Proposal:H.016103.6
Parish:Calcasieu
Routes:LA 14
Description:LA 14: LA 397 - GERSTNER MEMORIAL
Type Construction:DRAINAGE STRUCTURES, MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, AND OTHER RELATED WORK.
Estimated Construction Cost:$5,833,851.19
| Rank | License | Bidder | Construction Bid |
| 1 | 52306 | SIEMA CONSTRUCTION, LLC | $5,616,755.88 |
| 2 | 34356 | Prairie Contractors LLC | $5,719,304.85 |
| 3 | 30774 | Progressive Construction Co., LLC | $6,307,618.02 |
| 4 | 39155 | HD Truck & Tractor, LLC | $6,869,429.71 |
Line Number | Item Number | Item Description | Quantity | Unit of Measure | - 1 - SIEMA CONSTRUCTION, LLC | - 2 - Prairie Contractors LLC | - 3 - Progressive Construction Co., LLC | - 4 - HD Truck & Tractor, LLC | | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | Unit Price | Total Amount | | 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 68,000.00 | 68,000.00 | 80,000.00 | 80,000.00 | 85,000.00 | 85,000.00 | 225,000.00 | 225,000.00 | | 0002 | 202-02-03030 | Removal of Pavement Structure | 1,030.8 | SQYD | 16.25 | 16,750.50 | 20.00 | 20,616.00 | 35.00 | 36,078.00 | 29.00 | 29,893.20 | | 0003 | 202-03-38000 | Relocation of Sign Applied at STA 93+01 at Western DR. | 1 | EACH | 169.00 | 169.00 | 300.00 | 300.00 | 438.00 | 438.00 | 175.00 | 175.00 | | 0004 | 203-04-00100 | Nonplastic Embankment | 266 | CUYD | 157.00 | 41,762.00 | 100.00 | 26,600.00 | 63.00 | 16,758.00 | 200.00 | 53,200.00 | | 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 144,000.00 | 144,000.00 | 175,000.00 | 175,000.00 | 100,000.00 | 100,000.00 | 175,000.00 | 175,000.00 | | 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 87.5 | CUYD | 125.00 | 10,937.50 | 150.00 | 13,125.00 | 67.00 | 5,862.50 | 200.00 | 17,500.00 | | 0007 | 203-10-00100 | Cleaning Existing Ditches | 14,280 | LNFT | 12.00 | 171,360.00 | 15.00 | 214,200.00 | 18.00 | 257,040.00 | 15.50 | 221,340.00 | | 0008 | 204-02-00100 | Temporary Hay Bales | 20 | EACH | 78.00 | 1,560.00 | 30.00 | 600.00 | 42.00 | 840.00 | 28.00 | 560.00 | | 0009 | 204-05-00050 | Temporary Sediment Check Dams Within roadside ditches as needed | 8 | EACH | 169.00 | 1,352.00 | 245.00 | 1,960.00 | 250.00 | 2,000.00 | 150.00 | 1,200.00 | | 0010 | 204-06-00100 | Temporary Silt Fencing | 29,092 | LNFT | 2.10 | 61,093.20 | 1.75 | 50,911.00 | 4.00 | 116,368.00 | 2.00 | 58,184.00 | | 0011 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 84 | CUYD | 142.00 | 11,928.00 | 150.00 | 12,600.00 | 317.00 | 26,628.00 | 365.00 | 30,660.00 | | 0012 | 502-01-00100 | Asphalt Concrete | 9,486.1 | TON | 145.00 | 1,375,484.50 | 125.00 | 1,185,762.50 | 150.00 | 1,422,915.00 | 135.00 | 1,280,623.50 | | 0013 | 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 1,367.5 | TON | 154.00 | 210,595.00 | 250.00 | 341,875.00 | 158.00 | 216,065.00 | 141.00 | 192,817.50 | | 0014 | 509-01-00100 | Milling Asphalt Pavement | 38,063 | SQYD | 4.75 | 180,799.25 | 3.15 | 119,898.45 | 5.00 | 190,315.00 | 4.25 | 161,767.75 | | 0015 | 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -1,820 | CUYD | 0.01 | -18.20 | 0.01 | -18.20 | 0.01 | -18.20 | 0.01 | -18.20 | | 0016 | 510-01-00260 | Pavement Patching (16 inch Minimum Thickness) | 750 | SQYD | 192.00 | 144,000.00 | 215.00 | 161,250.00 | 172.00 | 129,000.00 | 171.00 | 128,250.00 | | 0017 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 16 | LNFT | 375.00 | 6,000.00 | 450.00 | 7,200.00 | 413.00 | 6,608.00 | 825.00 | 13,200.00 | | 0018 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 188 | LNFT | 206.00 | 38,728.00 | 250.00 | 47,000.00 | 335.00 | 62,980.00 | 435.00 | 81,780.00 | | 0019 | 701-03-01022 | Storm Drain Pipe (18" RCP/RPVCP) | 134 | LNFT | 216.00 | 28,944.00 | 265.00 | 35,510.00 | 135.00 | 18,090.00 | 190.00 | 25,460.00 | | 0020 | 701-03-01042 | Storm Drain Pipe (24" RCP/RPVCP) | 1,396 | LNFT | 160.00 | 223,360.00 | 160.00 | 223,360.00 | 125.00 | 174,500.00 | 150.00 | 209,400.00 | | 0021 | 701-03-01062 | Storm Drain Pipe (30" RCP/RPVCP) | 251 | LNFT | 190.00 | 47,690.00 | 225.00 | 56,475.00 | 159.00 | 39,909.00 | 210.00 | 52,710.00 | | 0022 | 701-03-01082 | Storm Drain Pipe (36" RCP/RPVCP) | 86 | LNFT | 256.00 | 22,016.00 | 300.00 | 25,800.00 | 222.00 | 19,092.00 | 320.00 | 27,520.00 | | 0023 | 701-03-01092 | Storm Drain Pipe (42" RCP/RPVCP) | 92 | LNFT | 206.00 | 18,952.00 | 250.00 | 23,000.00 | 265.00 | 24,380.00 | 315.00 | 28,980.00 | | 0024 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 16 | LNFT | 455.00 | 7,280.00 | 550.00 | 8,800.00 | 267.00 | 4,272.00 | 200.00 | 3,200.00 | | 0025 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 54 | LNFT | 260.00 | 14,040.00 | 325.00 | 17,550.00 | 224.00 | 12,096.00 | 235.00 | 12,690.00 | | 0026 | 701-05-01046 | Side Drain Pipe (18" RCP/RPVCP) | 24 | LNFT | 305.00 | 7,320.00 | 375.00 | 9,000.00 | 128.00 | 3,072.00 | 120.00 | 2,880.00 | | 0027 | 701-05-01064 | Side Drain Pipe (24" RCP/RPVCP/CPEPDW) | 318 | LNFT | 130.00 | 41,340.00 | 150.00 | 47,700.00 | 160.00 | 50,880.00 | 150.00 | 47,700.00 | | 0028 | 701-05-01106 | Side Drain Pipe (36" RCP/RPVCP) | 184 | LNFT | 185.00 | 34,040.00 | 225.00 | 41,400.00 | 214.00 | 39,376.00 | 262.00 | 48,208.00 | | 0029 | 701-06-00020 | Side Drain Pipe Arch (18" Equiv. RCPA) | 100 | LNFT | 131.00 | 13,100.00 | 150.00 | 15,000.00 | 130.00 | 13,000.00 | 125.00 | 12,500.00 | | 0030 | 701-14-00100 | Cleaning Existing Pipes (12" / 15" / 18") | 2,264 | LNFT | 4.00 | 9,056.00 | 5.00 | 11,320.00 | 39.00 | 88,296.00 | 48.00 | 108,672.00 | | 0031 | 701-14-00100 | Cleaning Existing Pipes (24" / 30" / 36") | 1,307 | LNFT | 5.00 | 6,535.00 | 6.00 | 7,842.00 | 39.00 | 50,973.00 | 54.00 | 70,578.00 | | 0032 | 701-14-00100 | Cleaning Existing Pipes (48" / Box Culverts) | 142 | LNFT | 10.00 | 1,420.00 | 12.00 | 1,704.00 | 236.00 | 33,512.00 | 213.00 | 30,246.00 | | 0033 | 701-15-00100 | Concrete Collar | 25 | EACH | 2,500.00 | 62,500.00 | 3,000.00 | 75,000.00 | 1,655.00 | 41,375.00 | 2,450.00 | 61,250.00 | | 0034 | 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 188 | LNFT | 64.00 | 12,032.00 | 75.00 | 14,100.00 | 37.00 | 6,956.00 | 25.00 | 4,700.00 | | 0035 | 702-02-00200 | Manholes (R-CB-11) | 8 | EACH | 5,400.00 | 43,200.00 | 6,500.00 | 52,000.00 | 5,808.00 | 46,464.00 | 7,500.00 | 60,000.00 | | 0036 | 702-03-00100 | Catch Basins (CB-01) | 41 | EACH | 5,500.00 | 225,500.00 | 5,500.00 | 225,500.00 | 5,200.00 | 213,200.00 | 7,500.00 | 307,500.00 | | 0037 | 702-03-00200 | Catch Basins (CB-02) | 3 | EACH | 6,720.00 | 20,160.00 | 8,000.00 | 24,000.00 | 7,419.00 | 22,257.00 | 12,000.00 | 36,000.00 | | 0038 | 702-08-00100 | Side Drain Safety End (Type 1) | 1 | EACH | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 | 5,404.00 | 5,404.00 | 11,000.00 | 11,000.00 | | 0039 | 702-08-00200 | Side Drain Safety End (Type 2) | 2 | EACH | 20,000.00 | 40,000.00 | 24,000.00 | 48,000.00 | 14,367.00 | 28,734.00 | 20,000.00 | 40,000.00 | | 0040 | 704-03-00200 | Blocked Out Guard Rail - 31", (6'-3" Post Spacing) | 762.5 | LNFT | 33.50 | 25,543.75 | 45.00 | 34,312.50 | 45.00 | 34,312.50 | 35.00 | 26,687.50 | | 0041 | 704-10-00105 | Guard Rail End Treatment (Flared, 12' - 6" Length) | 1 | EACH | 4,505.00 | 4,505.00 | 7,500.00 | 7,500.00 | 7,500.00 | 7,500.00 | 4,650.00 | 4,650.00 | | 0042 | 704-10-00204 | Guard Rail End Treatment, MASH, (TL-2 Tangent) | 2 | EACH | 3,500.00 | 7,000.00 | 4,500.00 | 9,000.00 | 4,813.00 | 9,626.00 | 3,580.00 | 7,160.00 | | 0043 | 704-10-00205 | Guard Rail End Treatment, MASH, (TL-3 Tangent) | 5 | EACH | 3,400.00 | 17,000.00 | 5,000.00 | 25,000.00 | 5,157.00 | 25,785.00 | 3,500.00 | 17,500.00 | | 0044 | 706-03-00500 | Incidental Concrete Paving (8" Thick) | 159.8 | SQYD | 300.00 | 47,940.00 | 360.00 | 57,528.00 | 212.00 | 33,877.60 | 120.00 | 19,176.00 | | 0045 | 707-01-00100 | Concrete Curb | 188.76 | LNFT | 32.00 | 6,040.32 | 40.00 | 7,550.40 | 33.00 | 6,229.08 | 12.00 | 2,265.12 | | 0046 | 710-01-00120 | Flowable Fill (Non-Excavatable) | 488.14 | CUYD | 200.00 | 97,628.00 | 200.00 | 97,628.00 | 448.00 | 218,686.72 | 275.00 | 134,238.50 | | 0047 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 560 | SQYD | 105.00 | 58,800.00 | 125.00 | 70,000.00 | 100.00 | 56,000.00 | 225.00 | 126,000.00 | | 0048 | 711-04-00100 | Geotextile Fabric | 560 | SQYD | 5.00 | 2,800.00 | 6.00 | 3,360.00 | 3.00 | 1,680.00 | 6.00 | 3,360.00 | | 0049 | 712-02-00100 | Sacked Concrete Revetment | 24 | SQYD | 500.00 | 12,000.00 | 600.00 | 14,400.00 | 200.00 | 4,800.00 | 975.00 | 23,400.00 | | 0050 | 712-04-00100 | Flexible Revetment | 42 | SQYD | 120.00 | 5,040.00 | 150.00 | 6,300.00 | 107.00 | 4,494.00 | 700.00 | 29,400.00 | | 0051 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 200,000.00 | 200,000.00 | 175,000.00 | 175,000.00 | 150,000.00 | 150,000.00 | 413,000.00 | 413,000.00 | | 0052 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 856 | LNFT | 0.28 | 239.68 | 0.01 | 8.56 | 1.00 | 856.00 | 0.26 | 222.56 | | 0053 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 1.15 | 27.60 | 0.01 | 0.24 | 2.00 | 48.00 | 1.10 | 26.40 | | 0054 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 8.535 | MILE | 1,015.00 | 8,663.03 | 650.00 | 5,547.75 | 565.00 | 4,822.28 | 1,000.00 | 8,535.00 | | 0055 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.692 | MILE | 900.00 | 6,922.80 | 800.00 | 6,153.60 | 1,000.00 | 7,692.00 | 900.00 | 6,922.80 | | 0056 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 14.75 | MILE | 1,350.00 | 19,912.50 | 1,200.00 | 17,700.00 | 1,500.00 | 22,125.00 | 1,250.00 | 18,437.50 | | 0057 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 56.00 | 224.00 | 1.00 | 4.00 | 63.00 | 252.00 | 50.00 | 200.00 | | 0058 | 714-01-00600 | Slab Sodding (St. Augustine) | 288 | SQYD | 9.00 | 2,592.00 | 12.00 | 3,456.00 | 13.00 | 3,744.00 | 11.00 | 3,168.00 | | 0059 | 724-01-00100 | Rumble Strips (Centerline) | 2.76 | MILE | 625.00 | 1,725.00 | 1,200.00 | 3,312.00 | 375.00 | 1,035.00 | 1,150.00 | 3,174.00 | | 0060 | 724-02-00100 | Rumble Strips (Shoulder/Edge) | 5.51 | MILE | 485.00 | 2,672.35 | 1,200.00 | 6,612.00 | 375.00 | 2,066.25 | 1,150.00 | 6,336.50 | | 0061 | 726-01-00100 | Bedding Material | 226.9 | CUYD | 168.00 | 38,119.20 | 175.00 | 39,707.50 | 166.00 | 37,665.40 | 285.00 | 64,666.50 | | 0062 | 727-01-00100 | Mobilization | 1 | LUMP | 415,000.00 | 415,000.00 | 450,000.00 | 450,000.00 | 610,000.00 | 610,000.00 | 475,000.00 | 475,000.00 | | 0063 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 20.53 | SQFT | 40.00 | 821.20 | 60.00 | 1,231.80 | 63.00 | 1,293.39 | 36.00 | 739.08 | | 0064 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 95.00 | 380.00 | 165.00 | 660.00 | 169.00 | 676.00 | 86.00 | 344.00 | | 0065 | 729-22-00100 | Square Tubing Post with 2-1/4" Anchor | 4 | EACH | 254.00 | 1,016.00 | 175.00 | 700.00 | 188.00 | 752.00 | 225.00 | 900.00 | | 0066 | 731-02-00100 | Reflectorized Raised Pavement Markers | 389 | EACH | 6.75 | 2,625.75 | 7.00 | 2,723.00 | 8.00 | 3,112.00 | 6.00 | 2,334.00 | | 0067 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 428 | LNFT | 3.40 | 1,455.20 | 3.75 | 1,605.00 | 4.00 | 1,712.00 | 3.50 | 1,498.00 | | 0068 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 