00 | 1,200.00 | 1,200.00 | 1,200.00 | 7,500.00 | 7,500.00 | | 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 24 | SQYD | 188.00 | 4,512.00 | 188.00 | 4,512.00 | 30.00 | 720.00 | | 0006 | 202-02-06102 | Removal of Incidental Concrete Paving | 1,125 | SQYD | 33.00 | 37,125.00 | 40.00 | 45,000.00 | 30.00 | 33,750.00 | | 0007 | 202-02-06120 | Removal of Curbs (Asphalt) | 550 | LNFT | 15.00 | 8,250.00 | 15.00 | 8,250.00 | 30.00 | 16,500.00 | | 0008 | 202-02-06140 | Removal of Curbs (Concrete) | 1,201 | LNFT | 18.00 | 21,618.00 | 18.00 | 21,618.00 | 30.00 | 36,030.00 | | 0009 | 202-02-12020 | Removal of Fence (Chain Link) | 1,085 | LNFT | 5.00 | 5,425.00 | 4.00 | 4,340.00 | 5.00 | 5,425.00 | | 0010 | 202-02-14500 | Removal of Guard Rail | 8,767.7 | LNFT | 8.00 | 70,141.60 | 14.00 | 122,747.80 | 15.00 | 131,515.50 | | 0011 | 203-01-00100 | General Excavation | 8 | CUYD | 350.00 | 2,800.00 | 50.00 | 400.00 | 500.00 | 4,000.00 | | 0012 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,108 | CUYD | 195.00 | 216,060.00 | 35.00 | 38,780.00 | 90.00 | 99,720.00 | | 0013 | 502-01-00100 | Asphalt Concrete | 7,383.5 | TON | 183.00 | 1,351,180.50 | 220.00 | 1,624,370.00 | 200.00 | 1,476,700.00 | | 0014 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,263 | TON | 300.00 | 378,900.00 | 375.00 | 473,625.00 | 375.00 | 473,625.00 | | 0015 | 502-04-00100 | Asphalt Concrete (SMA) Wearing Course | 8,664.7 | TON | 210.00 | 1,819,587.00 | 250.00 | 2,166,175.00 | 225.00 | 1,949,557.50 | | 0016 | 509-01-00100 | Milling Asphalt Pavement | 143,953 | SQYD | 5.50 | 791,741.50 | 7.00 | 1,007,671.00 | 6.00 | 863,718.00 | | 0017 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -7,891 | CUYD | 0.01 | -78.91 | 0.01 | -78.91 | 0.10 | -789.10 | | 0018 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 217 | SQYD | 245.00 | 53,165.00 | 190.00 | 41,230.00 | 275.00 | 59,675.00 | | 0019 | 510-01-00250 | Pavement Patching (14 inch Minimum Thickness) | 583 | SQYD | 170.00 | 99,110.00 | 195.00 | 113,685.00 | 300.00 | 174,900.00 | | 0020 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 3,474 | LNFT | 3.75 | 13,027.50 | 3.62 | 12,575.88 | 5.00 | 17,370.00 | | 0021 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 3,405 | LNFT | 4.25 | 14,471.25 | 3.62 | 12,326.10 | 5.00 | 17,025.00 | | 0022 | 602-03-00100 | Cleaning and Sealing Random Cracks | 300 | LNFT | 4.95 | 1,485.00 | 5.27 | 1,581.00 | 10.00 | 3,000.00 | | 0023 | 602-08-00100 | Diamond Grinding Concrete Pavement | 5,929.8 | SQYD | 15.75 | 93,394.35 | 16.00 | 94,876.80 | 15.00 | 88,947.00 | | 0024 | 602-16-00101 | High Early Strength (HES) Concrete Pavement Full Depth Patching 10" THICK | 281.3 | SQYD | 360.00 | 101,268.00 | 360.00 | 101,268.00 | 700.00 | 196,910.00 | | 0025 | 602-16-00101 | High Early Strength (HES) Concrete Pavement Full Depth Patching 9" THICK | 160.3 | SQYD | 355.00 | 56,906.50 | 355.00 | 56,906.50 | 700.00 | 112,210.00 | | 0026 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 5,800.00 | 