Proposal:H.011992.6
Parish:Lafayette
Routes:LA 343
Description:LA 343: BAYOU QUEUE DE TORTUE BRIDGE
Type Construction:CLEARING AND GRUBBING, REMOVAL OF TIMBER TRESSLE BRIDGE, GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, ASPHALT CONCRETE PAVEMENT, PRECAST CONCRETE PILES, PRECAST-PRESTRESSED CONCRETE GIRDERS, SLAB SPAN BRIDGE, AND RELATED WORK.
Estimated Construction Cost:$3,587,023.60
| Rank | License | Bidder | Construction Bid |
| 1 | 55505 | MERRICK, LLC | $2,938,982.75 |
| 2 | 67770 | Reliant Industrial Solutions L.L.C. | $3,098,388.89 |
| 3 | 12312 | Gilchrist Construction Company, LLC | $3,170,470.10 |
| 4 | 00009 | Coastal Contractors, LLC | $3,319,417.46 |
| 5 | 01516 | Elevate Heavy Civil Construction, LLC | $3,324,747.37 |
| 6 | 00044 | Guinn Construction, LLC | $3,325,549.25 |
| 7 | 39462 | JB JAMES CONSTRUCTION LLC | $3,445,828.30 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - MERRICK, LLC | - 2 - Reliant Industrial Solutions L.L.C. | - 3 - Gilchrist Construction Company, LLC | - 4 - Coastal Contractors, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.025 | LUMP | 13,000.00 | 13,000.00 | 35,000.00 | 35,000.00 | 310,000.00 | 310,000.00 | 100,000.00 | 100,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 28,000.00 | 28,000.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 1,685.4 | SQYD | 10.00 | 16,854.00 | 17.90 | 30,168.66 | 15.00 | 25,281.00 | 20.00 | 33,708.00 | | 0004 | 202-02-04501 | Removal of Bridge Recall No. 006720, 25' x 96' Treated Timber Trestles w/Concrete Deck | 2,400 | LUMP | 180,000.00 | 180,000.00 | 67,500.00 | 67,500.00 | 91,250.00 | 91,250.00 | 150,000.00 | 150,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 541.6 | LNFT | 10.00 | 5,416.00 | 6.50 | 3,520.40 | 16.00 | 8,665.60 | 13.00 | 7,040.80 | | 0006 | 202-02-38200 | Removal of Signs | 13 | EACH | 100.00 | 1,300.00 | 80.00 | 1,040.00 | 240.00 | 3,120.00 | 13.00 | 169.00 | | 0007 | 203-02-00100 | Drainage Excavation | 1,389 | CUYD | 20.00 | 27,780.00 | 30.00 | 41,670.00 | 22.00 | 30,558.00 | 40.00 | 55,560.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 45,000.00 | 45,000.00 | 38,000.00 | 38,000.00 | 50,000.00 | 50,000.00 | 34,000.00 | 34,000.00 | | 0009 | 203-10-00100 | Cleaning Existing Ditches | 300 | LNFT | 15.00 | 4,500.00 | 18.80 | 5,640.00 | 40.00 | 12,000.00 | 34.00 | 10,200.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 180.00 | 720.00 | 175.00 | 700.00 | 160.00 | 640.00 | 190.00 | 760.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 1,080 | LNFT | 3.00 | 3,240.00 | 3.50 | 3,780.00 | 3.25 | 3,510.00 | 2.60 | 2,808.00 | | 0012 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 1,114.5 | SQYD | 66.00 | 73,557.00 | 83.75 | 93,339.38 | 60.00 | 66,870.00 | 85.00 | 94,732.50 | | 0013 | 304-01-00100 | Lime | 15.8 | TON | 480.00 | 7,584.00 | 370.00 | 5,846.00 | 420.00 | 6,636.00 | 340.00 | 5,372.00 | | 0014 | 304-05-00100 | Lime Treatment (Type E) (12" thick) | 1,115 | SQYD | 3.00 | 3,345.00 | 24.40 | 27,206.00 | 13.00 | 14,495.00 | 25.00 | 27,875.00 | | 0015 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 95.00 | 9,500.00 | 130.00 | 13,000.00 | 120.00 | 12,000.00 | 160.00 | 16,000.