Proposal:H.010331.6
Parish:Orleans
Routes:US 90
Description:US 90: FLOODWALL - VICTORY ROAD
Type Construction:BORROW, MILLING ASPHALT CONCRETE, GRADING, PAVEMENT PATCHING,ASPHALT CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost:$2,303,913.50
| Rank | License | Bidder | Construction Bid |
| 1 | 02179 | Boh Bros. Construction Co., LLC. | $2,052,738.87 |
| 2 | 73475 | Madden Gulf Coast, LLC | $2,079,577.40 |
| 3 | 06276 | Barriere Construction Co., LLC | $2,217,777.00 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - Boh Bros. Construction Co., LLC. | - 2 - Madden Gulf Coast, LLC | - 3 - Barriere Construction Co., LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-02-38220 | Removal of Sign Supports | 9 | EACH | 125.00 | 1,125.00 | 195.00 | 1,755.00 | 105.00 | 945.00 | | 0002 | 202-03-38000 | Relocation of Sign (ADJUST SIGN HEIGHT) | 7 | EACH | 200.00 | 1,400.00 | 50.00 | 350.00 | 27.00 | 189.00 | | 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,676 | CUYD | 10.00 | 16,760.00 | 63.00 | 105,588.00 | 1.00 | 1,676.00 | | 0004 | 401-01-00100 | Aggregate Surface Course (Net Section) | 53.8 | CUYD | 100.00 | 5,380.00 | 40.00 | 2,152.00 | 70.00 | 3,766.00 | | 0005 | 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 70.8 | CUYD | 75.00 | 5,310.00 | 40.00 | 2,832.00 | 0.01 | 0.71 | | 0006 | 502-01-00100 | Asphalt Concrete | 12,307.3 | TON | 105.00 | 1,292,266.50 | 112.25 | 1,381,494.43 | 140.00 | 1,723,022.00 | | 0007 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,373 | TON | 150.00 | 205,950.00 | 45.00 | 61,785.00 | 1.00 | 1,373.00 | | 0008 | 509-01-00100 | Milling Asphalt Pavement | 22,251 | SQYD | 3.00 | 66,753.00 | 2.50 | 55,627.50 | 3.25 | 72,315.75 | | 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -742.8 | CUYD | 0.01 | -7.43 | 0.01 | -7.43 | 0.01 | -7.43 | | 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 120,000.00 | 120,000.00 | 125,000.00 | 125,000.00 | | 0011 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6.044 | MILE | 250.00 | 1,511.00 | 400.00 | 2,417.60 | 485.00 | 2,931.34 | | 0012 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 6.044 | MILE | 350.00 | 2,115.40 | 700.00 | 4,230.80 | 700.00 | 4,230.80 | | 0013 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 12.088 | MILE | 525.00 | 6,346.20 | 1,000.00 | 12,088.00 | 1,000.00 | 12,088.00 | | 0014 | 716-01-00100 | Mulch (Vegetative) | 0.5 | TON | 7,000.00 | 3,500.00 | 6,550.00 | 3,275.00 | 2,750.00 | 1,375.00 | | 0015 | 717-01-00100 | Seeding | 61 | LB | 20.00 | 1,220.00 | 11.00 | 671.00 | 27.00 | 1,647.00 | | 0016 | 718-01-00100 | Fertilizer | 2,183 | LB | 1.00 | 2,183.00 | 1.00 | 2,183.00 | 0.70 | 1,528.10 | | 0017 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 6.004 | MILE | 300.00 | 1,801.20 | 1,000.00 | 6,004.00 | 300.00 | 1,801.20 | | 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 175,000.00 | 175,000.00 | 200,000.00 | 200,000.00 | 100,000.00 | 100,000.00 | | 0019 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 9 | EACH | 250.00 | 2,250.00 | 195.00 | 1,755.00 | 275.00 | 2,475.00 | | 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 3,054 | EACH | 4.25 | 12,979.50 | 4.00 | 12,216.00 | 4.50 | 13,743.00 | | 0021 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 822 | LNFT | 15.00 | 12,330.00 | 14.00 | 11,508.00 | 15.50 | 12,741.00 | | 0022 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 6.044 | MILE | 4,500.00 | 27,198.00 | 4,400.00 | 26,593.60 | 4,850.00 | 29,313.40 | | 0023 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.022 | MILE | 1,500.00 | 4,533.00 | 1,200.00 | 3,626.40 | 1,300.00 | 3,928.60 | | 0024 | 732-05-00100 | Removal of Existing Markings | 0.929 | MILE | 3,500.00 | 3,251.50 | 7,000.00 | 6,503.00 | 7,000.00 | 6,503.00 | | 0025 | 735-01-00100 | Mailboxes | 15 | EACH | 40.00 | 600.00 | 25.00 | 375.00 | 1.00 | 15.00 | | 0026 | 735-02-00100 | Mailbox Supports (Single) | 15 | EACH | 275.00 | 4,125.00 | 275.00 | 4,125.00 | 275.00 | 4,125.00 | | 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 10,500.00 | 10,500.00 | 49,227.43 | 49,227.43 | | 0028 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphalt Concrete Overlay | 8,300 | LNFT | 2.00 | 16,600.00 | 2.00 | 16,600.00 | 1.85 | 15,355.00 | | 0029 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay | 3,986 | LNFT | 2.00 | 7,972.00 | 2.00 | 7,972.00 | 3.25 | 12,954.50 | | 0030 | NS-500-00260 | Sawcuts in Asphalt Concrete Lifts | 12,286 | LNFT | 1.00 | 12,286.00 | 1.25 | 15,357.50 | 1.10 | 13,514.60 | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 2,052,738.87 | | 2,079,577.40 | | 2,217,777.00 |
|