24 | LNFT | 17.00 | 408.00 | 18.00 | 432.00 | 15.00 | 360.00 | 15.75 | 378.00 | | 0069 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 7.38 | MILE | 5,950.00 | 43,911.00 | 6,250.00 | 46,125.00 | 6,625.00 | 48,892.50 | 5,500.00 | 40,590.00 | | 0070 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.56 | MILE | 3,250.00 | 8,320.00 | 3,500.00 | 8,960.00 | 3,625.00 | 9,280.00 | 3,000.00 | 7,680.00 | | 0071 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 1,125.00 | 2,250.00 | 1,250.00 | 2,500.00 | 1,250.00 | 2,500.00 | 1,250.00 | 2,500.00 | | 0072 | 735-01-00100 | Mailboxes | 5 | EACH | 22.50 | 112.50 | 10.00 | 50.00 | 2.00 | 10.00 | 19.00 | 95.00 | | 0073 | 735-02-00100 | Mailbox Supports (Single) | 5 | EACH | 281.51 | 1,407.55 | 500.00 | 2,500.00 | 500.00 | 2,500.00 | 250.00 | 1,250.00 | | 0074 | 739-01-00100 | Hydro-Seeding | 10 | ACRE | 2,925.00 | 29,250.00 | 3,500.00 | 35,000.00 | 3,738.00 | 37,380.00 | 3,400.00 | 34,000.00 | | 0075 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 75,000.00 | 75,000.00 | 191,000.00 | 191,000.00 | | 0076 | 805-16-00700 | Reinforced Concrete Box Culverts (Extension) (6' x 5') | 16 | LNFT | 4,725.00 | 75,600.00 | 5,500.00 | 88,000.00 | 3,466.00 | 55,456.00 | 4,500.00 | 72,000.00 | | 0077 | 805-16-01300 | Reinforced Concrete Box Culverts (Extension) (7' x 6') | 16 | LNFT | 4,730.00 | 75,680.00 | 5,500.00 | 88,000.00 | 3,608.00 | 57,728.00 | 4,900.00 | 78,400.00 | | 0078 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall FOR 6'X5':
STEEL QUANTITY: 1173.12 IBS
CONCRETE QUANTITY: 8.99 CUYD | 2 | EACH | 20,000.00 | 40,000.00 | 25,000.00 | 50,000.00 | 37,261.00 | 74,522.00 | 73,000.00 | 146,000.00 | | 0079 | 805-17-00100 | Reinforced Concrete Box Culvert Headwall FOR 7'X6':
STEEL QUANTITY: 1463.68 IBS
CONCRETE QUANTITY: 10.82 CUYD | 2 | EACH | 22,000.00 | 44,000.00 | 26,000.00 | 52,000.00 | 40,442.00 | 80,884.00 | 70,000.00 | 140,000.00 | | 0080 | NS-300-00060 | Geogrid | 283 | SQYD | 6.00 | 1,698.00 | 10.00 | 2,830.00 | 5.00 | 1,415.00 | 4.00 | 1,132.00 | | 0081 | NS-401-00100 | Hot-Mix Asphalt Aggregate Surface Course | 4,986 | TON | 131.50 | 655,659.00 | 125.00 | 623,250.00 | 132.00 | 658,152.00 | 121.00 | 603,306.00 | | 0082 | NS-500-00340 | Saw Cutting Asphalt Concrete Pavement | 3,960 | INLF | 1.15 | 4,554.00 | 3.00 | 11,880.00 | 2.00 | 7,920.00 | 1.50 | 5,940.00 | | 0083 | NS-502-04200 | Reinforced Paving Mat for Asphalt Concrete Overlay | 36,709 | SQYD | 5.25 | 192,722.25 | 4.25 | 156,013.25 | 7.00 | 256,963.00 | 5.50 | 201,899.50 | | 0084 | NS-502-04210 | Asphalt Tack Coat | 5,507 | GAL | 11.35 | 62,504.45 | 10.50 | 57,823.50 | 14.00 | 77,098.00 | 13.00 | 71,591.00 | | | | | | | | | | | | | | | | | | CONTRACTOR TOTAL | | | | 5,616,755.88 | | 5,719,304.85 | | 6,307,618.02 | | 6,869,429.71 |
|