5,800.00 | 5,800.00 | 5,800.00 | 7,500.00 | 7,500.00 | | 0027 | 702-03-00700 | Catch Basins (CB-08) | 1 | EACH | 13,000.00 | 13,000.00 | 13,000.00 | 13,000.00 | 35,000.00 | 35,000.00 | | 0028 | 702-04-00100 | Adjusting Manholes | 5 | EACH | 2,100.00 | 10,500.00 | 2,100.00 | 10,500.00 | 3,000.00 | 15,000.00 | | 0029 | 702-04-00200 | Adjusting Catch Basins | 3 | EACH | 2,800.00 | 8,400.00 | 2,800.00 | 8,400.00 | 5,000.00 | 15,000.00 | | 0030 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 7,457.1 | LNFT | 29.75 | 221,848.73 | 35.50 | 264,727.05 | 35.00 | 260,998.50 | | 0031 | 704-03-00205 | Blocked Out Guard Rail - 31", (18.75" Post Spacing) | 168.8 | LNFT | 75.00 | 12,660.00 | 76.00 | 12,828.80 | 80.00 | 13,504.00 | | 0032 | 704-05-00300 | Guard Rail Anchor Sections - 31", (Trailing End) | 168.3 | LNFT | 180.00 | 30,294.00 | 56.00 | 9,424.80 | 125.00 | 21,037.50 | | 0033 | 704-06-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 150.4 | LNFT | 40.00 | 6,016.00 | 51.00 | 7,670.40 | 80.00 | 12,032.00 | | 0034 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 675 | LNFT | 125.00 | 84,375.00 | 132.00 | 89,100.00 | 120.00 | 81,000.00 | | 0035 | 704-07-00300 | Guard Rail Transitions (Full Post to Quarter Post) | 50 | LNFT | 78.00 | 3,900.00 | 127.00 | 6,350.00 | 85.00 | 4,250.00 | | 0036 | 704-09-00100 | Guard Rail Anchor Block | 3 | EACH | 10,500.00 | 31,500.00 | 3,535.00 | 10,605.00 | 10,000.00 | 30,000.00 | | 0037 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 6 | EACH | 3,700.00 | 22,200.00 | 3,030.00 | 18,180.00 | 6,000.00 | 36,000.00 | | 0038 | 704-10-00305 | Guard Rail End Treatment, MASH, (TL-3 Bi-Directional) | 1 | EACH | 11,500.00 | 11,500.00 | 13,700.00 | 13,700.00 | 12,000.00 | 12,000.00 | | 0039 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 22 | EACH | 3,150.00 | 69,300.00 | 3,100.00 | 68,200.00 | 5,500.00 | 121,000.00 | | 0040 | 705-06-00200 | Chain Link Fence (5-Foot Height) | 1,105 | LNFT | 35.00 | 38,675.00 | 40.00 | 44,200.00 | 75.00 | 82,875.00 | | 0041 | 706-01-00100 | Concrete Walk (4" Thick) | 55.4 | SQYD | 142.00 | 7,866.80 | 142.00 | 7,866.80 | 225.00 | 12,465.00 | | 0042 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 230.2 | SQYD | 142.00 | 32,688.40 | 142.00 | 32,688.40 | 200.00 | 46,040.00 | | 0043 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 13.7 | SQYD | 155.00 | 2,123.50 | 155.00 | 2,123.50 | 225.00 | 3,082.50 | | 0044 | 706-04-00110 | Curb Ramps TYPE 3 | 64.8 | SQYD | 366.00 | 23,716.80 | 366.00 | 23,716.80 | 400.00 | 25,920.00 | | 0045 | 706-04-00110 | Curb Ramps TYPE 6 | 13.7 | SQYD | 366.00 | 5,014.20 | 366.00 | 5,014.20 | 400.00 | 5,480.00 | | 0046 | 706-04-00110 | Curb Ramps TYPE 7 | 39.9 | SQYD | 325.00 | 12,967.50 | 325.00 | 12,967.50 | 400.00 | 15,960.00 | | 0047 | 707-01-00100 | Concrete Curb | 1,834.5 | LNFT | 80.00 | 146,760.00 | 80.00 | 146,760.00 | 100.00 | 183,450.00 | | 0048 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,200,000.00 | 1,200,000.00 | 1,090,000.00 | 1,090,000.00 | 1,750,000.00 | 1,750,000.00 | | 0049 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 32,500 | LNFT | 0.35 | 11,375.00 | 0.35 | 11,375.00 | 0.50 | 16,250.00 | | 0050 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 2,946 | LNFT | 1.00 | 2,946.00 | 1.00 | 2,946.00 | 1.00 | 2,946.00 | | 0051 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 23.231 | MILE | 400.00 | 9,292.40 | 641.00 | 14,891.07 | 475.00 | 11,034.73 | | 0052 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 23.231 | MILE | 750.00 | 17,423.25 | 750.00 | 17,423.25 | 475.00 | 11,034.73 | | 0053 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 35.273 | MILE | 1,250.00 | 44,091.25 | 1,250.00 | 44,091.25 | 600.00 | 21,163.80 | | 0054 | 713-05-00200 | Temporary Pavement Legends & Symbols (Arrow - Double) | 14 | EACH | 50.00 | 700.00 | 50.00 | 700.00 | 50.00 | 700.00 | | 0055 | 713-05-00220 | Temporary Pavement Legends & Symbols (Arrow - Left Turn) | 8 | EACH | 50.00 | 400.00 | 50.00 | 400.00 | 50.00 | 400.00 | | 0056 | 713-05-00230 | Temporary Pavement Legends & Symbols (Arrow - Right Turn) | 8 | EACH | 50.00 | 400.00 | 50.00 | 400.00 | 50.00 | 400.00 | | 0057 | 716-01-00100 | Mulch (Vegetative) | 5.2 | TON | 850.00 | 4,420.00 | 850.00 | 4,420.00 | 1,200.00 | 6,240.00 | | 0058 | 717-01-00100 | Seeding | 151 | LB | 35.00 | 5,285.00 | 35.00 | 5,285.00 | 15.00 | 2,265.00 | | 0059 | 718-01-00100 | Fertilizer | 2,505 | LB | 0.85 | 2,129.25 | 0.85 | 2,129.25 | 1.50 | 3,757.50 | | 0060 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 6.714 | MILE | 1,000.00 | 6,714.00 | 290.00 | 1,947.06 | 500.00 | 3,357.00 | | 0061 | 726-01-00100 | Bedding Material | 5.6 | CUYD | 125.00 | 700.00 | 125.00 | 700.00 | 200.00 | 1,120.00 | | 0062 | 727-01-00100 | Mobilization | 1 | LUMP | 950,000.00 | 950,000.00 | 1,090,000.00 | 1,090,000.00 | 1,200,000.00 | 1,200,000.00 | | 0063 | 729-16-00300 | Object Marker Assembly (Type 3) | 68 | EACH | 85.00 | 5,780.00 | 96.00 | 6,528.00 | 125.00 | 8,500.00 | | 0064 | 731-02-00100 | Reflectorized Raised Pavement Markers | 15,651 | EACH | 6.00 | 93,906.00 | 6.00 | 93,906.00 | 5.00 | 78,255.00 | | 0065 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 16,250 | LNFT | 3.00 | 48,750.00 | 3.00 | 48,750.00 | 4.00 | 65,000.00 | | 0066 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 2,706 | LNFT | 16.00 | 43,296.00 | 16.00 | 43,296.00 | 15.00 | 40,590.00 | | 0067 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 572 | LNFT | 3.00 | 1,716.00 | 3.00 | 1,716.00 | 5.00 | 2,860.00 | | 0068 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 240 | LNFT | 16.00 | 3,840.00 | 16.00 | 3,840.00 | 17.00 | 4,080.00 | | 0069 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 25.27 | MILE | 4,750.00 | 120,032.50 | 4,750.00 | 120,032.50 | 5,000.00 | 126,350.00 | | 0070 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 6.39 | MILE | 1,500.00 | 9,585.00 | 1,500.00 | 9,585.00 | 1,500.00 | 9,585.00 | | 0071 | 732-03-02030 | Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.108 | MILE | 5,000.00 | 540.00 | 5,000.00 | 540.00 | 5,000.00 | 540.00 | | 0072 | 732-03-02040 | Plastic Pavement Striping (Dotted Line)(8" W)(3' L)(Thermo 90 mil) | 2.046 | MILE | 5,000.00 | 10,230.00 | 5,000.00 | 10,230.00 | 4,000.00 | 8,184.00 | | 0073 | 732-03-04001 | Plastic Pav't Striping (Broken) (7" Width) (Preformed Tape) (Retroreflectivity Level I) (Black and White Contrast) | 10.453 | MILE | 1,500.00 | 15,679.50 | 1,500.00 | 15,679.50 | 10,000.00 | 104,530.00 | | 0074 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 8 | EACH | 300.00 | 2,400.00 | 300.00 | 2,400.00 | 350.00 | 2,800.00 | | 0075 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 275.00 | 1,100.00 | 275.00 | 1,100.00 | 350.00 | 1,400.00 | | 0076 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 6 | EACH | 275.00 | 1,650.00 | 275.00 | 1,650.00 | 350.00 | 2,100.00 | | 0077 | 732-04-05040 | Plastic Pavement Legends and Symbols (EXIT ONLY) | 10 | EACH | 400.00 | 4,000.00 | 400.00 | 4,000.00 | 550.00 | 5,500.00 | | 0078 | 732-05-00100 | Removal of Existing Markings | 3.292 | MILE | 6,000.00 | 19,752.00 | 6,000.00 | 19,752.00 | 7,500.00 | 24,690.00 | | 0079 | 736-01-00100 | Trenching and Backfilling | 3 | LNFT | 12.57 | 37.71 | 13.00 | 39.00 | 50.00 | 150.00 | | 0080 | 736-09-00100 | Loop Detector | 39 | LNFT | 64.82 | 2,527.98 | 65.00 | 2,535.00 | 75.00 | 2,925.00 | | 0081 | 736-10-00200 | Underground Junction Box (Type E) | 1 | EACH | 1,329.63 | 1,329.63 | 1,330.00 | 1,330.00 | 2,000.00 | 2,000.00 | | 0082 | 736-11-00050 | Conduit (1/2" HDPE, Schedule 80) | 3 | LNFT | 9.47 | 28.41 | 10.00 | 30.00 | 50.00 | 150.00 | | 0083 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 557,000.00 | 557,000.00 | 520,000.00 | 520,000.00 | | 0084 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 55,791 | LNFT | 2.00 | 111,582.00 | 1.65 | 92,055.15 | 3.00 | 167,373.00 | | 0085 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 24,639 | LNFT | 2.00 | 49,278.00 | 1.65 | 40,654.35 | 3.00 | 73,917.00 | | 0086 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 80,430 | LNFT | 1.25 | 100,537.50 | 0.85 | 68,365.50 | 1.50 | 120,645.00 | | 0087 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 10,638 | INLF | 1.30 | 13,829.40 | 1.30 | 13,829.40 | 1.50 | 15,957.00 | | 0088 | NS-713-00009 | Portable Changeable Message Sign (with communications) | 4 | EACH | 14,000.00 | 56,000.00 | 40,000.00 | 160,000.00 | 20,000.00 | 80,000.00 | | 0089 | NS-830-00100 | Concrete Bridge Railing Repair and Rehabilitation | 42 | LNFT | 2,300.00 | 96,600.00 | 2,300.00 | 96,600.00 | 1,500.00 | 63,000.00 | | 0090 | NS-830-00600 | Pier Protection System Repair and Rehabilitation (Vehicular) | 37 | LNFT | 525.00 | 19,425.00 | 525.00 | 19,425.00 | 1,500.00 | 55,500.00 | | 0091 | NS-830-00900 | Epoxy-Urethane Overlay | 53,368 | SQFT | 6.50 | 346,892.00 | 6.25 | 333,550.00 | 8.00 | 426,944.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 9,522,008.00 | | 10,984,619.56 | | 12,188,614.16 |
|