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 250.6 | TON | 235.00 | 58,891.00 | 219.00 | 54,881.40 | 250.00 | 62,650.00 | 225.00 | 56,385.00 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 105.3 | TON | 300.00 | 31,590.00 | 234.50 | 24,692.85 | 250.00 | 26,325.00 | 250.00 | 26,325.00 | | 0018 | 510-01-00001 | Pavement Patching 14.5" | 82 | SQYD | 250.00 | 20,500.00 | 374.00 | 30,668.00 | 250.00 | 20,500.00 | 350.00 | 28,700.00 | | 0019 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 252 | LNFT | 130.00 | 32,760.00 | 118.00 | 29,736.00 | 190.00 | 47,880.00 | 125.00 | 31,500.00 | | 0020 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 146 | LNFT | 150.00 | 21,900.00 | 140.00 | 20,440.00 | 225.00 | 32,850.00 | 165.00 | 24,090.00 | | 0021 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 196 | LNFT | 180.00 | 35,280.00 | 159.00 | 31,164.00 | 275.00 | 53,900.00 | 195.00 | 38,220.00 | | 0022 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 28 | LNFT | 130.00 | 3,640.00 | 190.00 | 5,320.00 | 210.00 | 5,880.00 | 140.00 | 3,920.00 | | 0023 | 701-03-02062 | Storm Drain Pipe (Outfall) (30" RPVCP or 36" CMP) | 16 | LNFT | 150.00 | 2,400.00 | 230.00 | 3,680.00 | 240.00 | 3,840.00 | 190.00 | 3,040.00 | | 0024 | 701-03-02082 | Storm Drain Pipe (Outfall) (36" RPVCP or 42" CMP) | 30 | LNFT | 190.00 | 5,700.00 | 253.00 | 7,590.00 | 295.00 | 8,850.00 | 225.00 | 6,750.00 | | 0025 | 702-03-00100 | Catch Basins (CB-01) | 5 | EACH | 6,500.00 | 32,500.00 | 8,300.00 | 41,500.00 | 10,000.00 | 50,000.00 | 7,200.00 | 36,000.00 | | 0026 | 702-08-00200 | Side Drain Safety End (Type 2) | 2 | EACH | 10,000.00 | 20,000.00 | 7,250.00 | 14,500.00 | 11,000.00 | 22,000.00 | 11,000.00 | 22,000.00 | | 0027 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 162.5 | LNFT | 25.00 | 4,062.50 | 22.00 | 3,575.00 | 21.00 | 3,412.50 | 25.00 | 4,062.50 | | 0028 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 115.00 | 11,500.00 | 88.00 | 8,800.00 | 82.00 | 8,200.00 | 90.00 | 9,000.00 | | 0029 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 4,000.00 | 4,000.00 | 5,225.00 | 5,225.00 | 3,600.00 | 3,600.00 | 4,000.00 | 4,000.00 | | 0030 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 3,900.00 | 11,700.00 | 4,000.00 | 12,000.00 | 3,300.00 | 9,900.00 | 4,000.00 | 12,000.00 | | 0031 | 712-04-00100 | Flexible Revetment | 574 | SQYD | 90.00 | 51,660.00 | 187.00 | 107,338.00 | 95.00 | 54,530.00 | 115.00 | 66,010.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | 48,500.00 | 48,500.00 | 75,000.00 | 75,000.00 | 30,000.00 | 30,000.00 | | 0033 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 22 | SQYD | 25.00 | 550.00 | 18.50 | 407.00 | 17.00 | 374.00 | 7.00 | 154.00 | | 0034 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 11 | SQYD | 45.00 | 495.00 | 36.00 | 396.00 | 34.00 | 374.00 | 20.00 | 220.00 | | 0035 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 13,000.00 | 13,000.00 | 20,500.00 | 20,500.00 | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 | | 0036 | 724-01-00100 | Rumble Strips (Centerline) | 0.061 | MILE | 700.00 | 42.70 | 550.00 | 33.55 | 1,000.00 | 61.00 | 500.00 | 30.50 | | 0037 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.12 | MILE | 700.00 | 84.00 | 550.00 | 66.00 | 1,000.00 | 120.00 | 500.00 | 60.00 | | 0038 | 726-01-00100 | Bedding Material | 81 | CUYD | 135.00 | 10,935.00 | 184.00 | 14,904.00 | 190.00 | 15,390.00 | 200.00 | 16,200.00 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 280,000.00 | 280,000.00 | 275,000.00 | 275,000.00 | 310,000.00 | 310,000.00 | 330,000.00 | 330,000.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 90.00 | 360.00 | 90.00 | 360.00 | 77.00 | 308.00 | 85.00 | 340.00 | | 0041 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 617 | EACH | 8.50 | 5,244.50 | 8.80 | 5,429.60 | 9.00 | 5,553.00 | 11.00 | 6,787.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 14 | EACH | 11.00 | 154.00 | 11.00 | 154.00 | 11.00 | 154.00 | 16.00 | 224.00 | | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.211 | MILE | 10,000.00 | 2,110.00 | 9,350.00 | 1,972.85 | 8,600.00 | 1,814.60 | 11,000.00 | 2,321.00 | | 0044 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.106 | MILE | 8,900.00 | 943.40 | 8,250.00 | 874.50 | 7,100.00 | 752.60 | 2,750.00 | 291.50 | | 0045 | 739-01-00100 | Hydro-Seeding | 0.479 | ACRE | 6,500.00 | 3,113.50 | 7,200.00 | 3,448.80 | 6,000.00 | 2,874.00 | 4,500.00 | 2,155.50 | | 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | 35,000.00 | 35,000.00 | 35,000.00 | 35,000.00 | | 0047 | 804-01-00600 | Precast Concrete Piles (24") | 2,040 | LNFT | 218.00 | 444,720.00 | 223.50 | 455,940.00 | 215.00 | 438,600.00 | 260.00 | 530,400.00 | | 0048 | 805-01-00200 | Class A1 Concrete (Deck) | 155.38 | CUYD | 2,500.00 | 388,450.00 | 3,200.00 | 497,216.00 | 2,000.00 | 310,760.00 | 2,200.00 | 341,836.00 | | 0049 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 105.61 | CUYD | 2,000.00 | 211,220.00 | 2,120.00 | 223,893.20 | 1,400.00 | 147,854.00 | 2,500.00 | 264,025.00 | | 0050 | 805-08-00100 | Precast-Prestressed Concrete Girders (Type Quad Beam) | 947 | LNFT | 225.00 | 213,075.00 | 237.00 | 224,439.00 | 200.00 | 189,400.00 | 245.00 | 232,015.00 | | 0051 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,190 | SQFT | 3.21 | 7,029.90 | 2.65 | 5,803.50 | 3.00 | 6,570.00 | 4.00 | 8,760.00 | | 0052 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,190 | SQFT | 4.00 | 8,760.00 | 3.15 | 6,898.50 | 3.00 | 6,570.00 | 4.50 | 9,855.00 | | 0053 | 806-01-00100 | Deformed Reinforcing Steel | 58,439 | LB | 1.75 | 102,268.25 | 1.35 | 78,892.65 | 1.20 | 70,126.80 | 1.44 | 84,152.16 | | 0054 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 46 | LUMP | 8,000.00 | 8,000.00 | 3,000.00 | 3,000.00 | 10,000.00 | 10,000.00 | 11,000.00 | 11,000.00 | | 0055 | 807-04-00100 | Structural Metalwork Miscellaneous | 128 | LUMP | 8,000.00 | 8,000.00 | 2,500.00 | 2,500.00 | 2,000.00 | 2,000.00 | 50,000.00 | 50,000.00 | | 0056 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 320 | LNFT | 150.00 | 48,000.00 | 223.00 | 71,360.00 | 225.00 | 72,000.00 | 240.00 | 76,800.00 | | 0057 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,560 | SQFT | 90.00 | 230,400.00 | 98.00 | 250,880.00 | 110.00 | 281,600.00 | 100.00 | 256,000.00 | | 0058 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 12 | SFIN | 150.00 | 1,800.00 | 171.50 | 2,058.00 | 100.00 | 1,200.00 | 240.00 | 2,880.00 | | 0059 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 60 | SFIN | 140.00 | 8,400.00 | 111.50 | 6,690.00 | 105.00 | 6,300.00 | 154.00 | 9,240.00 | | 0060 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 138 | LNFT | 520.00 | 71,760.00 | 392.00 | 54,096.00 | 450.00 | 62,100.00 | 370.00 | 51,060.00 | | 0061 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 13.00 | 2,496.00 | 20.00 | 3,840.00 | 20.00 | 3,840.00 | 16.00 | 3,072.00 | | 0062 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 320 | LNFT | 3.00 | 960.00 | 5.15 | 1,648.00 | 20.00 | 6,400.00 | 4.00 | 1,280.00 | | 0063 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 433 | INLF | 4.00 | 1,732.00 | 3.85 | 1,667.05 | 7.00 | 3,031.00 | 7.00 | 3,031.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,938,982.75 | | 3,098,388.89 | | 3,170,470.10 | | 3,319,417.46 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 5 - Elevate Heavy Civil Construction, LLC | - 6 - Guinn Construction, LLC | - 7 - JB JAMES CONSTRUCTION LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 201-01-00100 | Clearing and Grubbing | 1.025 | LUMP | 390,000.00 | 390,000.00 | 25,000.00 | 25,000.00 | 200,000.00 | 200,000.00 | | 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 26,500.00 | 26,500.00 | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 | | 0003 | 202-02-03030 | Removal of Pavement Structure | 1,685.4 | SQYD | 14.00 | 23,595.60 | 15.00 | 25,281.00 | 12.00 | 20,224.80 | | 0004 | 202-02-04501 | Removal of Bridge Recall No. 006720, 25' x 96' Treated Timber Trestles w/Concrete Deck | 2,400 | LUMP | 220,000.00 | 220,000.00 | 50,000.00 | 50,000.00 | 200,000.00 | 200,000.00 | | 0005 | 202-02-14500 | Removal of Guard Rail | 541.6 | LNFT | 10.00 | 5,416.00 | 10.00 | 5,416.00 | 15.00 | 8,124.00 | | 0006 | 202-02-38200 | Removal of Signs | 13 | EACH | 50.00 | 650.00 | 10.00 | 130.00 | 65.00 | 845.00 | | 0007 | 203-02-00100 | Drainage Excavation | 1,389 | CUYD | 18.00 | 25,002.00 | 30.00 | 41,670.00 | 30.00 | 41,670.00 | | 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 80,000.00 | 80,000.00 | 25,000.00 | 25,000.00 | 100,000.00 | 100,000.00 | | 0009 | 203-10-00100 | Cleaning Existing Ditches | 300 | LNFT | 15.00 | 4,500.00 | 10.00 | 3,000.00 | 35.00 | 10,500.00 | | 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 165.00 | 660.00 | 500.00 | 2,000.00 | 150.00 | 600.00 | | 0011 | 204-06-00100 | Temporary Silt Fencing | 1,080 | LNFT | 3.50 | 3,780.00 | 3.00 | 3,240.00 | 7.00 | 7,560.00 | | 0012 | 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 1,114.5 | SQYD | 65.00 | 72,442.50 | 85.00 | 94,732.50 | 65.00 | 72,442.50 | | 0013 | 304-01-00100 | Lime | 15.8 | TON | 350.00 | 5,530.00 | 500.00 | 7,900.00 | 300.00 | 4,740.00 | | 0014 | 304-05-00100 | Lime Treatment (Type E) (12" thick) | 1,115 | SQYD | 6.00 | 6,690.00 | 28.00 | 31,220.00 | 6.00 | 6,690.00 | | 0015 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 100 | CUYD | 180.00 | 18,000.00 | 50.00 | 5,000.00 | 190.00 | 19,000.00 | | 0016 | 502-01-00100 | Asphalt Concrete | 250.6 | TON | 225.00 | 56,385.00 | 325.00 | 81,445.00 | 225.00 | 56,385.00 | | 0017 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 105.3 | TON | 275.00 | 28,957.50 | 375.00 | 39,487.50 | 275.00 | 28,957.50 | | 0018 | 510-01-00001 | Pavement Patching 14.5" | 82 | SQYD | 235.00 | 19,270.00 | 335.00 | 27,470.00 | 235.00 | 19,270.00 | | 0019 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 252 | LNFT | 110.00 | 27,720.00 | 120.00 | 30,240.00 | 200.00 | 50,400.00 | | 0020 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 146 | LNFT | 115.00 | 16,790.00 | 175.00 | 25,550.00 | 240.00 | 35,040.00 | | 0021 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 196 | LNFT | 145.00 | 28,420.00 | 225.00 | 44,100.00 | 270.00 | 52,920.00 | | 0022 | 701-03-02042 | Storm Drain Pipe (Outfall) (24" RPVCP or 30" CMP) | 28 | LNFT | 110.00 | 3,080.00 | 120.00 | 3,360.00 | 250.00 | 7,000.00 | | 0023 | 701-03-02062 | Storm Drain Pipe (Outfall) (30" RPVCP or 36" CMP) | 16 | LNFT | 155.00 | 2,480.00 | 175.00 | 2,800.00 | 230.00 | 3,680.00 | | 0024 | 701-03-02082 | Storm Drain Pipe (Outfall) (36" RPVCP or 42" CMP) | 30 | LNFT | 155.00 | 4,650.00 | 225.00 | 6,750.00 | 330.00 | 9,900.00 | | 0025 | 702-03-00100 | Catch Basins (CB-01) | 5 | EACH | 6,000.00 | 30,000.00 | 5,000.00 | 25,000.00 | 8,000.00 | 40,000.00 | | 0026 | 702-08-00200 | Side Drain Safety End (Type 2) | 2 | EACH | 9,000.00 | 18,000.00 | 8,500.00 | 17,000.00 | 7,000.00 | 14,000.00 | | 0027 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 162.5 | LNFT | 30.00 | 4,875.00 | 30.00 | 4,875.00 | 20.00 | 3,250.00 | | 0028 | 704-07-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 117.00 | 11,700.00 | 125.00 | 12,500.00 | 80.00 | 8,000.00 | | 0029 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 1 | EACH | 3,400.00 | 3,400.00 | 5,000.00 | 5,000.00 | 3,500.00 | 3,500.00 | | 0030 | 704-10-00310 | Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) | 3 | EACH | 3,100.00 | 9,300.00 | 4,250.00 | 12,750.00 | 3,250.00 | 9,750.00 | | 0031 | 712-04-00100 | Flexible Revetment | 574 | SQYD | 80.00 | 45,920.00 | 110.00 | 63,140.00 | 150.00 | 86,100.00 | | 0032 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 22,500.00 | 22,500.00 | 70,000.00 | 70,000.00 | | 0033 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 22 | SQYD | 17.00 | 374.00 | 100.00 | 2,200.00 | 6.00 | 132.00 | | 0034 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 11 | SQYD | 34.00 | 374.00 | 100.00 | 1,100.00 | 15.00 | 165.00 | | 0035 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 35,000.00 | 35,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | | 0036 | 724-01-00100 | Rumble Strips (Centerline) | 0.061 | MILE | 500.00 | 30.50 | 2,000.00 | 122.00 | 10,000.00 | 610.00 | | 0037 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.12 | MILE | 500.00 | 60.00 | 2,000.00 | 240.00 | 10,000.00 | 1,200.00 | | 0038 | 726-01-00100 | Bedding Material | 81 | CUYD | 175.00 | 14,175.00 | 175.00 | 14,175.00 | 180.00 | 14,580.00 | | 0039 | 727-01-00100 | Mobilization | 1 | LUMP | 330,000.00 | 330,000.00 | 300,000.00 | 300,000.00 | 340,000.00 | 340,000.00 | | 0040 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 90.00 | 360.00 | 150.00 | 600.00 | 75.00 | 300.00 | | 0041 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 617 | EACH | 0.01 | 6.17 | 20.00 | 12,340.00 | 10.00 | 6,170.00 | | 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 14 | EACH | 10.00 | 140.00 | 25.00 | 350.00 | 15.00 | 210.00 | | 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.211 | MILE | 8,500.00 | 1,793.50 | 15,000.00 | 3,165.00 | 12,000.00 | 2,532.00 | | 0044 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.106 | MILE | 7,800.00 | 826.80 | 4,000.00 | 424.00 | 3,200.00 | 339.20 | | 0045 | 739-01-00100 | Hydro-Seeding | 0.479 | ACRE | 6,200.00 | 2,969.80 | 10,000.00 | 4,790.00 | 4,200.00 | 2,011.80 | | 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 60,000.00 | 60,000.00 | 25,000.00 | 25,000.00 | 60,000.00 | 60,000.00 | | 0047 | 804-01-00600 | Precast Concrete Piles (24") | 2,040 | LNFT | 220.00 | 448,800.00 | 275.00 | 561,000.00 | 300.00 | 612,000.00 | | 0048 | 805-01-00200 | Class A1 Concrete (Deck) | 155.38 | CUYD | 1,600.00 | 248,608.00 | 2,250.00 | 349,605.00 | 1,300.00 | 201,994.00 | | 0049 | 805-01-00300 | Class A1 Concrete (Bent Cap) | 105.61 | CUYD | 1,900.00 | 200,659.00 | 2,850.00 | 300,988.50 | 1,700.00 | 179,537.00 | | 0050 | 805-08-00100 | Precast-Prestressed Concrete Girders (Type Quad Beam) | 947 | LNFT | 210.00 | 198,870.00 | 385.00 | 364,595.00 | 260.00 | 246,220.00 | | 0051 | 805-18-00100 | Concrete Finish (Class 2 Rubbed Finish) | 2,190 | SQFT | 2.50 | 5,475.00 | 2.00 | 4,380.00 | 4.00 | 8,760.00 | | 0052 | 805-18-00200 | Concrete Finish (Class 3 Special Finish) | 2,190 | SQFT | 3.00 | 6,570.00 | 2.00 | 4,380.00 | 2.00 | 4,380.00 | | 0053 | 806-01-00100 | Deformed Reinforcing Steel | 58,439 | LB | 1.50 | 87,658.50 | 1.75 | 102,268.25 | 1.50 | 87,658.50 | | 0054 | 807-02-00100 | Structural Metalwork (Anchor Bolts) | 46 | LUMP | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | | 0055 | 807-04-00100 | Structural Metalwork Miscellaneous | 128 | LUMP | 6,000.00 | 6,000.00 | 3,500.00 | 3,500.00 | 12,000.00 | 12,000.00 | | 0056 | 810-01-00120 | Concrete Bridge Railing (36 inch Height) | 320 | LNFT | 220.00 | 70,400.00 | 300.00 | 96,000.00 | 170.00 | 54,400.00 | | 0057 | 813-01-00100 | Concrete Approach Slabs (Cast-in-Place) | 2,560 | SQFT | 110.00 | 281,600.00 | 115.00 | 294,400.00 | 110.00 | 281,600.00 | | 0058 | 814-01-00100 | Elastomeric Bearing Pads (Non-Reinforced) | 12 | SFIN | 300.00 | 3,600.00 | 300.00 | 3,600.00 | 400.00 | 4,800.00 | | 0059 | 814-02-00100 | Elastomeric Bearing Pads (Reinforced) | 60 | SFIN | 140.00 | 8,400.00 | 180.00 | 10,800.00 | 160.00 | 9,600.00 | | 0060 | 815-02-00100 | Sealed Expansion Joint (End Dams and Preformed Neoprene Seal) | 138 | LNFT | 400.00 | 55,200.00 | 525.00 | 72,450.00 | 450.00 | 62,100.00 | | 0061 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 192 | LNFT | 19.00 | 3,648.00 | 16.00 | 3,072.00 | 19.00 | 3,648.00 | | 0062 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 320 | LNFT | 6.00 | 1,920.00 | 10.00 | 3,200.00 | 5.00 | 1,600.00 | | 0063 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 433 | INLF | 3.50 | 1,515.50 | 7.50 | 3,247.50 | 4.00 | 1,732.00 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 3,324,747.37 | | 3,325,549.25 | | 3,445,828.30 |
|